Sustainable Bus Stop: Design & Pre-Construction,
2021
California Polytechnic State University, San Luis Obispo
Sustainable Bus Stop: Design & Pre-Construction, Nadov O. Rader
Construction Management
The objective of this project is to design and prepare to build a sustainable bus stop for the City of San Luis Obispo (SLO). Compiled are pre-construction plans and documents for delivery of a sustainable bus stop. All pre-construction services include: project budget/estimates, construction plans and specifications including architectural and electrical plans, timeline/schedule, and materials lists. With a strong focus on sustainability, the design incorporates the use of photovoltaic panels as a form of renewable energy to power features of the sheltered bus stop. This includes a light fixture and a pump to use collected rainwater to nourish native vegetation …
Schedule Efficiency Associated With The Tilt-Up Construction Method: A Case Study,
2021
California Polytechnic State University, San Luis Obispo
Schedule Efficiency Associated With The Tilt-Up Construction Method: A Case Study, Jake A. Barron
Construction Management
Tilt-up is an efficient method of project delivery that is best suited for large, flat projects such as commercial warehouses and distribution centers. The hypothesis is that this method of casting wall panels on site, and then tilting them upright, allows for certain unique activity sequences which could provide faster project completion. In order to prove this theory, analysis of two tilt-up projects completed within a mile of each other by the same contractor, and assessment of their schedules, will provide insight into the specific tasks that allow for better delivery speed. This methodology paired with interviews of team members, …
Industry Perceptions On Public Sector Construction Delivery Methods,
2021
California Polytechnic State University, San Luis Obispo
Industry Perceptions On Public Sector Construction Delivery Methods, Evan Mccollough
Construction Management
The public construction sector in the United States has predominantly used the traditional delivery method, also known as design-bid-build, to obtain and deliver projects. Accurately assessing the direction of the public construction sector must include analysis of the emergence of Public-Private Partnerships (P3) and alternative delivery methods. P3 projects in the United States are relatively new, an emerging trend from the late 2000s as an innovative way to utilize private capital to finance public projects, beyond a typical bond sale. Alternative delivery methods refer to any project award or management arrangement other than the typical design-bid-build, lump sum, competitive bidding …
Paso Robles Police Department Outdoor Training Facility Improvements - Phase 1,
2021
California Polytechnic State University, San Luis Obispo
Paso Robles Police Department Outdoor Training Facility Improvements - Phase 1, Zachary T. Stellini
Construction Management
This paper outlines the pre-construction and construction of the 24,300 square foot Paso Robles Police Department outdoor training facility improvements. The project focuses 12,000 square feet of the total site with improvements that include earthwork and new concrete flatwork. This project is group project with Gavin Abraham and Nic Petri that is broken up into 3 phases, this paper will primarily focus on the phase 1 which includes grading and excavation. The purpose of this project was to provide the Paso Robles Police Department with a modern, functional facility that allows its officers to be better equipped to protect the …
Possible Use For Recycled Disposable Face Masks In Concrete,
2021
California Polytechnic State University, San Luis Obispo
Possible Use For Recycled Disposable Face Masks In Concrete, Lauren Douglas
Construction Management
Disposable face masks are one of many single use products that are detrimental to the environment. The construction industry has been introducing new ways to incorporate recycled products into their materials. This paper addresses one possible way to use more environmentally friendly materials in the construction industry. 16 concrete cylinders were prepared using 4x8 forms. The mix was manipulated to test the impact of incorporating varying levels of disposable shredded face masks. Compressive strength and workability were measured in these cylinders. Eight cylinders were prepared for the control batch. Four cylinders were prepared using 10 oz. of shredded face masks …
A Case Study On The Capacity And Competitiveness Of Small-Sized Contractors On The Central Coast Of California,
2021
California Polytechnic State University, San Luis Obispo
A Case Study On The Capacity And Competitiveness Of Small-Sized Contractors On The Central Coast Of California, Lev S. Garcia
Construction Management
The market conditions in which small-sized construction firms in California compete can be significantly influenced by the regional location of their projects. This research paper reviews a qualitative case study executed through semi-structured interviews with two construction firms on the Central Coast of California. Through gaining the perspectives of two companies, one that recently grew into a medium sized company and one that is small-sized, this case study aims to identify market characteristics that influence small-sized companies’ abilities to compete on the Central Coast. The case study indicates that competition between existing companies, the threat of new arrivals, the cost …
Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine,
2021
California Polytechnic State University, San Luis Obispo
Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine, Joseph Szillinsky
Construction Management
This paper outlines the design and construction of a new code compliant bathroom including: a low profile shower pan, ceramic-tile shower enclosure, and new plumbing piping and fixtures. One of the main objectives was to complete the new shower which would be easily accessible and maintenance free in order to support a local elderly couple. The selection of this project took place during the COVID-19 pandemic approximately nine months after California issued the first mandatory statewide Stay-at-Home Order. During the early design and development stages an opportunity to collaborate with a local trades-person was identified as well as the need …
Comparing The Environmental Impacts Of Using Mass Timber And Structural Steel,
2021
California Polytechnic State University, San Luis Obispo
Comparing The Environmental Impacts Of Using Mass Timber And Structural Steel, Khang Hoang Nguyen, Steelee Knight Morgan
Construction Management
Although mass timber has seen a gradual rise in demand in the past, there has been a lack of extensive research on the environmental impacts of using mass timber as a primary structural framing material. This paper compares structural steel, and mass timber’s total embodied carbon emissions. Accurate estimates were made using plans and specs for different projects retrieved from semi-structured interviews. The estimates were input through the EC3 Calculator to provide extensive total carbon emissions measurements between each construction material. Using structural steel framing increased the project’s overall environmental impact by roughly 84% compared to using mass timber. The …
Bs News March/April,
2021
Technological University Dublin
Initial Assessment Of Liquefied Scrap Tire Concrete,
2021
Intertek-PSI
Initial Assessment Of Liquefied Scrap Tire Concrete, Abdulkareem Kuaryouti, Christopher D. Eamon
Civil and Environmental Engineering Faculty Research Publications
A new approach to incorporate scrap tire material into concrete was investigated, where two reclaimed waste tire components, carbon black and fuel oil, were used to replace a portion of water. The effect of “liquid tire” content to water ratios from 5-40% on an otherwise typical concrete mix were assessed, where compressive and flexural strength, flexural toughness, modulus of elasticity, and several fresh concrete properties were determined. Results were compared to typically expected results of traditional shredded tire mixes with equivalent tire content. It was found that the liquid tire mixes experienced significantly less losses of compressive strength and workability …
Quantifying Materials Waste In The Egyptian Construction Industry: A Critical Analysis Of Rates And Factors,
2021
The British University in Egypt
Quantifying Materials Waste In The Egyptian Construction Industry: A Critical Analysis Of Rates And Factors, Ayman Ahmed Ezzat Othman, Ahmed Osama Daoud Dr., Obas John Ebohon, Ali Bayyati
Architectural Engineering
Construction and demolition waste (CDW) is a critical challenge facing the construction industry. It leads to deterioration of the triple bottom line of sustainability. Unfortunately, the CDW management research in Egypt lacks studies investigating (1) the variations in CDW generation (CDWG) among different types of construction projects, and (2) the factors affecting CDW reduction (CDWR). Based on a benchmarking approach, this research (1) quantifies CDW in terms of generation rates and costs among different construction project types in Egypt, and (2) investigates the relationship between CDWG and different adopted CDWR factors. Using structured interviews, a comparative case study was conducted …
Multi-Skilled Labor Optimization With Partial Allocation Of Resources,
2021
American University in Cairo
Multi-Skilled Labor Optimization With Partial Allocation Of Resources, Amira Saleh
Theses and Dissertations
The current practice of labor allocation in construction schedules assumes single-skilled workforce; meaning that each worker is assumed to be skilled in only one trade. In such practice, at any instance in the project lifecycle, some of the workforce become idle waiting for other labor types to complete their work. Traditionally, companies may relocate idle workers to other projects and return them back to their original project when needed again. This complicates the resource management process and is not often performed successfully, leading to schedule and cost overruns. Alternatively, project managers may keep the idle workforce at their projects because …
A Web-Based Change Control Management Toolkit For Lump-Sum Turnkey Contractors: Transformation To Third Generation,
2021
American University in Cairo
A Web-Based Change Control Management Toolkit For Lump-Sum Turnkey Contractors: Transformation To Third Generation, Ahmed Omran
Theses and Dissertations
Project deviations and changes are one of the key common particulars encountered in the Construction industry. Project changes can occur in different forms, may impact different pillars of the project, and can be caused due to the existence of various underlying factors. Mismanaging or lack of controlling these changes is one of the key contributing factors leading to project hardships. Contractors incur profit erosion, scope creep, and time slippages mainly by failing to have an effective project change management system enforced within its project execution philosophy. Such adversity is amplified for contractors engaging in lump-sum turnkey “LSTK” projects. Contractors encounter …
Wearable Sensing Devices: Towards The Development Of A Personalized System For Construction Safety And Health Risk Mitigation,
2021
The University of Alabama
Wearable Sensing Devices: Towards The Development Of A Personalized System For Construction Safety And Health Risk Mitigation, Chukwuma Nnaji, Ibukun Awolusi, Jeewoong Park, Alex Albert
Civil and Environmental Engineering and Construction Faculty Research
Wearable sensing devices (WSDs) are increasingly helping workers stay safe and healthy in several industries. However, workers, especially in the construction industry, have shown some aversion towards the use of WSDs due to their ability to capture specific information that may be considered personal and private. However, this revered information may provide some critical insight needed by management to plan and optimize worksite safety and support technology adoption in decision making. Therefore, there is a need to develop personalized WSD systems that are mutually beneficial to workers and management to ensure successful WSD integration. The present study aims to contribute …
Using System Dynamics To Study The Effect Of Change Orders On Labor Productivity,
2021
The American University in Cairo AUC
Using System Dynamics To Study The Effect Of Change Orders On Labor Productivity, Shrouk Gharib
Theses and Dissertations
Change orders in construction projects lead to numerous negative impacts, including loss of labor productivity, delays, and cost overruns. Owners and contractors are usually in disagreement when it comes to allocating the extent of responsibilities with respect to the resulting overruns. Each party tries to hold the other party fully responsible for such overruns through a series of claims and disputes. Several delay analysis techniques have been developed to aid in settling such disputes, however, they do not fully grasp the rippled impacts of change orders and do not assist parties in reaching consensus when it comes to finding the …
A Critical Analysis Of The Application Of Augmented Reality (Ar) For Monitoring And Documentation Of Construction Site Progress In The Irish Aec Industry.,
2021
Technological University Dublin
A Critical Analysis Of The Application Of Augmented Reality (Ar) For Monitoring And Documentation Of Construction Site Progress In The Irish Aec Industry., Bim Tudublin, Lukasz Sarnot
Capstone Reports
Sarnot, L. (2021) A critical analysis of the application of augmented reality (AR) for monitoring and documentation of construction site progress in the Irish AEC industry, Capstone Project from the MSc in aBIMM
To What Extent Can Innovative International Project Delivery Strategies (Which Leverage Bim) Improve The Cost Certainty Of Large Complex Public Procurement Projects In The Context Of Irish Public Procurement?,
2021
Technological University Dublin
To What Extent Can Innovative International Project Delivery Strategies (Which Leverage Bim) Improve The Cost Certainty Of Large Complex Public Procurement Projects In The Context Of Irish Public Procurement?, Bim Tudublin, Roqaya Abouklaib
Capstone Reports
Cost overrun is one of the biggest issues in the construction sector, and cost certainty is one of the main aims of the public construction sector in Ireland. Studies have shown that multi-disciplinary collaboration will benefit a construction project throughout its lifecycle. BIM, Lean, and IPD are independent methodologies that encourage collaborative work, and there are existent effective synergies among these concepts. The synergetic innovative international strategies were utilised for delivering large complex projects successfully globally, and many authors have studied large complex public projects that have adopted innovative international project delivery strategies collaboratively and have shown that the cost …
Opportunities In The Irish Reinforced Concrete Industry For Lean And Bim Adoption,
2021
Technological University Dublin
Opportunities In The Irish Reinforced Concrete Industry For Lean And Bim Adoption, Bim Tudublin, Kieran Mcconnell
Capstone Reports
The Irish Reinforced Concrete (RC) sector has yet to realise the full potential of Building Information Modelling (BIM) and Lean construction. The positive impacts and benefits of both BIM and Lean in the wider Architecture, Engineering and Construction sector are widely recognised; many of these are transferable to the RC sector, but there is limited research and knowledge on practical transference, uses and advantages. This research aims to fill some of the existing knowledge gaps by examining BIM and Lean adoption and awareness in the Irish RC sector across sub-sectors, professions, and organisational levels, and by exploring opportunities for increasing …
A Critical Examination Of Visual Programming And Generative Design For The Compliance Checking Of Open Plan Office Layouts Against Hse Guidelines Post Covid-19.,
2021
Technological University Dublin
A Critical Examination Of Visual Programming And Generative Design For The Compliance Checking Of Open Plan Office Layouts Against Hse Guidelines Post Covid-19., Bim Tudublin, Ronan Byrne
Capstone Reports
The purpose of this study is to explore the feasibility of Visual Programming (VP) and Generative Design (GD) in assisting employers review open plan office layouts against Ireland’s HSE guidelines implemented in May 2020 in response to Covid-19. The pandemic has affected all areas of life with workplace standards requiring a complete overhaul. This study will attempt to ascertain compliance with natural ventilation and social distancing requirements through the completion of an experimental research study, utilising Computational Design (CD) tools. A GD study will be undertaken to provide the designer with numerous office layout design solutions to evaluate and evolve. …
Should Acoustic Simulation Technology Be Utilised In Architectural Practice? Does It Have The Potential For Bim Integration?,
2021
Technological University Dublin
Should Acoustic Simulation Technology Be Utilised In Architectural Practice? Does It Have The Potential For Bim Integration?, Bim Tudublin, Keith Harvey
Capstone Reports
The research presented in this paper, firstly, aims to convey the importance of our acoustic environment through focusing on the effects of undesirable acoustic conditions on cognitive abilities in spaces where cognitive performance is of the utmost concern, our learning environments. Secondly, it aims to investigate current state-of-the-art acoustic simulation methods, available platforms, and their levels of interoperability with architectural BIM authoring software. Structured interviews were carried out with 7 Irish architects and architectural technologists to determine if a disconnection between architectural design and acoustic performance exists and to identify the advantages and disadvantages of current workflows for acoustic performance …