Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022),
2023
Environmental Protection Agency
Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022),
2023
Environmental Protection Agency
Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr),
2023
Montana Tech Library
Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022),
2023
Environmental Protection Agency
Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Waterbody Size Predicts Bank- And Boat-Angler Efforts,
2023
University of Nebraska - Lincoln
Waterbody Size Predicts Bank- And Boat-Angler Efforts, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk
Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications
Bank- and boat-angler efforts are logistically difficult and costly to estimate, preventing landscape-scale estimates that are required to address current and future challenges (e.g., climate change, invasive species) for inland recreational fisheries. Using a large Nebraska, USA, recreational fishery dataset (N = 67 waterbodies), we demonstrate that waterbody size can be used to predict bank- and boat-angler efforts across a heterogeneous landscape of extra small (< 104 ha) and large (> 647 ha) waterbodies. Bank and boat anglers respond to waterbody size, however these relationships appear to be unique between the two angler types. Boat-angler efforts increased as a function of waterbody size, whereas bank-angler …
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023),
2023
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Field Sampling Plan (Fsp) Submittal #10 [Covering Original Mine Yard] (Dated July 14, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Field Sampling Plan (Fsp) Submittal #10 [Covering Original Mine Yard] (Dated July 14, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023),
2023
Environmental Protection Agency
Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
The Relationship Between Water Temperature And Proximity To Surface Urban Heat Islands Within The Lower Chesapeake Bay Watershed For The Summer Of 2019,
2023
University of Mary Washington
The Relationship Between Water Temperature And Proximity To Surface Urban Heat Islands Within The Lower Chesapeake Bay Watershed For The Summer Of 2019, Sarah Kerner
Departmental Honors & Graduate Capstone Projects
Surface urban heat islands (SUHIs) are land surfaces with high concentrations of impervious surfaces like roofs, roads, sidewalks and other infrastructures that trap, absorb, and re-emit heat throughout the day/night and typically present higher temperatures than their surrounding rural areas. In this study, I evaluate how presence of and distance to SUHIs are associated with water temperature in the lower Chesapeake Bay watershed for the summer of 2019. When heavy precipitation events occur, flooding creates stormwater runoff, which is exposed to the hotter temperatures in urban areas. This introduces thermal pollution to nearby rivers and streams disrupting aquatic ecosystems. The …
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels),
2023
Montana Tech Library
Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #10 [Original Mine Yard],
2023
Montana Tech Library
Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #10 [Original Mine Yard], Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 (Covering Goldhill Lutheran Church [Creativity Factory Preschool] And United Congregational [Crayon Academy Preschool]) (Dated June 30, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 (Covering Goldhill Lutheran Church [Creativity Factory Preschool] And United Congregational [Crayon Academy Preschool]) (Dated June 30, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit, Superfund Stormwater Operation And Maintenance (O&M); Mountain Con Sw Channel Diversion, Request For Change (Rfc)-Bsb Sitewide-2023-001 (Dated June 29, 2023),
2023
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit, Superfund Stormwater Operation And Maintenance (O&M); Mountain Con Sw Channel Diversion, Request For Change (Rfc)-Bsb Sitewide-2023-001 (Dated June 29, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites,
2023
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites, Mike Mcanulty, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Gouldian Finch Monitoring: Foraging Activity And Grass Phenology - Goomig Project 2022 To 2023,
2023
Biota Environmental Sciences
Gouldian Finch Monitoring: Foraging Activity And Grass Phenology - Goomig Project 2022 To 2023, J Graff
Irrigated Agricultural Development in the North
The Goomig Project (Weaber Plains Development Project) is an irrigated agricultural development located approximately 30 km north of Kununurra, which involves clearing of approximately 9,260 ha of vegetation for agriculture. Approximately 11,470 ha of native vegetation surrounding, or remaining between, the cleared areas is designated as a buffer area (the study area) to be managed to protect surrounding conservation reserves and watercourses (Strategen 2014). Monitoring of Gouldian Finch wet season foraging activity and phenology and productivity of grasses important for foraging in the buffer area during ongoing operation are required as conditions of the approval for the project, and is …
Droughtscape, Summer 2023,
2023
University of Nebraska-Lincoln
Droughtscape, Summer 2023, National Drought Mitigation Center
DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023)
DroughtScape, Summer 2023
Monitoring Dam Stability Using Psi And Sbas Analysis,
2023
Chapman University
Monitoring Dam Stability Using Psi And Sbas Analysis, Rejoice Thomas, Wenzhao Li, Shahryar Fazli, Nikolay Grisel Todorov, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Water preservation and maximization of its efficient use is key in areas facing water scarcity like California. One of the most important resources available to us are dams, which are useful to address a variety of needs like water supply, flood control, and maintaining environmental flows. However, if not managed properly, dams can be disastrous to humans and wildlife alike, different water species, habitats, and even impact water quality for a region. In this context, we have used newer Synthetic Aperture Radar Interferometry techniques like Persistent Scatterer Interferometry (PSI) and Small Baseline Subset (SBAS) to estimate the displacement rates at …
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023,
2023
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Climate Of A Cave Laboratory Representative For Rock Art Caves In The Vézère Area (South-West France),
2023
University of Bordeaux, CNRS, France
Climate Of A Cave Laboratory Representative For Rock Art Caves In The Vézère Area (South-West France), Delphine Lacanette, Léna Bassel, Fabien Salmon, Jean-Christophe Portais, Bruno Bousquet, Rémy Chapoulie, Faten Ammari, Philippe Malaurent, Catherine Ferrier
International Journal of Speleology
Leye Cave (Dordogne, France) is a laboratory cave in the Vézère area, a region that contains some of the most famous rock art caves in the world such as Lascaux, Font-de-Gaume and Combarelles, and is listed as Human World Heritage by UNESCO. Leye Cave was selected because it is representative of painted caves, with respect to parameters such as its geological stage, the presence of water and carbon dioxide, the geological state of its walls, and the size of the cave. These wall states are studied to better understand the conditions of conservation of rock art caves without damaging them. …
Approval Page - Butte Priority Soils Operable Unit Residential Metals Abatement Program - Field Sampling Plan - Goldhill Lutheran Church And United Congregational - Indoor Dust,
2023
Environmental Protection Agency
Approval Page - Butte Priority Soils Operable Unit Residential Metals Abatement Program - Field Sampling Plan - Goldhill Lutheran Church And United Congregational - Indoor Dust, Nikia Greene, Daryl Reed, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.