Re: Approval Letter For The Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated August 28, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling And Investigation Plan – Ur-52 Area West Of Bres No. 133 – Dexter Mill, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur 51 – Area Near Bres No.50 –Zelia And Mountain Con Mine, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit Field Sampling Plan And Investigation Plan: Ur-41 - Montana Street And Interstate-90, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Diggings East 100% Remedial Design Package Submittal (Dated July 23, 2026), The 100% Sbcca Programmatic Technical Specifications Submittal (Technical Specifications) (Dated May 29, 2026), The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated July 29, 2026), The Final Sbcca Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated July 29, 2026), And The Final Sbcca Materials Management Plan (Mmp) (Dated July 29, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services
Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated May 6, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.