Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024),
2024
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated November 27, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Invasion Stress Mitigates Climate Stress In A Brackish Marsh Amphipod,
2024
University of California, Davis
Invasion Stress Mitigates Climate Stress In A Brackish Marsh Amphipod, Lorna E. Haworth, Sarah Nancollas, Susie N. Landa, Anne E. Todgham, Richelle L. Tanner
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
- Organisms in coastal brackish ecosystems face not only highly variable environmental conditions, but the intensity and stochasticity of these environmental conditions are anticipated to increase due to climate change. While environmental changes are often presented unilaterally as stressors, there are some anthropogenic environmental transformations, such as the introduction of habitat forming plant species, that may mitigate physiological stress imposed by warming. In Suisun Marsh in the California Delta, native plant canopies allow light and heat to penetrate to the understory yet the canopies of the introduced Phragmites australis reed block out sunlight and heat for organisms living below.
- We set …
Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan,
2024
Management Service Company, ARCO
Berkeley Pit Geochemical And Limnological Evaluation Pre-Design Investigation (Pdi) Work Plan, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated October 10, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
And Climate Justice For All,
2024
DePaul University
And Climate Justice For All
DePaul Magazine
DePaul is taking its environmental sustainability and equity prowess to the next level through its Just DePaul and President's Sustainability Committee initiatives that incorporate a climate action plan and student voices. Plus, community partnership courses that involve students in environmental action and justice efforts.
Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data,
2024
Chapman University
Identifying Opportunities For Nature-Based Solutions With Geospatialized Life Cycle Assessments And Fine-Scale Socioecological Data, Gabriela Shirkey, Annick Anctil, Ranjeet John, Venkatesh Kolluru, Leah Mungai, Herve Kashongwe, Lauren T. Cooper, Ilke Celik, Joshua B. Fisher, Jiquan Chen
Biology, Chemistry, and Environmental Sciences Faculty Articles and Research
As we increasingly understand the impact that land management intensification has on local and global climate, the call for nature-based solutions (NbS) in agroecosystems has expanded. Moreover, the pressing need to determine when and where NbS should be used raises challenges to socioecological data integration as we overcome spatiotemporal resolutions. Natural and working lands is an effort promoting NbS, particularly emissions reduction and carbon stock maintenance in forests. To overcome the spatiotemporal limitation, we integrated life cycle assessments (LCA), an ecological carbon stock model, and a land cover land use change model to synthesize rates of global warming potential (GWP) …
Are There Neurological Impacts Of Exposure To A Burned Wildfire Site As It Recovers?,
2024
University of San Diego
Are There Neurological Impacts Of Exposure To A Burned Wildfire Site As It Recovers?, Rubye Strickland
Undergraduate Honors Theses
Wildfires are increasing with climate change, making the human health implications of exposure to burned soils an essential area of research. Metals associated with fire-impacted soils can be inhaled or accidentally ingested by surrounding communities, causing health risks. Several studies have evaluated the health impact of wildfires, but few have done so from a neurological perspective. This study explores metal changes in burned soils over time as a site naturally recovers from wildfire and how these changes may impact human neurological health. Soil samples were collected from the burned area 0, 3, 6, 9, and 12 months after the fire. …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Plan (Dated October 29, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Revision 1, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2024
Management Service Company, ARCO
Re: Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01 (Dated December 3, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She,
2024
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024),
2024
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She,
2024
Management Service Company, ARCO
Silver Bow Creek Butte Area Npl Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan,
2024
Montana Tech Library
Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center,
2024
Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report After The Bell Child Care Center, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes,
2024
Atlantic Richfield Company
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Potential Of Community Forestry In Bhutan To Mitigate Climate Change: Carbon Stocks, Sequestration And Trade-Offs,
2024
University of Sunshine Coast
Potential Of Community Forestry In Bhutan To Mitigate Climate Change: Carbon Stocks, Sequestration And Trade-Offs, Sigyel Delma
Australia-Bhutan Research Conference
Community Forestry (CF) is recognized globally as a forest management regime with the potential to address deforestation and forest degradation, provide forest goods and services to local communities and contribute to climate change mitigation. Around 4% of Bhutan’s forests are currently under CF management and these forests provide essential goods and services for local communities. However, the potential of CF in Bhutan to contribute to climate change mitigation is not well understood and has not been researched. The Bhutan Government is currently exploring the potential to generate revenue from the sale of carbon sequestered in its forests. Community Forestry can …
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01,
2024
Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
