Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Scheduling

Discipline
Institution
Publication Year
Publication
Publication Type
File Type

Articles 211 - 224 of 224

Full-Text Articles in Engineering

Security-Constrained Optimal Rescheduling Of Real Power Using Hopfield Neural Network, S. Ghosh, Badrul H. Chowdhury Jan 1996

Security-Constrained Optimal Rescheduling Of Real Power Using Hopfield Neural Network, S. Ghosh, Badrul H. Chowdhury

Electrical and Computer Engineering Faculty Research & Creative Works

A new method for security-constrained corrective rescheduling of real power using the Hopfield neural network is presented. The proposed method is based on solution of a set of differential equations obtained from transformation of an energy function. Results from this work are compared with the results from a method based on dual linear programming formulation of the optimal corrective rescheduling. The minimum deviations in real power generations and loads at buses are combined to form the objective function for optimization. Inclusion of inequality constraints on active line flow limits and equality constraint on real power generation load balance assures a …


Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt Sep 1995

Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt

BioResource and Agricultural Engineering

Successful on-farm irrigation scheduling requires that water delivery projects adopt a service concept, and that water deliveries be made with a high degree of reliability. An arranged delivery schedule and seasonal volumetric allocations are additional requirements. Until these conditions are met, attempts to implement modern on-farm irrigation scheduling techniques to maximize water use efficiency, and to maximize yields will be only partially successful.


An Improved Heuristic For Intercontinental Ballistic Missile Crew Scheduling, Michael D. Shirley Jr. Dec 1994

An Improved Heuristic For Intercontinental Ballistic Missile Crew Scheduling, Michael D. Shirley Jr.

Theses and Dissertations

Creating monthly schedules for missile crews is a complex and time-consuming problem. Thousands of events must be scheduled for several hundred missile officers. The rules and regulations governing the problem are numerous, and there are currently no established measures for missile crew schedules. The scheduling software currently available only schedules a fraction of the events. The objectives of this research were to create a rule-based heuristic which could quickly produce feasible or near-feasible schedules, to make the scheduling process paperless, and to develop possible measures of effectiveness for missile crew schedules. The research was successful in each of these areas. …


Automated Manpower Rostering: Techniques And Experience, C. M. Khoong, Hoong Chuin Lau, L. W. Chew Jul 1994

Automated Manpower Rostering: Techniques And Experience, C. M. Khoong, Hoong Chuin Lau, L. W. Chew

Research Collection School Of Computing and Information Systems

We present ROMAN, a comprehensive, generic manpower rostering toolkit that successfully handles a wide spectrum of work policies found in service organizations. We review the use of various techniques and methodologies in the toolkit that contribute to its robustness and efficiency, and relate experience gained in addressing manpower rostering problems in industry.


Automating Satellite Range Scheduling, S. Michael Schalck Dec 1993

Automating Satellite Range Scheduling, S. Michael Schalck

Theses and Dissertations

The objective of this study was to develop a computer based satellite range scheduling SRS algorithm to create a 24 hour satellite support schedule. The algorithms goal was to schedule as many satellite support requests as possible. An iterative heuristic approach was used to schedule satellite support requests in three successive sub problems. The first sub problem involves scheduling low altitude satellite support requests using a mixed integer programming approach. The next two sub problems each involve scheduling 12 hour blocks of medium and high altitude satellite support requests, again using a mixed integer programming approach. Fourteen 24 hour schedules …


Crew Scheduling Of Space Operations Squadrons (Sops), Marianne Idzi Nov 1993

Crew Scheduling Of Space Operations Squadrons (Sops), Marianne Idzi

Theses and Dissertations

The mission of Space Operations Squadrons is continuous support of military satellite systems. The scheduling problem associated with conducting continuous operations is threefold. The first problem is finding cyclical crew shift schedules that meet daily manning requirements, adhere to current regulations, contain a minimum number of workshift changes during consecutive duty days, and maximize the non-duty time allowed between duty shifts. The second problem is to establish a sea of criteria to evaluate alternative shift schedules. Finally, the third problem is to minimize the number of personnel required to meet the scheduling requirements stated in the first problem. This study …


Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon Oct 1993

Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon

Industrial and Manufacturing Engineering

Focusing on a basic printed circuit board (PCB) assembly line configuration characterized by very long set-up times, we examine two scheduling methods that can significantly reduce the set-up. Both methods -the Grouped Set-Up (GSU) method that has been recently introduced in the literature and the Sequence Dependent Scheduling (SDS) method, which has not been studied in this context -are based on component commonality among PCB types. Using the typical traditional scheduling method as a benchmark, the GSU and the SDS methods are compared in terms of three performance measures: line throughput, average work-in-process (WIP) inventory level, and implementation complexity. Guidelines …


A Comparison Of Alphanumeric, Direct Manipulation Graphic, And Equivalent Interface Design For A Production Scheduling Task, Ann C. Fulop Jan 1992

A Comparison Of Alphanumeric, Direct Manipulation Graphic, And Equivalent Interface Design For A Production Scheduling Task, Ann C. Fulop

Psychology Theses & Dissertations

Scheduling is an essential factor influencing the efficiency of any production system. The effectiveness of the scheduling system depends upon the interaction of the human and machine. Thus, to effectively design the interface between the human and the machine, the human factors professional must understand scheduling behavior and the information requirements of the scheduling task. The present study modeled human scheduling behavior and determined the information requirements of the scheduling task. The study also compared alphanumeric, direct manipulation graphic, and equivalent interfaces to determine which interface best supports scheduling. The results of the study show that schedulers monitor the current …


A Knowledge-Based Expert System For Managing Underground Coal Mines In The U.S., H. Singh, S. Yuan, C. M. Watts, J. M. Dean, N. P. Reddy, R. S. Nutter Jr., R. Larry Grayson Jul 1990

A Knowledge-Based Expert System For Managing Underground Coal Mines In The U.S., H. Singh, S. Yuan, C. M. Watts, J. M. Dean, N. P. Reddy, R. S. Nutter Jr., R. Larry Grayson

Mining Engineering Faculty Research & Creative Works

The Mine Management Support System which is being developed as a knowledge-based expert system for better management of underground coal mines, is presented. Concentrating on capturing the complex body of knowledge needed to enhance efficient management of a mine, it will encompass information and preferred rules on work scheduling, work practices, regulations impinging on the accomplishment of work, responses to operating problems, and the labor-management work agreement. Different components of the mine system, modeled using an object-oriented layering technique, are displayed graphically to aid in coordinating work plans and to present locations of equipment, supplies, and proposed subsystem components.


Application Of Distributed Knowledge Bases In Intelligent Manufacturing, Cihan H. Dagli, Gerald E. Hoffman Jan 1989

Application Of Distributed Knowledge Bases In Intelligent Manufacturing, Cihan H. Dagli, Gerald E. Hoffman

Engineering Management and Systems Engineering Faculty Research & Creative Works

The authors consider independent knowledge bases operating on separate work stations networked together within the domain of knowledge-based scheduling. The scheduling problem is addressed through distributed knowledge bases that have an ability to pass information back and forth between small knowledge bases functioning at different decision-making levels. A small manufacturing plant is conceptualized in order to experiment with this process. The general outline and areas of the manufacturing shop are shown. The domain specific area for the knowledge bases is to optimize the scheduling of work at each work station in order to meet a weekly quota. Automatic guided vehicle, …


Possible Applications Of Neural Networks In Manufacturing, S. Lammers, Cihan H. Dagli Jan 1989

Possible Applications Of Neural Networks In Manufacturing, S. Lammers, Cihan H. Dagli

Engineering Management and Systems Engineering Faculty Research & Creative Works

Summary form only given. An examination is made of the potential of neural networks and the impact of parallel processing in the design and operations of manufacturing systems. After an initial discussion on possible areas of application, an approach that integrates artificial intelligence, operations research, and neural networks for the solution of a scheduling problem is examined


Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon Jan 1988

Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon

Industrial and Manufacturing Engineering

The current practice in the assembly of electronic components on printed circuit boards (PCB's) is serial production, a process characterized by very long set-up times.

However. with the advent of efficient on-line process information, new production control methods are now possible. This paper proposes two new production methods - the Grouped Set-up (GSU) method and the Sequence-Dependent Scheduling (SDS) method, which can significantly reduce set-up times.

It is shown that the GSU always performs better than the SDS method in terms of total production flow (throughput). while the SDS performs better than the GSU method in terms of work-in-process (WIP) …


Two-Step Optimal Thermal Generation Scheduling, B Fardanesh, F. Eugenio Villaseca May 1986

Two-Step Optimal Thermal Generation Scheduling, B Fardanesh, F. Eugenio Villaseca

Electrical and Computer Engineering Faculty Publications

A new approach to the solution of the optimal thermal generation scheduling problem is presented. The problem is solved in two steps. As a first step, the optimal production schedule for the next day is obtained based on a daily load forecast, reserve capacity requirements, and present status of generating units. The second-step algorithm uses the results of the first step and adjusts the previous schedule to meet new constraints developed during the course of the day. Variable truncation dynamic programming is proposed as a new method to reduce computation effort. To eliminate the need for solving the …


Estimated Potential Water Needs For The Eastern Grand Prairie Region By Irrigation Scheduling, Richard C. Peralta, Paul W. Dutram, Paul Killian Jan 1983

Estimated Potential Water Needs For The Eastern Grand Prairie Region By Irrigation Scheduling, Richard C. Peralta, Paul W. Dutram, Paul Killian

Civil and Environmental Engineering Faculty Publications

Prepare maps showing the annual, monthly and peak weekly volume of irrigation water required in each 3 mile by 3 mile cell of the study area for the selected cropping pattern. Maps are presented for "average" and "dry" climatological conditions.