Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp).,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap),
2025
Montana Tech Library
Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025),
2025
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability,
2025
Chapman University
The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary
Mathematics, Physics, and Computer Science Faculty Articles and Research
Hydroclimatic whiplash rapid shifts between drought and flood poses growing risks to U.S. communities. Here, we assess historical extremes and future projections using a normalized streamflow metric: the annual mean flow’s deviation from the 1981–2020 average, expressed as a fraction of that average. This metric is applied to United States Geological Survey records and Localized Constructed Analogs downscaled projections under Representative Concentration Pathways 4.5 and 8.5. Results reveal sharp regional disparities, with drought deficits exceeding 300% of normal flow during multi-year droughts. By linking hydrologic outcomes with the Federal Emergency Management Agency’s National Risk Index, we find that counties facing …
Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2025
Management Service Company, ARCO
Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications,
2025
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She,
2025
Management Service Company, ARCO
Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report,
2025
Montana Resources
Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp),
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel,
2025
Atlantic Richfield Company
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield,
2025
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump,
2025
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump,
2025
Atlantic Richfield Company
Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025),
2025
Environmental Protection Agency
Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh,
2025
Management Service Company, ARCO
Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Performance Mapping And Weighting For The Evapotranspiration Models Of The Openet Ensemble,
2025
U.S. Geological Survey
Performance Mapping And Weighting For The Evapotranspiration Models Of The Openet Ensemble, M. Reitz, J. M. Volk, T. Ott, M. Anderson, G. B. Senay, F. Melton, A. Kilic, R. Allen, Joshua B. Fisher, A. Ruhoff, A. J. Purdy, J. Huntington
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
Evapotranspiration (ET) accounts for the majority of water available from precipitation in the terrestrial water cycle, and improvements to the accuracy, resolution, and coverage of ET data can enhance hydrologic models and assessments. The OpenET collaboration of six remotely sensed ET modeling teams has demonstrated that an ensemble approach to ET estimation generally provides improved accuracy relative to individual ensemble members. The performance of individual models has been shown to vary by land cover type and climate zone, but a thorough study of the variables that influence model performance differences has not yet been conducted. In this paper, we model …
Fisheries Research Report No. 353: Ecological Risk Assessment For The North Coast Demersal Scalefish Resource,
2025
Department of Primary Industries and Regional Development, Western Australia
Fisheries Research Report No. 353: Ecological Risk Assessment For The North Coast Demersal Scalefish Resource, Kimberley A. Smith, Brett Crisafulli, Gabby E. Mitsopoulos, Fabian I. Trinnie, Taylor Grosse, T Thompson, Stephen J. Newman
Fisheries Research Reports
On the 26 March 2025, the Department of Primary Industries and Regional Development (DPIRD) convened an ecological risk assessment (ERA) of the fisheries that access the North Coast Demersal Scalefish Resource (Resource). This Resource comprises a large number of tropical demersal scalefish species that occur in waters of the North Coast Bioregion, including tropical snappers, emperors and cods.
This document contains the results of the ERA along with the background information used to support the risk scoring process. This includes an overview of the Western Australian commercial fisheries that access the Resource, namely the Pilbara Fish Trawl Interim Managed Fishery, …
Fisheries Research Report No. 361: 2024 Assessment Of The Status Of The Elasmobranch Resource Of Western Australia,
2025
Department of Primary Industries and Regional Development, Western Australia
Fisheries Research Report No. 361: 2024 Assessment Of The Status Of The Elasmobranch Resource Of Western Australia, Matias Braccini, Alex Hesp
Fisheries Research Reports
This document provides the 2024 risk-based weight of evidence stock assessment for the elasmobranch (sharks and rays) resource of Western Australia (WA). Gummy (Mustelus antarcticus), dusky (Carcharhinus obscurus), whiskery (Furgaleus macki), and sandbar (C. plumbeus) sharks are the most commonly captured species (~80% of the elasmobranch catch) and have been selected as indicator species for the status of the temperate elasmobranch ‘suite’. However, over 100 elasmobranch species have been caught in commercial and/or recreational fisheries in WA and, with the increasing number of elasmobranch species being listed in national and international protection lists, species-specific scientific advice on stock status at …
