Open Access. Powered by Scholars. Published by Universities.®

2025

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 1 - 30 of 474

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Effect Of Incentives On Disaster Mitigation Behavior: An Age-Based Analysis, Wenqian He, Jeffrey Wickliffe, Zhen Cong Dec 2025

The Effect Of Incentives On Disaster Mitigation Behavior: An Age-Based Analysis, Wenqian He, Jeffrey Wickliffe, Zhen Cong

Health Sciences and Kinesiology Faculty Articles

Background

As climate change accelerates, the frequency and severity of natural disasters are increasing. However, most individuals cannot get sufficient protective measures due to financial pressure or environmental barriers. This study aims to examine how different incentives influence people’s willingness to take mitigation behavior. Methods

Data were collected from 781 tornado survivors in Texas, Alabama, and Tennessee, as part of the ‘Vulnerability and Resilience to Disasters’ project. Participants were randomly assigned to 12 conditions based on cost coverage ratios (25%, 50%, 75%), improvement types (storm shelters, structural reinforcement), and incentive forms (cash rebates, insurance discounts). Multivariate logistic regression models were …


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby Dec 2025

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo Dec 2025

Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo

Sinaya: A Philippine Journal for Senior High School Teachers and Students

The long-term use of agricultural products that adversely affect soil is a significant issue for farmers. This study explored the potential of carbonized rice hulls (CRH) waste from biomass boilers as a sustainable soil conditioner. The research investigated the specific soil conditioning properties of CRH and explored the lived experiences of nine (9) Bukidnon farmers to correlate their observations with the material’s chemical profile. The composition analysis identified a high silica content and essential micronutrients, such as calcium and magnesium, which act as nutrient restorers and pH regulators. The thematic analysis of semi-structured interviews, four themes emerged to summarize the …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Dec 2025

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Wild Robots: Humans, Wilderness, And Technology In Becky Chambers’ Monk And Robot Series, Melissa Moore Dec 2025

Wild Robots: Humans, Wilderness, And Technology In Becky Chambers’ Monk And Robot Series, Melissa Moore

Honors Theses

As technology advances and the environment deteriorates, the way people view the relationships between technology, wilderness, and humans becomes essential for society to move forward. To investigate perceptions about technology’s place in an environmentally conscious society, this project examines manifestations of wilderness/wildness and technology in Becky Chambers’ Monk and Robot series through the lens of ecocriticism. Using Timothy Morton's concept of the ecological thought as a framework for analysis, the circumstances present in the novel suggest that the triangle separating humans, wilderness, and technology has actually collapsed, replaced by an enmeshment of technology, wilderness, and humanity.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta Dec 2025

A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta

Computer Science and Engineering Faculty Publications

Florida’s Gulf Coast red tide (Karenia brevis) can put toxins into the air, making people cough, irritating the throat, and worsening asthma or other breathing problems especially when winds blow from the ocean toward the beach. Right now, most public updates don’t really help with the question people actually ask when planning a weekend or vacation: “Will going to or close to the beach be risky in the next few weeks?”.

In this project, I build a weekly early warning system that estimates respiratory risk for specific beaches and predicts that risk 2 to 4 weeks ahead. The study covers …


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Dec 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area 2019-2023 Data Summary Report And Response To Epa Comments (Dated September 24, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area 2019-2023 Data Summary Report And Response To Epa Comments (Dated September 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.