Final Executed Request For Change (Rfc-Rmap-2024-002),
2024
Atlantic Richfield Company
Final Executed Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report,
2024
Montana Tech Library
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Materials Management Plan Silver Bow Creek Conservation Area,
2024
Montana Tech Library
Draft Final Materials Management Plan Silver Bow Creek Conservation Area, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System,
2024
Management Service Company, ARCO
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System,
2024
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024),
2024
Environmental Protection Agency
Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Carbon Restoration Potential On Global Land Under Water Resource Constraints,
2024
Northwest A&F University
Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report,
2024
Montana Resources
Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024.,
2024
Environmental Protection Agency
Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024.,
2024
Environmental Protection Agency
Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024),
2024
Environmental Protection Agency
Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024),
2024
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Scaling Individual Tree Transpiration With Thermal Cameras Reveals Interspecies Differences To Drought Vulnerability,
2024
Northern Arizona University
Scaling Individual Tree Transpiration With Thermal Cameras Reveals Interspecies Differences To Drought Vulnerability, Mostafa Javadian, Donald M. Aubrecht, Joshua B. Fisher, Russell L. Scott, Sean P. Burns, Jen L. Diehl, J. William Munger, Andrew D. Richardson
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Understanding tree transpiration variability is vital for assessing ecosystem water-use efficiency and forest health amid climate change, yet most landscape-level measurements do not differentiate individual trees. Using canopy temperature data from thermal cameras, we estimated the transpiration rates of individual trees at Harvard Forest and Niwot Ridge. PT-JPL model was used to derive latent heat flux from thermal images at the canopy-level, showing strong agreement with tower measurements (R2 = 0.70–0.96 at Niwot, 0.59–0.78 at Harvard at half-hourly to monthly scales) and daily RMSE of 33.5 W/m2 (Niwot) and 52.8 W/m2 (Harvard). Tree-level analysis revealed species-specific responses to …
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study,
2024
Montana Tech Library
2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024.,
2024
Environmental Protection Agency
Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024,
2024
Environmental Protection Agency
Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Oregon State Rank Assessment For Sheldon Tui Chub (Siphateles Bicolor Eurysoma),
2024
Portland State University
Oregon State Rank Assessment For Sheldon Tui Chub (Siphateles Bicolor Eurysoma), Eleanor P. Gaines
Institute for Natural Resources Publications
Oregon state conservation status assessment for Sheldon tui chub (Siphateles bicolor eurysoma) using NatureServe methodology, 2024.