Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Engineering

Optimal Scheduling Of Connected And Autonomous Vehicles At A Reservation-Based Intersection., Muting Ma Aug 2022

Optimal Scheduling Of Connected And Autonomous Vehicles At A Reservation-Based Intersection., Muting Ma

Electronic Theses and Dissertations

Reservation-based intersection control has been evaluated with better performance over traditional signal controls in terms of intersection safety, efficiency, and emission. Controlling connected and autonomous vehicles (CAVs) at a reservation-based intersection in terms of improving intersection efficiency is performed via two factors: trajectory (speed profile) and arrival time of CAVs at the intersection. In an early stage of the reservation-based intersection control, an intersection controller at the intersection may fail to find a feasible solution for both the trajectory and arrival time for a CAV at a certain planning horizon. Leveraging a deeper understanding of the control problem, reservation-based intersection …


A Real-Time Crane Service Scheduling Decision Support System (Css-Dss) For Construction Tower Cranes, Amir Tork Jan 2013

A Real-Time Crane Service Scheduling Decision Support System (Css-Dss) For Construction Tower Cranes, Amir Tork

Electronic Theses and Dissertations

The success of construction projects depends on proper use of construction equipment and machinery to a great extent. Thus, appropriate planning and control of the activities that rely on construction equipment could have significant effects on improving the efficiency of project operations. Cranes are the largest and most conspicuous construction equipment, widely used in typical construction sites. They play a major role in relocation of materials in horizontal and vertical directions on construction sites. Given the nature of activities relying on construction cranes in various stages of a project, cranes normally have control over the critical path of the project …


Planning And Scheduling For Large-Scaledistributed Systems, Han Yu Jan 2005

Planning And Scheduling For Large-Scaledistributed Systems, Han Yu

Electronic Theses and Dissertations

Many applications require computing resources well beyond those available on any single system. Simulations of atomic and subatomic systems with application to material science, computations related to study of natural sciences, and computer-aided design are examples of applications that can benefit from the resource-rich environment provided by a large collection of autonomous systems interconnected by high-speed networks. To transform such a collection of systems into a user's virtual machine, we have to develop new algorithms for coordination, planning, scheduling, resource discovery, and other functions that can be automated. Then we can develop societal services based upon these algorithms, which hide …