7,606 full-text articles. Page 20 of 312.

Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department of Reclamation and Environmental Services 2026 Montana Tech Library

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran 2026 Montana Tech Library

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2026 Montana Tech Library

Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Draft Final Leak Detection Monitoring Plan, Stantec Consulting Services, Inc. 2026 Montana Tech Library

Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Draft Final Leak Detection Monitoring Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed ElGharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham el-Askary 2026 Chapman University

Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Monitoring large-scale afforestation projects in arid and semi-arid environments requires accurate, high-resolution, and repeatable methods to assess tree survival and growth. In this study, we integrated unmanned aerial vehicle (UAV) multispectral imaging with an advanced object detection framework to evaluate vegetation establishment in the Shuayb Al-Budai afforestation site, part of the Imam Turki bin Abdullah Royal Natural Reserve, Kingdom of Saudi Arabia (KSA). Multispectral datasets were acquired using a MicaSense Altum-PT sensor and processed through a masked Region-based Convolutional Neural Network (RCNN) with two backbone architectures: ResNet-101 and VGG19-BN. The Mask R-CNN–ResNet-101 model achieved superior performance, with an overall accuracy …


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Warming Climate Amplifies Vapor Pressure Deficit Limits On Gross Primary Productivity, Shiqin Xu, Nate G. McDowell, Tim R. McVicar, Diego G. Miralles, Stephen Sitch, Pablo Sanchez-Martinez, Joshua B. Fisher, Pierre Friedlingstein, Hylke E. Beck, Matthew F. McCabe 2026 King Abdullah University of Science and Technology

Warming Climate Amplifies Vapor Pressure Deficit Limits On Gross Primary Productivity, Shiqin Xu, Nate G. Mcdowell, Tim R. Mcvicar, Diego G. Miralles, Stephen Sitch, Pablo Sanchez-Martinez, Joshua B. Fisher, Pierre Friedlingstein, Hylke E. Beck, Matthew F. Mccabe

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ongoing climate warming may profoundly impact terrestrial gross primary productivity (GPP), a key component of the global carbon cycle. However, uncertainty in the relative roles of atmospheric water demand (vapor pressure deficit, VPD) and root-zone soil moisture (SM) limits predictions of drought impacts on GPP. Here, we show that growing-season GPP was more strongly constrained by VPD than SM globally, based on observation-constrained model estimates, satellite retrievals and Dynamic Global Vegetation Model simulations. The importance of VPD increased with higher temperatures and more severe and prolonged droughts. This pattern reflects VPD’s critical role in regulating stomatal conductance and plant hydraulic …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2026 Montana Tech Library

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike McAnulty 2026 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby 2026 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, HydroGeoLogic, Inc. 2026 Montana Tech Library

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott 2026 Environmental Protection Agency

Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress