Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection Commons™

Open Access. Powered by Scholars. Published by Universities.®

7,899 Full-Text Articles 8,859 Authors 5,448,423 Downloads 223 Institutions

All Articles in Environmental Health and Protection

Faceted Search

7,899 full-text articles. Page 102 of 212.

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. 2022 Montana Tech Library

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome 2022 Clemson University

Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome

All Theses

Current biological strategies for remediating trichloroethylene (TCE) in low pH aquifers (i.e., pH14C-TCE assay was developed to determine pseudo first-order rate constants for the degradation of TCE in microcosms containing soil and groundwater from the Boeing Michigan Aeronautical Research Center (BOMARC) superfund site, where the pH ranges from 4.1 to 4.9. The 14C-TCE assay was also adapted to calculate soil-normalized rate constants for data from this site, as well as data that Szwast21 collected from the Beltsville Agricultural Research Center (BARC). In addition to natural attenuation, biostimulation through amendments of methane and nutrients were also assessed. This treatment …


Effects Of Excessive Soil Phosphorus Accumulation On Loblolly Pine (Pinus Taeda L.) Seedlings, Hannah C. Bays 2022 Stephen F. Austin State University

Effects Of Excessive Soil Phosphorus Accumulation On Loblolly Pine (Pinus Taeda L.) Seedlings, Hannah C. Bays

Electronic Theses and Dissertations

Many landowners in East Texas apply poultry litter to pastures as a source of nitrogen (N) for forage crops. After many years of repeated poultry litter application, soils can accumulate extremely high extractable phosphorus (P) concentrations, sometimes over 1000 mg kg-1 of plant available P. Landowners report the conversion of these pastures to loblolly pine (Pinus taeda L.) plantations is often problematic, with poor seedling survival and abnormal tree growth. This study was conducted to assess the effects of excessive soil phosphorus on loblolly pine seedlings. An outdoor pot study was conducted using bare root seedlings and triple …


Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. 2022 Montana Tech Library

Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Pilot Study: Geoenvironmental Controls Of Residential Radon Cedar Falls, Iowa, Maya Mallavarapu, Chad Heinzel Ph.D. 2022 University of Northern Iowa

Pilot Study: Geoenvironmental Controls Of Residential Radon Cedar Falls, Iowa, Maya Mallavarapu, Chad Heinzel Ph.D.

Summer Undergraduate Research Program (SURP) Symposium

  • The leading cause of lung-cancer for individuals who do not smoke is exposure to abnormally high radon concentrations. If radon concentrations within a person’s basement is above 4 pCi/L, the EPA recommends further testing and possible decontamination of the area to mitigate one’s exposure to radon.
  • Radon is a radioactive gas that originates from the decay series of Uranium-238. The decay series begins with Uranium-238 and finishes with an end product of Lead-206. However, during this decay process before Lead-206 is culminated, intermediates such as Uranium-234, Thorium-230, Radium-226, and Radon-222 are also produced


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2022 Montana Tech Library

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. 2022 Montana Tech Library

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike McAnulty 2022 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike McAnulty 2022 Atlantic Richfield Company

Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike McAnulty 2022 Atlantic Richfield Company

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike McAnulty 2022 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. 2022 Montana Tech Library

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exploring New Methods For Quantifying Soil Reduction, Redox Potential, And Iron Reducing Bacteria Using The Iris Method In Wetland Soils., Jessica Everett 2022 Georgia College and State University

Exploring New Methods For Quantifying Soil Reduction, Redox Potential, And Iron Reducing Bacteria Using The Iris Method In Wetland Soils., Jessica Everett

Biology Theses

The presence of hydric soils is one of the key factors used to identify and delineate wetlands as specified by the United States Fish and Wildlife Service (USFWS). The Indicator of Reduction in Soil (IRIS) Method, accepted by the National Technical Committee for Hydric Soils (NTCHS) can indicate iron reduction in soil which can identify hydric soil for wetland delineation efforts. This thesis was conducted to see if the IRIS method had potential for other uses such as quantifying relative measurements of iron reducing bacteria and to see if a colorimetric scale could be curated to bring less subjection to …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike McAnulty 2022 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene 2022 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene 2022 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene 2022 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene 2022 Environmental Protection Agency

Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike McAnulty 2022 Atlantic Richfield Company

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene 2022 Environmental Protection Agency

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress