Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

7,500 Full-Text Articles 10,534 Authors 2,370,025 Downloads 200 Institutions

All Articles in Environmental Monitoring

Faceted Search

7,500 full-text articles. Page 90 of 307.

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Applications Of Observational Seismology: Insights Into Volcanic And Near Surface Processes, Justin T. Wilgus 2023 University of New Mexico

Applications Of Observational Seismology: Insights Into Volcanic And Near Surface Processes, Justin T. Wilgus

Earth and Planetary Sciences ETDs

The field of observational seismology has made tremendous progress in the past two decades. This progress has been multi-faceted in form, but significant contributions emanated from 1) increases in both the quality and the quantity of seismic data 2) advances in computational power 3) advances in algorithmic capability, including machine learning. In this dissertation I report on three distinctly different seismic applications made possible by the aforementioned progress and discuss the insights these applications have provided in understanding volcanic and near surface processes of the Earth.

In the first chapter titled, “Shear Velocity Evidence of Upper Crustal Magma Storage Beneath …


Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson 2023 Management Service Company, ARCO

Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc. 2023 Montana Tech Library

Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene 2023 Environmental Protection Agency

Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh 2023 China Earthquake Administration

Detection And Identification Of Pre-Seismic Thermal Anomalies In Cloudy Conditions Associated With The 2022 Luding (China) Mw 6.6 Earthquake, Feng Jing, Meng Jiang, Lu Zhang, Ramesh P. Singh

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Over the past three decades, thermal anomalies from satellite infrared data have been widely discussed and associated with earthquakes. Besides infrared satellite data, the recent use of passive microwave satellite data has emerged as an important dataset to detect the potential thermal anomalies prior to earthquakes in all weather conditions due to its capability to monitor the earth in cloudy and foggy conditions and has been applied to the numerous strong earthquake events around the world. On 5 September 2022, an Mw 6.6 earthquake occurred in Luding county, nearby Mt. Gongga, China, with heavy cloud coverage over the epicenter and …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene 2023 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress