Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022),
2022
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump.,
2022
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump,
2022
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan,
2022
Montana Tech Library
Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump,
2022
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump,
2022
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan,
2022
Environmental Protection Agency
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022),
2022
Environmental Protection Agency
Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2022
Montana Tech Library
2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan,
2022
Environmental Protection Agency
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document,
2022
WellBeing International
Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International
Nexus – UNEP – Animal Welfare, Environment, Sustainable Development
This Resource Document has been developed to explore the Nexus (links) between Animal Welfare, the Environment, and Sustainable Development. The document includes relevant citations and reports addressing the topics encompassed by the Nexus. It will be maintained as a “living document” (subject to revision) in the WellBeing International Studies Repository. The original document and subsequent revisions will be kept in the Repository to provide a record of the changes.
Bmfou Pilot Project Rfc - Request For Change,
2022
Montana Tech Library
Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Drought‑Stricken U.S. States Have More Comprehensive
Water‑Related Hazard Planning,
2022
Technical University of Munich
Drought‑Stricken U.S. States Have More Comprehensive Water‑Related Hazard Planning, Theresa Jedd, Kelly Smith
National Drought Mitigation Center: Faculty Publications
Despite the devastating impacts of droughts, the United States lacks a national drought plan. This leaves states to address droughts in water, hazard, and stand-alone plans which are designed to reduce drought vulnerability and to prepare government, industry, and society to cope with the impacts. Yet, there is limited empirical research that evaluates the comprehensiveness of these plans, specifically in terms of whether they include preparedness and mitigation measures or triggers for action and response. To fill this gap, this study’s first aim was to establish an evaluation framework based on principles from the drought mitigation literature. The study then …
Natural Resource System Size Can Be Used For Managing Recreational Use,
2022
University of Nebraska-Lincoln
Natural Resource System Size Can Be Used For Managing Recreational Use, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk
Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications
Outdoor recreation provides societal benefits that are often measured by the amount of use natural resource systems receive. Still, the amount of resource use natural resource systems receive is often unknown or unstudied. Monitoring and quantifying resource use is often logistically difficult and costly but is paramount to optimize societal benefits. Identifying a simple and readily available metric that can indicate the quantity of recreational use of natural resource systems would benefit natural resource management. Using recreational angler participation data during an 11-year study period from 73 public waterbodies in Nebraska, USA, we developed a resource size-use model that demonstrates …
