2nd Annual Girls Build Summer Academy: Logistics And Scheduling, Matteo Cade Cuccaro Dec 2023

2nd Annual Girls Build Summer Academy: Logistics And Scheduling, Matteo Cade Cuccaro

Construction Management

This paper discusses the logistics and scheduling involved for Cal Poly construction management department’s second annual Girls Build Summer Academy. The week-long academy was hosted to introduce construction related activities to 19 high school-aged girls so they could learn more about the careers available within the architecture, engineering, and construction industry, while learning skills to build individual and team projects. To achieve this goal, a full schedule was developed for each day of the camp, allowing for a variety of activities, including listening to guest speakers, completing building projects, and training to safely use tools. There were many challenges that …


Standardizing Hands-On Building Activities In Commercial Construction Management And Recommendations For Semester Conversion Adaptations, Lauren T. Mcclurg Jun 2023

Standardizing Hands-On Building Activities In Commercial Construction Management And Recommendations For Semester Conversion Adaptations, Lauren T. Mcclurg

Construction Management

CM 313 Commercial Construction Management at Cal Poly is an integrated lab course and one of the main hands-on learning experiences construction management students participate in. It is currently administered in the quarter system and as the university transitions to the semester calendar, the lab needs to be converted in order to accommodate this change. The main purpose of this project was to document existing practices and improve the process and experience for students, instructional students assistants, Simpson Strong Tie coordinator, and other professors of CM 313. This project included creating a builders guide to help the student assistants by …


Pull Planning Workshop - Central California Valley, Thomas A. Camargo Dec 2022

Pull Planning Workshop - Central California Valley, Thomas A. Camargo

Construction Management

Lean scheduling and pull planning are both excellent methods of scheduling and sequencing a project. It has made huge impacts on scheduling for general contractors in southern and northern region of California. However, Central California has not been able to see the benefits and impacts of these scheduling tools because of the regions lack of use of lean scheduling and pull planning. Lean scheduling is a technique that encourages communication and collaboration between the project stakeholders. Pull planning offers project stakeholders a chance to rally together and collaborate. These pull planning sessions are useful for sequencing work to meet milestones …


City Of Guadalupe Cultural Arts & Education Center Veterans Memorial Wall, Alejandra Arroyo Perez Dec 2021

City Of Guadalupe Cultural Arts & Education Center Veterans Memorial Wall, Alejandra Arroyo Perez

Construction Management

As a student in Construction Management, the importance of firsthand experience in the construction industry should not be taken lightly. The responsibility of every construction manager is to learn how to take a project from concept to reality. The primary five elements of construction management entail project programming, design development, material specifications, estimating, and scheduling. This paper documents the construction management process related to a Veterans Memorial Wall. Through coordination with the project stakeholders (i.e. property owners, engineer consultants, material fabricators, and vendors) a fully immersive construction management experience is gained. One of the stakeholder requirements was to establish a …


Cal Poly Rodeo Observation Deck, Timothy Smith Jun 2020

Cal Poly Rodeo Observation Deck, Timothy Smith

Construction Management

This senior project was designed to help continue the winning tradition that the Cal Poly Rodeo program established in 1939 with a new observation deck for the practice arena. The major steps taken to complete this project were design, fundraising and construction. The total area of the deck is approximately 1,100 square feet and includes connections to an ADA approved ramp and multiple staircases. This is a landmark project for the Cal Poly Rodeo program and will assist them in keeping the winning Mustang tradition alive.


Introducing Sequencing Within The Advanced Scheduling Curriculum, Adam Cole Alvarez Jun 2020

Introducing Sequencing Within The Advanced Scheduling Curriculum, Adam Cole Alvarez

Construction Management

Scheduling is one of the most important factors within the construction industry. The current Advanced Scheduling curriculum addresses how to use the program P6, but not the understanding of how to sequence. This project introduced two new lab activities that focus on the understanding of sequencing while using P6. I chose this project because I have always had an interest in scheduling as it is one of the most important driving factors in construction and after taking Advanced Scheduling in my Junior year I noticed there is a need for understanding sequencing. I wanted to introduce a new curriculum because …


Creating A Pull Planning Guide For Industry Use, Michael B. Avila Jun 2019

Creating A Pull Planning Guide For Industry Use, Michael B. Avila

Construction Management

The construction industry is quickly making Pull Planning sessions a commodity only the largest companies can afford due to expensive consultants and the common perception of a complicated process. Pull Planning does not need to be complicated but can be quickly implemented by all types of companies utilizing extensive research completed on The Last Planner System. The benefits of Pull Planning include creating buy-in to the plan, making hand-offs known, and creating reliability and trust from the key Players on a project. As the demand for a more productive construction project rises, it is increasingly important for the scheduling methods …


Implementation Of Industry Technology Into The Construction Management Department, Kristen D. Forster Jun 2018

Implementation Of Industry Technology Into The Construction Management Department, Kristen D. Forster

Construction Management

With technology being one of the fastest growing items in the construction industry it is important to keep on top of what is utilized most commonly. To fully prepare graduates for the work force, the Construction Management Department at Cal Poly, San Luis Obispo needs to focus efforts on supplying students with the most commonly used industry technologies. Utilizing these programs in the current curriculum will ensure that graduates from the Construction Management Department are prepared to take on the work force with the most relevant software under their belts. Students who understand how to use these industry sanctioned technologies …


San Pedro Roman Catholic Primary School Photovoltaic Project (Belize), John Angelo M. Pezzini Jun 2018

San Pedro Roman Catholic Primary School Photovoltaic Project (Belize), John Angelo M. Pezzini

Construction Management

In December 2016, the California Polytechnic State University National Electrical Contractors Association (NECA) Student Chapter, along with Construction Management faculty and alumni/industry members, installed a photovoltaic system in San Pedro, Belize. This student-led team won the Student Passport Initiative grant from ELECTRI International, with the purpose of designing and constructing a photovoltaic system for the San Pedro Roman Catholic Primary School, in order to reduce dependence on the grid, encourage carbon neutrality, and aim for net-zero energy consumption. This paper will discuss the preconstruction tasks associated with the project, focusing mainly on maintaining the schedule, the installation of the system …


Poly Canyon Observation Deck, Jordan H. Morofsky May 2018

Poly Canyon Observation Deck, Jordan H. Morofsky

Construction Management

The Poly Canyon Observation Deck is a project that I have been moving through preconstruction for the past year. It started as a solo project but quickly evolved into an interdisciplinary project involving two architectural engineers and myself. Together we developed a project proposal that we presented to Cal Poly Facilities along with our building permit application. They have approved our proposal and have awarded us a provisional building permit which will be approved after they review the 100% construction documents. We have been working the past two quarters to finalize the design, select materials, and perform a complete structural …


Implementation Of Industry Technology Into The Construction Management Department, Kristen D. Forster May 2018

Implementation Of Industry Technology Into The Construction Management Department, Kristen D. Forster

Construction Management

With technology being one of the fastest growing items in the construction industry it is important to keep on top of what is utilized most commonly. To fully prepare graduates for the work force, the Construction Management Department at Cal Poly, San Luis Obispo needs to focus efforts on supplying students with the most commonly used industry technologies. Utilizing these programs in the current curriculum will ensure that graduates from the Construction Management Department are prepared to take on the work force with the most relevant software under their belts. Students who understand how to use these industry sanctioned technologies …


Lean Construction Teaching Module: Push/Pull Planning, James M. Iroz Dec 2017

Lean Construction Teaching Module: Push/Pull Planning, James M. Iroz

Construction Management

The Construction Management Department at California Polytechnic University at San Luis Obispo has taken interests into the topics of Lean Construction to be a part of its curriculum. Lean Construction is a methodology in the built environment that tries to establish a leaner and more efficient work place in the industry. Within this broad spectrum of methodology, scheduling and more specifically, “push pull scheduling” is one of its many trademark applications. As the demand for more efficient projects rise, it is increasingly important for the next generation of construction students to be aware and educated with efficient skills. This experimental …


A Set Union Based Formulation For Course Scheduling And Timetabling, Jesse Paul Bukenberger Jun 2014

A Set Union Based Formulation For Course Scheduling And Timetabling, Jesse Paul Bukenberger

Master's Theses

The Course Timetabling Problem is a widely studied optimization problem where a number of sections are scheduled in concert with the assignment of students to sections in order to maximize the desirability of the resulting schedule for all stakeholders. This problem is commonly solved as a linear program with variables for each student or group of students with identical schedules. In this paper we explore an alternative formulation that aggregates binary student variables into integer variables denoting the number of students enrolled in a course. Our solution method assumes decomposition of the general schedule into time blocks, and applies a …


Practical Irrigation Scheduling Program, Dominic Sween Jun 2013

Practical Irrigation Scheduling Program, Dominic Sween

BioResource and Agricultural Engineering

This senior project discusses the design, construction, and evaluation of an irrigation scheduling program that aids users in alfalfa irrigation management, with the potential for application with other crops. The program uses a very accurate irrigation prediction model that forecasts what the estimated irrigation need of each week will be, as well as the number of irrigations needed to satisfy the requirement. The model was found to predict the sum of the actual required weekly irrigation amount within less than 1% of the true value. The program was based off the single crop coefficient approach that was outlined previously by …


Gis-Based Irrigation District Flow Routing/Scheduling, Charles M. Burt, Beau Freeman Jan 2011

Gis-Based Irrigation District Flow Routing/Scheduling, Charles M. Burt, Beau Freeman

BioResource and Agricultural Engineering

In 2007, the Irrigation Training and Research Center (ITRC) at California Polytechnic State University, San Luis Obispo undertook to develop a prototype of an intelligent and scalable real-time GIS-based water scheduling and routing software system for irrigation districts, capable of integrating multiple data sources into an information access and management facility featuring collaborative tools with automatic reasoning and analytical capabilities. Improving the infrastructure and management capabilities of irrigation districts in order to provide flexible delivery schedules and increase participation in peak demand reduction programs has been identified as having a significant potential to achieve energy conservation and resource efficiencies.

The …


In-House Development Of Scheduling Decision Support Systems: Case Study For Scheduling Semiconductor Device Test Operations, Tali Freed, K. H. Doerr, T. Chang Nov 2007

In-House Development Of Scheduling Decision Support Systems: Case Study For Scheduling Semiconductor Device Test Operations, Tali Freed, K. H. Doerr, T. Chang

Industrial and Manufacturing Engineering

Most manufacturing processes can benefit from an automated scheduling system. However;: the design of a fast, computerised scheduling system that achieves high-quality results and requires minimal resources is a difficult undertaking. Efficient .. scheduling of a semiconductor device test facility requires an information system that provides good schedules quickly. Semiconductor device testing-is the last stage of the long semiconductor manufacturing process, and therefore. is subjected to customer service pressures. The cost of an off-the-shelf computerised scheduling system may he prohibitive for many companies. In addition, many companies are taken aback by other characteristics of off-the-shelf scheduling systems, such as code …


Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt Sep 1995

Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt

BioResource and Agricultural Engineering

Successful on-farm irrigation scheduling requires that water delivery projects adopt a service concept, and that water deliveries be made with a high degree of reliability. An arranged delivery schedule and seasonal volumetric allocations are additional requirements. Until these conditions are met, attempts to implement modern on-farm irrigation scheduling techniques to maximize water use efficiency, and to maximize yields will be only partially successful.


Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon Oct 1993

Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon

Industrial and Manufacturing Engineering

Focusing on a basic printed circuit board (PCB) assembly line configuration characterized by very long set-up times, we examine two scheduling methods that can significantly reduce the set-up. Both methods -the Grouped Set-Up (GSU) method that has been recently introduced in the literature and the Sequence Dependent Scheduling (SDS) method, which has not been studied in this context -are based on component commonality among PCB types. Using the typical traditional scheduling method as a benchmark, the GSU and the SDS methods are compared in terms of three performance measures: line throughput, average work-in-process (WIP) inventory level, and implementation complexity. Guidelines …


Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon Jan 1988

Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon

Industrial and Manufacturing Engineering

The current practice in the assembly of electronic components on printed circuit boards (PCB's) is serial production, a process characterized by very long set-up times.

However. with the advent of efficient on-line process information, new production control methods are now possible. This paper proposes two new production methods - the Grouped Set-up (GSU) method and the Sequence-Dependent Scheduling (SDS) method, which can significantly reduce set-up times.

It is shown that the GSU always performs better than the SDS method in terms of total production flow (throughput). while the SDS performs better than the GSU method in terms of work-in-process (WIP) …