Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025),
2025
Environmental Protection Agency
Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1 (Dated May 23, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024),
2025
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025),
2025
Butte-Silver Bow Reclamation & Environmental Services
Response To Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated April 10, 2025), Abby Peltomaa
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr),
2025
Montana Tech Library
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp),
2025
Montana Tech Library
Revised Draft Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp),
2025
Montana Tech Library
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
On-Site Water Management Field Sampling Plan (Fsp), 2025 Update,
2025
Montana Resources
On-Site Water Management Field Sampling Plan (Fsp), 2025 Update, Mark Thompson, Rampart Solutions
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp),
2025
Montana Tech Library
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp),
2025
Montana Tech Library
Final Bpsou Unreclaimed Sites: Ur-05 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
State And Transition Models For Mulga Rangelands Of Western Australia,
2025
Commonwealth Scientific and Industrial Research Organisation
State And Transition Models For Mulga Rangelands Of Western Australia, Alison O'Donnell, Anna E. Richards, Suzanne Prober, Peter-Jon A. Waddell, Sarah Luxton, Ian Watson, Brett Abbott, Philip Thomas, Joshua E. Foster
Natural resources published reports
This report details a collaborative project between the Western Australian Department of Primary Industries and Regional Development and CSIRO that focused on developing State and Transition Models (STMs) for mulga rangelands in Western Australia. The overarching aim of the project was to improve the common understanding of the characteristics and dynamics of mulga rangeland ecosystems and the expected impacts of management. Specifically, the project aimed to collate expert knowledge and monitoring information using a nationally consistent framework to develop quantitative and dynamic STMs. The geographic scope of the project covers the extensive mulga rangelands of Western Australia, particularly the Gascoyne …
Integrating A Stakeholder-Centric Approach Into Dynamic Adaptation Policy Pathways For Equitable Coastal Flood Risk Management In East Boston,
2025
University of Massachusetts Boston
Integrating A Stakeholder-Centric Approach Into Dynamic Adaptation Policy Pathways For Equitable Coastal Flood Risk Management In East Boston, Shailee M. Desai
Graduate Doctoral Dissertations
This research aims to illustrate a methodology incorporating diverse stakeholder values in adaptation planning to promote equitable outcomes using a hypothetical case study of the Lower Border Street area in East Boston, using the Dynamic Adaptive Policy Pathways (DAPP) framework for managing coastal flood risk. It offers three significant contributions to the field of adaptation planning: (i) It demonstrates how to integrate a stakeholder-specific assessment within the DAPP framework and illustrates individual impacts to a variety of stakeholders, including high- and low-income residents, commercial actors, government actors, and coastal landowners hoping that the planning process remains transparent and motivates local …
2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp),
2025
Montana Tech Library
2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report,
2025
Montana Tech Library
Draft Final 2024 Residential Metals Abatement Program (Rmap): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1,
2025
Montana Tech Library
Draft Final 2025 Residential Metals Abatement Program (Rmap) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-05 Remedial Action Work Plan (Rawp) (Dated March 14, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025),
2025
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia,
2025
The University of San Francisco
Enhancing Water Supply Resilience & Sustainability: Potential Solutions To Address Water Scarcity In Bogotá, Colombia, Sophia Alvarez Wong
Master's Projects and Capstones
Municipal water utilities are in urgent need of adapting to the intensifying impacts of climate change and population growth—key drivers of urban water scarcity worldwide. In rapidly expanding cities like Bogota, Colombia, these pressures have contributed to a severe water crisis driven by prolonged droughts, ecosystem degradation, increasing water demands, and overdependence on limited water sources. This study explores potential adaptation and management strategies that utilities can implement to sustainably strengthen supply system resilience and enhance water security, in the context of low- to middle-income regions. A series of comparative and case study analyses were conducted to assess the feasibility …
