Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

7,480 Full-Text Articles 10,531 Authors 2,305,939 Downloads 200 Institutions

All Articles in Environmental Monitoring

Faceted Search

7,480 full-text articles. Page 28 of 306.

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson 2025 Management Service Company, ARCO

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham el-Askary 2025 Chapman University

Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

As climate change intensifies, extreme weather increasingly threatens California’s Central Valley (CV), a vital agricultural region exposed to rising risks from heatwaves (HW), droughts (DR), and compound extremes. These events disrupt crop productivity and broader processes like water demand, pest dynamics, and soil stability, posing systemic risks. This study examines the spatiotemporal dynamics of HW, coldwaves (CW), DR, excessive rainfall (ER), and their compound (e.g., HWDR) and cascading forms from 1951 to 2025, using NOAA nClimGrid-Daily data. We assessed trends in frequency, intensity, and duration over long-term (1951–2025) and mid-term (1981–2025) periods. Results show increasing HW and DR in the …


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran 2025 Montana Tech Library

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Microclimatic Conditions In Shulgan-Tash Cave (Southern Ural, Russia): Implications For The Preservation Of Eastern Europe’S Largest Paleolithic Art Collection, Olga Chervyatsova, Rayan Akhmedyanovb, Nailya Saifullina, Ludmila Kuzmina, Mihael Kotov, Yuri Dublyansky 2025 “Shulgan-Tash” State Natural Biosphere Reserve, Russia

Microclimatic Conditions In Shulgan-Tash Cave (Southern Ural, Russia): Implications For The Preservation Of Eastern Europe’S Largest Paleolithic Art Collection, Olga Chervyatsova, Rayan Akhmedyanovb, Nailya Saifullina, Ludmila Kuzmina, Mihael Kotov, Yuri Dublyansky

International Journal of Speleology

This study presents the results of a long-term investigation of the microclimatic conditions in Shulgan-Tash Cave (Southern Urals, Russia), which hosts the largest assemblage of Upper Paleolithic paintings (ca. 16.3–19.6 ka) in Eastern Europe. The cave exhibits two distinct seasonal ventilation regimes – winter and summer – differentially influence its two levels of galleries. In the Lower Level, which contains 83% of the images, near-atmospheric CO2 concentrations persist year-round, and temperature variations associated with seasonal infiltration events are minimal (1.0–1.3°C). By contrast, the Upper Level, including the decorated Hall of Paintings, is affected by downdrafts of CO2-rich …


Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson 2025 Management Service Company, ARCO

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final 2025 Residential Metals Abatement Program (Rmap) Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike McAnulty 2025 Atlantic Richfield Company

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Tillage Legacy, Grasses And Soil Texture Shape Soil Organic Carbon Recovery In Semi-Arid Woodland, Samantha Colunga, Alejandro Fierro-Cabo, Bradley O. Christoffersen, Engil Pereira 2025 The University of Texas Rio Grande Valley

Tillage Legacy, Grasses And Soil Texture Shape Soil Organic Carbon Recovery In Semi-Arid Woodland, Samantha Colunga, Alejandro Fierro-Cabo, Bradley O. Christoffersen, Engil Pereira

School of Earth, Environmental, & Marine Sciences Faculty Publications

Soil degradation from intensive tillage poses a critical barrier to carbon sequestration, particularly in semi-arid regions where low rainfall limits ecosystem recovery. As climate change expands arid zones globally, understanding the long-term potential for soil organic carbon (SOC) recovery in degraded lands becomes increasingly urgent. Here, we analyze reforested chronosequences (4–36 years post-abandonment) in formerly cultivated subtropical thornscrub woodlands to assess SOC dynamics across gradients of soil texture and degradation. We introduce a novel degradation index (DI), integrating SOC deficit and grass dominance, to evaluate how invasive grasses, commonly overlooked in restoration metrics, impede nitrogen (N2)-fixing tree establishment and, consequently, …


Digital Commons powered by bepress