Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 631 - 660 of 6788

Full-Text Articles in Environmental Indicators and Impact Assessment

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. Aug 2025

Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary Aug 2025

The Future Intensification Of Hydrological Extremes And Whiplashes In The Contiguous United States Increase Community Vulnerability, Surendra Maharjan, Wenzhao Li, John D. Bolten, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Hydroclimatic whiplash rapid shifts between drought and flood poses growing risks to U.S. communities. Here, we assess historical extremes and future projections using a normalized streamflow metric: the annual mean flow’s deviation from the 1981–2020 average, expressed as a fraction of that average. This metric is applied to United States Geological Survey records and Localized Constructed Analogs downscaled projections under Representative Concentration Pathways 4.5 and 8.5. Results reveal sharp regional disparities, with drought deficits exceeding 300% of normal flow during multi-year droughts. By linking hydrologic outcomes with the Federal Emergency Management Agency’s National Risk Index, we find that counties facing …


Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2025

Re: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis Aug 2025

Re: Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2025 Second Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments Received June 28, 2024, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Aug 2025

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty Aug 2025

Re: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott Aug 2025

Re: Approval Letter With Comments For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance (O&M) Butte Treatment Lagoons (Btl) System 2024 (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Aug 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Performance Mapping And Weighting For The Evapotranspiration Models Of The Openet Ensemble, M. Reitz, J. M. Volk, T. Ott, M. Anderson, G. B. Senay, F. Melton, A. Kilic, R. Allen, Joshua B. Fisher, A. Ruhoff, A. J. Purdy, J. Huntington Aug 2025

Performance Mapping And Weighting For The Evapotranspiration Models Of The Openet Ensemble, M. Reitz, J. M. Volk, T. Ott, M. Anderson, G. B. Senay, F. Melton, A. Kilic, R. Allen, Joshua B. Fisher, A. Ruhoff, A. J. Purdy, J. Huntington

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Evapotranspiration (ET) accounts for the majority of water available from precipitation in the terrestrial water cycle, and improvements to the accuracy, resolution, and coverage of ET data can enhance hydrologic models and assessments. The OpenET collaboration of six remotely sensed ET modeling teams has demonstrated that an ensemble approach to ET estimation generally provides improved accuracy relative to individual ensemble members. The performance of individual models has been shown to vary by land cover type and climate zone, but a thorough study of the variables that influence model performance differences has not yet been conducted. In this paper, we model …


Fisheries Research Report No. 353: Ecological Risk Assessment For The North Coast Demersal Scalefish Resource, Kimberley A. Smith, Brett Crisafulli, Gabby E. Mitsopoulos, Fabian I. Trinnie, Taylor Grosse, T Thompson, Stephen J. Newman Aug 2025

Fisheries Research Report No. 353: Ecological Risk Assessment For The North Coast Demersal Scalefish Resource, Kimberley A. Smith, Brett Crisafulli, Gabby E. Mitsopoulos, Fabian I. Trinnie, Taylor Grosse, T Thompson, Stephen J. Newman

Fisheries Research Reports

On the 26 March 2025, the Department of Primary Industries and Regional Development (DPIRD) convened an ecological risk assessment (ERA) of the fisheries that access the North Coast Demersal Scalefish Resource (Resource). This Resource comprises a large number of tropical demersal scalefish species that occur in waters of the North Coast Bioregion, including tropical snappers, emperors and cods.

This document contains the results of the ERA along with the background information used to support the risk scoring process. This includes an overview of the Western Australian commercial fisheries that access the Resource, namely the Pilbara Fish Trawl Interim Managed Fishery, …


Fisheries Research Report No. 361: 2024 Assessment Of The Status Of The Elasmobranch Resource Of Western Australia, Matias Braccini, Alex Hesp Aug 2025

Fisheries Research Report No. 361: 2024 Assessment Of The Status Of The Elasmobranch Resource Of Western Australia, Matias Braccini, Alex Hesp

Fisheries Research Reports

This document provides the 2024 risk-based weight of evidence stock assessment for the elasmobranch (sharks and rays) resource of Western Australia (WA). Gummy (Mustelus antarcticus), dusky (Carcharhinus obscurus), whiskery (Furgaleus macki), and sandbar (C. plumbeus) sharks are the most commonly captured species (~80% of the elasmobranch catch) and have been selected as indicator species for the status of the temperate elasmobranch ‘suite’. However, over 100 elasmobranch species have been caught in commercial and/or recreational fisheries in WA and, with the increasing number of elasmobranch species being listed in national and international protection lists, species-specific scientific advice on stock status at …


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller Aug 2025

Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller

Apparel Merchandising and Product Development Undergraduate Honors Theses

Abstract


The fashion industry is currently experiencing unsustainable rates of pollution within its supply chains. The rapid increase in demand for short lead times perpetrated by large-scale retailers has led to hazardous practices negatively affecting both the environmental conditions and working conditions of producing countries. With this increased pressure, relationships between brands and suppliers have become untenable. Limited transparency and imbalanced power dynamics at the hand of the industry’s leading retailers require restructuring in order to build more sustainable and equitable supply-chain practices. Further, governmental regulation is currently limited in its capacity to enforce sustainable business practices on a global …


Groundwater-Dependent Ecosystems In Southeastern Utah: An Integrated Analysis Of Hydrology, Ecology, And Landscape Change, Colten Lay Aug 2025

Groundwater-Dependent Ecosystems In Southeastern Utah: An Integrated Analysis Of Hydrology, Ecology, And Landscape Change, Colten Lay

All Graduate Reports and Creative Projects, Fall 2023 to Present

In Southeastern Utah, springs play a critical role in sustaining groundwater-dependent ecosystems (GDEs) in a semi-arid environment. However, they remain understudied and face growing threats from climate change, land use modifications, and hydrologic alterations. This study addresses knowledge gaps in spring occurrence, hydrologic function, and ecological condition by integrating field surveys, remote sensing, and geospatial analysis across multiple spatial scales. It provides a comprehensive assessment of spring hydrology, water quality, and ecological conditions using field surveys, remote sensing, and GIS analysis to establish a foundational baseline of GDE resources in the region. I applied a multi-scale monitoring approach across the …


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Assessing Coastal Vulnerability And Climate-Driven Migration Risk In West Africa, Wenzhao Li, Surendra Maharjan, Hesham El-Askary Aug 2025

Assessing Coastal Vulnerability And Climate-Driven Migration Risk In West Africa, Wenzhao Li, Surendra Maharjan, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

This study presents a GIS-based multi-criteria decision-making framework to assess climate-induced migration risk along the West African coast. We developed a comprehensive risk index that integrates environmental hazards such as flood frequency and socio-economic vulnerability indicators, including poverty levels, population density, and adaptive capacity. By utilizing datasets such as the Geocoded Disasters (GDIS) dataset, Social Vulnerability Index (SVI), Poverty and Adaptive Capacity Index (PACI), and the Population Exposure Index (PEI), the study identifies regions most susceptible to displacement. Results reveal that areas like Benin’s Abomey-Calavi, Cotonou, and Akpo-Misserete are especially vulnerable due to high disaster frequency, substantial population exposure, and …


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.