Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan,
2024
Montana Tech Library
Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024),
2024
Environmental Protection Agency
Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023,
2024
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh,
2024
Environmental Protection Agency
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster GarIeld, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc,
2024
Environmental Protection Agency
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc,
2024
Environmental Protection Agency
Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design,
2024
Management Service Company, ARCO
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School,
2024
Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024),
2024
Environmental Protection Agency
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Interrelationships Among Local Values Of Wet Bulb Globe Temperature, Heat Index, And Adjusted Temperature,
2024
University of South Florida
Interrelationships Among Local Values Of Wet Bulb Globe Temperature, Heat Index, And Adjusted Temperature, Andrea Giraldo
USF Tampa Graduate Theses and Dissertations
Occupational heat stress significantly affects outdoor workers who face challenges due to increased heat exposure. Because of the prevalence of heat illness, it is important to measure heat stress for outdoor workers. Monitoring occupational heat stress most often relies on the Wet Bulb Globe Temperature (WBGT) measure. Heat Index (HI) is a widely used measure to account for air temperature and humidity. Adjusted Temperature (Tadj) considers air temperature, humidity and estimates radiant heat. There is interest in predicting WBGT from HI and HI from WBGT. This study builds on previous USF research by Bernard and Iheanacho and Irvin to evaluate …
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2,
2024
Montana Tech Library
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes,
2024
Atlantic Richfield Company
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2,
2024
Montana Tech Library
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Yearly Population Data At Census Tract Level Revealed That More People Are Now Living In Highly Fire-Prone Zones In California, Usa,
2024
Miami University
Yearly Population Data At Census Tract Level Revealed That More People Are Now Living In Highly Fire-Prone Zones In California, Usa, Slade Lazeweski, Shenyue Jia, Jessica E. Viner, Wesley Ho, Brian Hoover, Seung Hee Kim, Menas C. Kafatos
Institute for ECHO Articles and Research
In California (CA), the wildland-urban interface (WUI) faces escalating challenges due to surging population and real estate development. This study evaluates communities along CA's WUI that have witnessed substantial population growth from 2010 to 2021, utilizing demographic data and the 2020 WUI boundaries by the University of Wisconsin-Madison SILVIS Lab. Employing the Mann-Kendall test, we analyze yearly population trends for each census tract along the CA WUI and assess their significance. House ownership, affordability, and wildfire risk are examined as potential drivers of this demographic shift. Our findings indicate that 12.7% of CA's total population now resides in census tracts …
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School,
2024
Montana Tech Library
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp),
2024
Montana Tech Library
2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
