Environmental Justice And Ecology In Social Work Education: Emerging Trends Among Faculty.,
2025
University of Louisville
Environmental Justice And Ecology In Social Work Education: Emerging Trends Among Faculty., Keri Otte
Doctor of Social Work Capstone Projects
March 31, 2025
This paper presents a study of how social work educators in the U.S. are integrating environmental justice and ecological content into social work coursework and /or curriculum. Current literature in this area suggests that educators should be incorporating deep ecology philosophy, using experiential learning techniques, and moving away from anthropocentrism towards ecocentrism. Ten semi-structured interviews were conducted to gather data on pedagogical approaches, educator knowledge and previous training, and barriers to content integration. The interviews took place virtually with social work educators from five geographical areas in the United States. The findings illustrate the importance of transformative …
Technical Memorandum - Re: 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation,
2025
Woodard & Curran
Technical Memorandum - Re: 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024,
2025
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation,
2025
Woodard & Curran
Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr),
2025
Montana Tech Library
Draft Final - Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase I Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr),
2025
Montana Tech Library
Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Final Multi-Pathway Residential Metals Abatement Program Plan,
2025
Montana Tech Library
Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024,
2025
Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report,
2025
Montana Resources
Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024),
2025
Environmental Protection Agency
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024),
2025
Environmental Protection Agency
Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Too Much Of A Good Thing: Lessons From Compromised Rootworm Bt Maize In The Us Corn Belt,
2025
Renmin University of China
Too Much Of A Good Thing: Lessons From Compromised Rootworm Bt Maize In The Us Corn Belt, Ziwei Ye, Christina Difonzo, David A. Hennessy, Jinhua Zhao, Felicia Wu, Shawn P. Conley, Aaron J. Gassmann, Erin W. Hodgson, Bryan Jensen, Janet J. Knodel, Bradley Mcmanus, Lance J. Meinke, Andrew Michel, Bruce Potter, Nicholas J. Seiter, Jocelyn L. Smith, Joseph L. Spencer, Kelley J. Tilmon, Robert J. Wright, Christian H. Krupke
Department of Entomology: Faculty Publications
Widespread use of genetically engineered maize targeting the corn rootworm complex (Diabrotica species) has raised concerns about insect resistance. Twelve years of university field trial and farm survey data from ten United States Corn Belt states indicate that maize hybrids expressing toxins derived from the bacterium Bacillus thuringiensis (Bt maize) exhibited declining protection from rootworm feeding with increased planting while pest pressures simultaneously decreased. The analysis revealed a tendency to overplant Bt maize, leading to substantial economic losses; this was particularly striking in eastern Corn Belt states. Our findings highlight the need to go beyond the “tragedy of the …
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study,
2025
Montana Tech Library
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study,
2025
Montana Tech Library
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report,
2025
Management Service Company, ARCO
Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2025
Montana Tech Library
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp),
2025
Montana Tech Library
2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares),
2025
Montana Tech Library
Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels),
2025
Montana Tech Library
Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report,
2025
Montana Resources
Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
