Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1621 - 1650 of 6788

Full-Text Articles in Environmental Indicators and Impact Assessment

Verifying Empirical Predictive Modeling Of Societal Vulnerability To Hazardous Events: A Monte Carlo Experimental Approach, Yi Victor Wang, Seung Hee Kim, Menas C. Kafatos Aug 2023

Verifying Empirical Predictive Modeling Of Societal Vulnerability To Hazardous Events: A Monte Carlo Experimental Approach, Yi Victor Wang, Seung Hee Kim, Menas C. Kafatos

Institute for ECHO Articles and Research

With the emergence of large amounts of historical records on adverse impacts of hazardous events, empirical predictive modeling has been revived as a foundational paradigm for quantifying disaster vulnerability of societal systems. This paradigm models societal vulnerability to hazardous events as a vulnerability curve indicating an expected loss rate of a societal system with respect to a possible spectrum of intensity measure (IM) of an event. Although the empirical predictive models (EPMs) of societal vulnerability are calibrated on historical data, they should not be experimentally tested with data derived from field experiments on any societal system. Alternatively, in this paper, …


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ball Field, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ball Field, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Quality Assurance Project Plan (Qapp) (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Quality Assurance Project Plan (Qapp) (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Insar Time Series Analysis To Evaluate Subsidence Risk Of Monumental Chandigarh City (India) And Surroundings, Jungrack Kim, Shih-Yuan Lin, Tejpal Singh, Ramesh P. Singh Aug 2023

Insar Time Series Analysis To Evaluate Subsidence Risk Of Monumental Chandigarh City (India) And Surroundings, Jungrack Kim, Shih-Yuan Lin, Tejpal Singh, Ramesh P. Singh

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Groundwater depletion is one of the serious geo-environmental issues causing ground subsidence, which damage buildings, infrastructures and causes loss of life. The quantitative and qualitative evaluation of groundwater variability requires multiple approaches to measure hydraulic head level and geodetic deformation. In this study, we have made efforts to integrate multiple hierarchical space-borne data, including Gravity Recovery and Climate Experiment (GRACE), Sentinel-1 Interferometric Synthetic Aperture Radar (InSAR), geological and hydrological data, to quantify subsidence in Chandigarh city and its surroundings. First, we conducted New-Small BAseline Subsets (NSBAS) and pointwise persistent scatterer (PS) InSAR techniques in parallel, using three-years Sentinel-1 data showing …


Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene Aug 2023

Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson Aug 2023

Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh Aug 2023

Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Over the past three decades, thermal anomalies from satellite infrared data have been widely discussed and associated with earthquakes. Besides infrared satellite data, the recent use of passive microwave satellite data has emerged as an important dataset to detect the potential thermal anomalies prior to earthquakes in all weather conditions due to its capability to monitor the earth in cloudy and foggy conditions and has been applied to the numerous strong earthquake events around the world. On 5 September 2022, an Mw 6.6 earthquake occurred in Luding county, nearby Mt. Gongga, China, with heavy cloud coverage over the epicenter and …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.