2023 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp),
2023
Montana Tech Library
2023 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Residential Metals Abatement Program (Rmap) (Non-Residential Parcels) 2021 Data Summary Report (Dsr),
2023
Montana Tech Library
Final Revised Residential Metals Abatement Program (Rmap) (Non-Residential Parcels) 2021 Data Summary Report (Dsr), Environmental Standards, Inc., Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022,
2023
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022 (June 27, 2022),
2023
Environmental Protection Agency
Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022 (June 27, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2022 (Dated September 29, 2022),
2023
Environmental Protection Agency
Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2022 (Dated September 29, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2022 (Dated December 23, 2022),
2023
Environmental Protection Agency
Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2022 (Dated December 23, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report,
2023
Montana Tech Library
Final 2021 Unreclaimed Sites Sampling Ur-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Margalefidinium Polykrikoides Cyst Resuspension In The Lafayette River, A Sub-Tributary Of The Chesapeake Bay,
2023
Old Dominion University
Margalefidinium Polykrikoides Cyst Resuspension In The Lafayette River, A Sub-Tributary Of The Chesapeake Bay, Gabrielle Greaney, Eduardo Perez Vega, Katherine Crider, Dreux Chappell, Kimberly Powell, Richard Hale, Peter Bernhardt, Margaret Mulholland
Undergraduate Research Symposium
Harmful Algal Blooms are a collection of algae in a body of water that can cause serious environmental issues and health problems in both people and aquatic organisms. Dinoflagellates are microscopic, unicellular, and eukaryotic organisms that are well known for forming harmful algal blooms because of eutrophication. Coastal Virginia suffers from HABs in the Chesapeake Bay and its tributaries. A common species of dinoflagellate, known as Margalefidinium polykrikoides exists in the Chesapeake Bay. The purpose of this study is to determine if sediment resuspension produced by wind generated surface gravity waves cause cysts (dinoflagellate resting stages) to be suspended into …
Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan, Draft Sampling And Analysis Plan (Dated January 24, 2023),
2023
Environmental Protection Agency
Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan, Draft Sampling And Analysis Plan (Dated January 24, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report,
2023
Montana Tech Library
Final 2021 Unreclaimed Sites Sampling Ur-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 30, 2022),
2023
Environmental Protection Agency
2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 30, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-32 Site Evaluation Summary Report (December 16, 2022),
2023
Environmental Protection Agency
Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-32 Site Evaluation Summary Report (December 16, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021,
2023
Montana Tech Library
Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Recycling In The Mountain West,
2023
University of Nevada, Las Vegas
Recycling In The Mountain West, Zachary Billot, Caitlin J. Saladino, William E. Brown Jr.
Environment
This fact sheet synthesizes data on rates of recycling from the March 2021 report "50 States of Recycling," sponsored by the Ball Corporation.The information presented in this document focuses on the effectiveness of recycling in total and by recyclable item, as well as the quantity of product recycled specifically within the Mountain West states of Arizona, Colorado, Nevada, New Mexico, and Utah.
Pan-Arctic Soil Moisture Control On Tundra Carbon Sequestration And Plant Productivity,
2023
San Diego State University
Pan-Arctic Soil Moisture Control On Tundra Carbon Sequestration And Plant Productivity, Donatella Zona, Peter M. Lafleur, Koen Hufkens, Beniamino Gioli, Barbara Bailey, George Burba, Eugénie S. Euskirchen, Jennifer D. Watts, Kyle A. Arndt, Mary Farina, John S. Kimball, Martin Heimann, Mathias Göckede, Martijn Pallandt, Torben R. Christensen, Mikhail Mastepanov, Efrén López-Blanco, Albertus J. Dolman, Roisin Commane, Charles E. Miller, Josh Hashemi, Lars Kutzbach, David Holl, Julia Boike, Christian Wille, Torsten Sachs, Aram Kalhori, Elyn R. Humphreys, Oliver Sonnentag, Gesa Meyer, Gabriel H. Gosselin, Philip Marsh, Walter C. Oechel
Daugherty Water for Food Global Institute: Faculty Publications
Long-term atmospheric CO2 concentration records have suggested a reduction in the positive effect of warming on high-latitude carbon uptake since the 1990s. A variety of mechanisms have been proposed to explain the reduced net carbon sink of northern ecosystems with increased air temperature, including water stress on vegetation and increased respiration over recent decades. However, the lack of consistent long-term carbon flux and in situ soil moisture data has severely limited our ability to identify the mechanisms responsible for the recent reduced carbon sink strength. In this study, we used a record of nearly 100 site-years of eddy covariance …
Approval Letter For The Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report (February 7, 2023),
2023
Environmental Protection Agency
Approval Letter For The Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-05 Site Evaluation Summary Report (February 7, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Residential Metals Abatement Program Borrow Amendment Work Plan (Dated January 12, 2023),
2023
Environmental Protection Agency
Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Residential Metals Abatement Program Borrow Amendment Work Plan (Dated January 12, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2022),
2023
Environmental Protection Agency
2023 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments On The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp) (Dated December 27, 2022),
2023
Environmental Protection Agency
Comments On The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (Qapp) (Dated December 27, 2022), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (February 7, 2023),
2023
Environmental Protection Agency
Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-33 Site Evaluation Summary Report (February 7, 2023), Nikia Greene
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
