Understanding Cybersecurity Perception In The Maritime Sector Of Nigeria : A Comparative Analysis,
2024
World Maritime University
Understanding Cybersecurity Perception In The Maritime Sector Of Nigeria : A Comparative Analysis, Lawal Mohammed Abdulrasaq
World Maritime University Dissertations
No abstract provided.
A Prominent Future Fuel : Methanol & Risk Assessment Of Methanol Fuel System Of Tanker As A Case Study,
2024
World Maritime University
A Prominent Future Fuel : Methanol & Risk Assessment Of Methanol Fuel System Of Tanker As A Case Study, Jaeho Jin
World Maritime University Dissertations
No abstract provided.
A Study To Examine Vessel Traffic Services In The Context Of Maritime Autonomous Surface Ships : Strait Of Malacca As A Case Study,
2024
World Maritime University
A Study To Examine Vessel Traffic Services In The Context Of Maritime Autonomous Surface Ships : Strait Of Malacca As A Case Study, Nadarajan Perumal
World Maritime University Dissertations
No abstract provided.
Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report,
2024
Montana Tech Library
Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Materials Management Plan Silver Bow Creek Conservation Area,
2024
Montana Tech Library
Draft Final Materials Management Plan Silver Bow Creek Conservation Area, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report,
2024
Montana Tech Library
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022,
2024
Montana Tech Library
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
September 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2024
Montana Resources
September 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Roaded Catchments In Wa,
2024
Department of Primary Industries and Regional Development, Western Australia
Roaded Catchments In Wa, Department Of Primary Industries And Regional Development, Western Australia
Natural resources factsheets
Roaded catchments are earthwork structures designed to increase the amount of run-off from the catchment above a receiving farm dam.
Roaded catchments are lined with clay and compacted to make a smooth surface that reduces infiltration and increases run-off. Roaded catchments should discharge into a silt trap and then into a dam (excavated earth tank). This combined structure should be fenced to exclude livestock.
The Department of Primary Industries and Regional Development recommends that roaded catchments are part of an integrated water and salinity management program.
The information in this page is only a guide – seek expert advice before …
Managing Subsurface Water In Wa,
2024
Department of Primary Industries and Regional Development, Western Australia
Managing Subsurface Water In Wa, Department Of Primary Industries And Regional Development, Western Australia
Natural resources factsheets
The Department of Primary Industries and Regional Development (DPIRD) recommends that subsurface water management is part of an integrated water and salinity program. An integrated program can help to lower water tables and alleviate problems with waterlogging, rising salinity, and infrastructure damage.
Greenhouse Gas Accounting For Western Australian Agriculture 2022,
2024
Department of Primary Industries and Regional Development, Western Australia
Greenhouse Gas Accounting For Western Australian Agriculture 2022, Johnny Machon, Mandy Curnow, Christophe D'Abbadie
Climate Science Published Reports
This report presents new modelling of the greenhouse gas emissions attributable to Western Australia’s agricultural industries and provides an overview of sequestration at the state level. The report improves and expands on the estimates from previous technical reports by the Department of Primary Industries and Regional Development (DPIRD), most notably Curnow et al. (2022). The report presents a new, much broader picture, capturing not only emissions from agricultural activities in Western Australia (WA), but also the emissions associated with the production of agricultural inputs and the sequestration that occurs on agriculturally managed lands. This broader picture of emissions aligns with …
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System,
2024
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System,
2024
Management Service Company, ARCO
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024),
2024
Environmental Protection Agency
Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Carbon Restoration Potential On Global Land Under Water Resource Constraints,
2024
Northwest A&F University
Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …
Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024.,
2024
Environmental Protection Agency
Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024.,
2024
Environmental Protection Agency
Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024),
2024
Environmental Protection Agency
Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
