Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection Commons™

Open Access. Powered by Scholars. Published by Universities.®

7,809 Full-Text Articles 8,815 Authors 5,377,310 Downloads 220 Institutions

All Articles in Environmental Health and Protection

Faceted Search

7,809 full-text articles. Page 44 of 208.

Improving Rice Yield Using Sensor Based Nitrogen Application And Best Management Practices (Bmps) In Rice-Soybean And Rice-Crawfish Rotational Systems, Charles Darnall 2024 Louisiana State University and Agricultural and Mechanical College

Improving Rice Yield Using Sensor Based Nitrogen Application And Best Management Practices (Bmps) In Rice-Soybean And Rice-Crawfish Rotational Systems, Charles Darnall

LSU Master's Theses

Sustainable rice farming requires effective nutrient management and conservation practices to maintain high yields and minimize environmental impact. Implementing best management practices (BMPs) promotes lower fertilizer application rates, increased N use efficiency, improves soil health, and water quality. Demonstration fields established in two different rotational cropping systems (rice-soybean and rice-crawfish) in Kaplan, LA in 2023. In each rotation system, the benefits of BMPs (sensor based mid-season N management and cover cropping) compared to farmer’s practice (FP) were evaluated using yield, yield components, soil and water quality as metrics. The rice-soybean fields in 2023 and 2024 were both planted with PVL03 …


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson 2024 Management Service Company, ARCO

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson 2024 Montana Tech Library

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott 2024 Environmental Protection Agency

Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu 2024 Northwest A&F University

Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis 2024 Montana Resources

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott 2024 Environmental Protection Agency

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby 2024 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. 2024 Montana Tech Library

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Mold And Dampness In The Built Environment, Cheryl Marcham 2024 Embry-Riddle Aeronautical University

Mold And Dampness In The Built Environment, Cheryl Marcham

Publications

This white paper calls on certified industrial hygienists and IH/OEHS professionals who practice in this area to be informed about the important of systematic building inspections and the strengths and weaknesses of sampling methods. It provides information on common misapprehensions in the lay community about such issues as mycotoxins.


Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe 2024 Environmental Protection Agency

Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe 2024 Environmental Protection Agency

Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe 2024 Environmental Protection Agency

Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe 2024 Environmental Protection Agency

Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2024 Montana Tech Library

Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress