Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1651 - 1680 of 6788

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson Aug 2023

Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Optimizing Edge-Of-Field Water Quality Monitoring Methods To Determine The Effects Of Best Management Practices On Nutrient And Sediment Runoff, Mark Hill Aug 2023

Optimizing Edge-Of-Field Water Quality Monitoring Methods To Determine The Effects Of Best Management Practices On Nutrient And Sediment Runoff, Mark Hill

Theses and Dissertations

This study investigates the impact on water quality of combined agricultural best management practices cover crop and minimum tillage, alongside an examination of techniques used to collect those samples. Edge-of-field (EOF) water quality samples were collected from 11 working farms during a two-year paired field experiment. Results showed significant reductions in nutrient concentrations, increased discharge, and mixed findings regarding nutrient mass transport post-treatment. A suite of EOF collection techniques were compared using in-situ automated water sampling systems sampling the same runoff events. Sampling protocols influenced nutrient concentrations in composite samples, but unexpected variance in velocity sensors affected measured discharge, making …


Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills Aug 2023

Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills

Theses and Dissertations

Trace element sediment pollution due to coal power plants have been reported in many countries. In this study, pond sediment samples collected from locations around a coal fired power plant in Ackerman, MS, were evaluated for their trace element concentration and pollution status. The samples were collected at two depths to study changes in element accumulation over time. The samples were digested and the elements, As, Cd, Cr, Cu, Pb, Hg, and Zn were analyzed using ICP-MS. Results were then compared to known background concentrations as well as sediment quality guidelines and pollution thresholds. The sample locations downwind of the …


Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc. Aug 2023

2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc. Aug 2023

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas, Kristi Patterson Aug 2023

Distribution And Habitat Associations Of The Georgia Satyr (Neonympha Areolatus) In Arkansas, Kristi Patterson

ATU Theses and Dissertations 2021 - Present

The Georgia satyr (Neonympha areolatus) is a small sedentary butterfly that is rare in Arkansas. Currently, the exact locations of this butterfly in Arkansas are unknown, along with the habitat characteristics associated with their presence. In order to determine these unknowns, I completed 104 surveys across seven different wildlife management areas in southern Arkansas. Pollard-Yates transects were conducted at each study site, and weather variables were recorded before each survey. Vegetation surveys were also completed at each site, and where each Georgia satyr was identified. Generalized linear models (GLM) were created to identify what parameters are important for …


Analyzing The Adoption, Cropping Rotation, And Impact Of Winter Cover Crops In The Mississippi Alluvial Plain (Map) Region Through Remote Sensing Technologies, Zobaer Ahmed Aug 2023

Analyzing The Adoption, Cropping Rotation, And Impact Of Winter Cover Crops In The Mississippi Alluvial Plain (Map) Region Through Remote Sensing Technologies, Zobaer Ahmed

Graduate Theses and Dissertations

This dissertation explores the application of remote sensing technologies in conservation agriculture, specifically focusing on identifying and mapping winter cover crops and assessing voluntary cover crop adoption and cropping patterns in the Arkansas portion of the Mississippi Alluvial Plain (MAP). In the first chapter, a systematic review using the PRISMA methodology examines the last 30 years of thematic research, development, and trends in remote sensing applied to conservation agriculture from a global perspective. The review uncovers a growing interest in remote sensing-based research in conservation agriculture and emphasizes the necessity for further studies dedicated to conservation practices. Among the 68 …


Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon Aug 2023

Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon

All Dissertations

In Colombia, ethnic communities have traditionally been responsible stewards of natural resources. They recognize the importance of these resources for their livelihood, as well as their ancestral and cultural heritage. El Tiple, a rural Afro-Colombian community, has been affected by the incursion of private corporations that promoted the expansion of sugarcane monocrops in their territory. Since the introduction of the monoculture industry, local freshwater sources have been depleted due to intensive water use for irrigation of the sugarcane crops. Additionally, the intensive usage of agrochemicals has been linked with loss of native flora, damages to family farms, and pollution of …


Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023, Department Of Primary Industries And Regional Development, Western Australia Aug 2023

Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023, Department Of Primary Industries And Regional Development, Western Australia

Irrigated Agricultural Development in the North

The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).

The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.

The Department of Primary Industries and Regional Development is the Goomig …


High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina, Gavin Gleasman Aug 2023

High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina, Gavin Gleasman

All Dissertations

Atmospheric carbon dioxide (CO2) concentrations have been increasing at an accelerating rate for the past two centuries, profoundly impacting global climate change. Atmospheric CO2 concentrations are influenced by the global carbon cycle through physical and biogeochemical pathways. Tidal wetland environments play a vital role in the global carbon cycle by offsetting atmospheric CO2 concentrations through their natural physiochemical processes of high autotrophic productivity, allochthonous organic matter deposition, anoxic soils, and continuous accretion which promotes carbon sequestration with long-term storage at the land-ocean margin. The Intergovernmental Panel on Climate Change (IPCC) and United States Global Change Research …


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Aug 2023

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.