Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan,
2024
Management Service Company, ARCO
Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data,
2024
Chapman University
Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data, Gabriela Shirkey, Annick Anctil, Ranjeet John, Venkatesh Kolluru, Leah Mungai, Herve Kashongwe, Lauren T. Cooper, Ilke Celik, Joshua B. Fisher, Jiquan Chen
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
As we increasingly understand the impact that land management intensification has on local and global climate, the call for nature-based solutions (NbS) in agroecosystems has expanded. Moreover, the pressing need to determine when and where NbS should be used raises challenges to socioecological data integration as we overcome spatiotemporal resolutions. Natural and working lands is an effort promoting NbS, particularly emissions reduction and carbon stock maintenance in forests. To overcome the spatiotemporal limitation, we integrated life cycle assessments (LCA), an ecological carbon stock model, and a land cover land use change model to synthesize rates of global warming potential (GWP) …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
And Climate Justice For All,
2024
DePaul University
And Climate Justice For All
DePaul Magazine
DePaul is taking its environmental sustainability and equity prowess to the next level through its Just DePaul and President's Sustainability Committee initiatives that incorporate a climate action plan and student voices. Plus, community partnership courses that involve students in environmental action and justice efforts.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2024
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Repeat Photography Monitoring Made Easy,
2024
Utah State University
Repeat Photography Monitoring Made Easy, G. Allen Rasmussen, Kathy Voth, Eric Thacker, Randall Violett, Ruger Carter, Dallen Smith
All Current Publications
Professional land managers use monitoring as the basis for evaluating and making management decisions. There are many monitoring techniques. Here, we will discuss one of the simplest, cheapest, and quickest methods: repeat photography. By following the easy steps outlined here, range users will collect data and record interpretations over time to provide proof of change and management efforts.
Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2024
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2024
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan,
2024
Montana Tech Library
Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Role Of Greenfield Investment, Institutional Quality, And Economic Activities On Environmental Performance In Belt & Road Initiative Countries,
2024
Assistant Professor and Head of Department, Karakoram International University, Gilgit
Role Of Greenfield Investment, Institutional Quality, And Economic Activities On Environmental Performance In Belt & Road Initiative Countries, Jamal Hussain, Sajid Hassan
CBER Conference
Researchers have produced varying conclusions on the matter of coexistence of economic activities with the protection or improvement of environmental performance. This study investigates the association between greenfield investments, economic activity, institutional quality, and environmental performance in Belt & Road Initiative (BRI) countries from 2003 to 2022. Yale University's Environmental Performance Index (EPI) assesses environmental performance. Advanced second-generation econometrics estimation approaches address concerns like cross-sectional dependence, potential endogeneity, and heterogeneity. Further analysis is employed across four income-level sub-panels: lowincome (LI), lower-middle-income (LMI), upper-middle-income (UMI), and high-income (HI) countries, covering the years 2003 to 2021 to validate reliability and consistency. This …
Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center,
2024
Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Methods In Environmental Studies,
2024
University of San Francisco
Methods In Environmental Studies, Erika Dunagan, Maya Mendoza, Posey Graber, Alex Cullins, Emma Mcginnis, Ally Nepomuceno, Isabella Buchan
Featured Student Work
This publication is a collection of undergraduate research conducted in the Methods in Environmental Studies course at the University of San Francisco in Fall 2024. The student-led projects explore the intersections of place, policy, ecology, and cultural identity through applied environmental research methodologies. Topics include a decolonial examination of the Forest Park Mound Group and Indigenous resilience in St. Louis; a comparative study of Navajo cosmology and ecological justice; a social and environmental impact assessment of Costa Rica’s National Decarbonization Plan; a psychogeographical analysis of Golden Gate Park and its impact on the psyche, emotions, behaviour, and health of urban …
Medical Monitoring Working Group Meeting Minutes,
2024
Atlantic Richfield Company
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
The Impact Of Student Engagement Activities On Future Climate Change Adaptation: The Case Of Student Simulation Models,
2024
Youth Leaders Foundation YLF
The Impact Of Student Engagement Activities On Future Climate Change Adaptation: The Case Of Student Simulation Models, Bassel Mostafa Elkalaf
Future Journal of Social Science
This paper explores the critical role of student engagement in addressing the growing challenges of climate change, with a focus on the Model United Nations (MUN) as a case study. As climate-related security threats increase globally, educational platforms that prepare youth for effective leadership in climate politics are more essential than ever. MUN, a widely practiced student activity simulating global policy-making, provides a valuable opportunity for students to deepen their understanding of the interconnectedness between climate change, peace, and security. By participating in MUN simulations, students engage in debates, develop innovative solutions, and practice diplomatic skills, all while exploring the …