Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1,
2021
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap,
2021
Clemson University
Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap, Jacob W. Murray
All Theses
Longleaf pine restoration has been a topic of great concern and intrigue in the southeast and has taken on new fervor in recent decades as restoration methods continue to develop. Many landowners and forest managers are now pursuing ecological forestry and restoration ecology in great numbers as a new form of land management. However, niche regions can often be overlooked, as is the case with the Carolina Sandhills Wiregrass Gap, an area devoid of wiregrass and one that is on the outskirt regions of the historical longleaf pine range. Field studies were conducted pre- and post-harvest during two growing seasons …
Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne.,
2021
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Silver Bow Snow Management Plan,
2021
Atlantic Richfield Company
Butte Silver Bow Snow Management Plan, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01,
2021
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site,
2021
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site,
2021
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2021
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021),
2021
Montana Tech Library
Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Region 8 Qa Document Review Crosswalk,
2021
Environmental Protection Agency
Epa Region 8 Qa Document Review Crosswalk, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site,
2021
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study,
2021
Management Service Company, ARCO
Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Spatial Distribution Of Pm2.5-Related Premature Mortality In China,
2021
Zhejiang University
Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …
Spatial Distribution Of Pm2.5-Related Premature Mortality In China,
2021
Zhejiang University
Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …
Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021),
2021
Atlantic Richfield Company
Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work,
2021
Management Service Company, ARCO
Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Making Agriculture Carbon Neutral Amid A Changing Climate: The Case Of South-Western Australia,
2021
Department of Primary Industries and Regional Development, Western Australia
Making Agriculture Carbon Neutral Amid A Changing Climate: The Case Of South-Western Australia, Ross Kingwell
Climate Science Research Articles
Making Australian agriculture carbon neutral by 2050 is a goal espoused by several agricultural organisations in Australia. How costly might it be to attain that goal, especially when adverse climate change projections apply to agriculture in southern Australia? This study uses scenario analysis to examine agricultural emissions and their abatement via reforestation in south-western Australia under projected climate change. Most scenarios include the likelihood of agricultural emissions being reduced in the coming decades. However, the impact of projected adverse climate change on tree growth and tree survival means that the cost of achieving agricultural carbon neutrality via reforestation is forecast …
2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan,
2021
Montana Tech Library
2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek/Butte Area Npl Site,
2021
Montana Tech Library
Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2021
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.