Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons™

Open Access. Powered by Scholars. Published by Universities.®

6,841 Full-Text Articles 9,144 Authors 2,476,838 Downloads 196 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

6,841 full-text articles. Page 27 of 275.

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby 2025 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Wild Robots: Humans, Wilderness, And Technology In Becky Chambers’ Monk And Robot Series, Melissa Moore 2025 Andrews University

Wild Robots: Humans, Wilderness, And Technology In Becky Chambers’ Monk And Robot Series, Melissa Moore

Honors Theses

As technology advances and the environment deteriorates, the way people view the relationships between technology, wilderness, and humans becomes essential for society to move forward. To investigate perceptions about technology’s place in an environmentally conscious society, this project examines manifestations of wilderness/wildness and technology in Becky Chambers’ Monk and Robot series through the lens of ecocriticism. Using Timothy Morton's concept of the ecological thought as a framework for analysis, the circumstances present in the novel suggest that the triangle separating humans, wilderness, and technology has actually collapsed, replaced by an enmeshment of technology, wilderness, and humanity.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta 2025 University of South Florida

A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta

Computer Science and Engineering Faculty Publications

Florida’s Gulf Coast red tide (Karenia brevis) can put toxins into the air, making people cough, irritating the throat, and worsening asthma or other breathing problems especially when winds blow from the ocean toward the beach. Right now, most public updates don’t really help with the question people actually ask when planning a weekend or vacation: “Will going to or close to the beach be risky in the next few weeks?”.

In this project, I build a weekly early warning system that estimates respiratory risk for specific beaches and predicts that risk 2 to 4 weeks ahead. The study covers …


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran 2025 Montana Tech Library

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. 2025 Montana Tech Library

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott 2025 Environmental Protection Agency

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress