Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 31 - 60 of 6873

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty Oct 2026

Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model, Woodard & Curran Oct 2026

Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area Remedy Effectiveness Evaluation Phase 1 – Draft Updated Conceptual Site Model, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran Oct 2026

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc. Oct 2026

Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Resource Assessment Report No. 10: Southern Nearshore And Estuarine Scalefish Resource: Sandy Sprat (Whitebait) 2026 Assessment, Daniel E. Yeoh, Brett Crisafulli, Rubie Evans-Powell, Sybrand A. Hesp Oct 2026

Resource Assessment Report No. 10: Southern Nearshore And Estuarine Scalefish Resource: Sandy Sprat (Whitebait) 2026 Assessment, Daniel E. Yeoh, Brett Crisafulli, Rubie Evans-Powell, Sybrand A. Hesp

Resource Assessment Reports

Sandy sprat Hyperlophus vittatus (‘whitebait’) is a small-bodied clupeid which occurs in temperate nearshore marine and estuarine waters throughout southern Australia. In Western Australia, this species is almost exclusively caught by the commercial sector on the lower west coast, between Perth and Geographe Bay, where it is considered to comprise a single biological stock. Since 2010, sandy sprat has primarily been caught by the South West Beach Net Fishery (SWBN) in the Bunbury region. This is a shore-based fishery which utilises beach seine nets to target a variety of finfish species in shallow nearshore waters.

Commercial catch is monitored and …


Uncontrolled Surface Flow Areas Drainage K Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage K Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage G Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage G Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage I Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage I Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage J Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage J Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Uncontrolled Surface Flow Areas Drainage F Hydrology Report, Woodard & Curran Oct 2026

Uncontrolled Surface Flow Areas Drainage F Hydrology Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2026

Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc. Sep 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary Sep 2026

A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Wildfires pose escalating threats to the resilience of modern power delivery networks, which are increasingly evolving into complex Cyber-Physical Systems (CPS). In these systems, localized infrastructure damage can precipitate catastrophic large-scale outages and cascading failures. Conventional wildfire risk indices, developed for ecological and community safety, fail to account for the geospatial dependencies and operational context relevant to electricity infrastructure. To bridge this gap, we establish a risk assessment framework that converts meteorological variables into a grid-centric Fire Danger Weather Index (FDWI) and propose the Node-Adaptive Meta Graph Convolutional Recurrent Network (NM-GCRN), a highly efficient AI/ML architecture designed to generate fine-grained, …


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society, Sizhuo Chen, Zhen Cong Sep 2026

Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society, Sizhuo Chen, Zhen Cong

Health Sciences and Kinesiology Faculty Articles

"This study examines perceived individual recovery and perceived community recovery among tornado survivors across three waves spanning four years. Using three-wave longitudinal survey data from survivors in Dallas, Texas; Nashville, Tennessee; and Birmingham, Alabama collected in 2021, 2022, and 2025, we estimate recovery trajectories using linear mixed-effects growth models. We link respondents to tract-level SVI 2020 component measures to examine whether tract-level social vulnerability contextualizes age differences in recovery perceptions. We ask: (1) How do perceived individual recovery and perceived community recovery change over time? (2) Do these trajectories differ by age group? (3) Do community social vulnerability measures contextualize …


Oco-3 Meets Ecostress: Insights Into Ecosystem Diurnal Water-Use Efficiency From Co-Located Solar-Induced Fluorescence And Thermal Observations, Zoe Amie Pierrat, Thomas P. Kurosu, Abhishek Chatterjee, Joshua B. Fisher, Maggie Johnson, Le Kuai, Kanishka Mallick, Nicholas Parazoo, Benjamin Wiebe, Kerry Cawse-Nicholson Sep 2026

Oco-3 Meets Ecostress: Insights Into Ecosystem Diurnal Water-Use Efficiency From Co-Located Solar-Induced Fluorescence And Thermal Observations, Zoe Amie Pierrat, Thomas P. Kurosu, Abhishek Chatterjee, Joshua B. Fisher, Maggie Johnson, Le Kuai, Kanishka Mallick, Nicholas Parazoo, Benjamin Wiebe, Kerry Cawse-Nicholson

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Terrestrial ecosystem regulation of carbon and water fluxes is critical for constraining climate–biosphere feedbacks but remains poorly quantified across space and time. Here, we evaluate whether co-located observations from NASA's Orbiting Carbon Observatory-3 (OCO-3) and the ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) can reproduce ecosystem water use efficiency (WUE) dynamics observed at FLUXNET sites across temporal scales, vegetation types, climates, and drought conditions. We created the ECOCO3 data set, which harmonizes OCO-3 and ECOSTRESS observations in space and time. ECOCO3 captures broad seasonal and diurnal carbon and water flux patterns including midday drought responses. Sampling sensitivity analysis …


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2026

2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Next-Day Pm10 Prediction Maps For South Korea Using Machine Learning With Meteorological And Transboundary Air Quality Data, Yemin Jeong, Jaejin Kim, Jinsoo Kim, Menas Kafatos, Seung Hee Kim, Yangwon Lee Sep 2026

Next-Day Pm10 Prediction Maps For South Korea Using Machine Learning With Meteorological And Transboundary Air Quality Data, Yemin Jeong, Jaejin Kim, Jinsoo Kim, Menas Kafatos, Seung Hee Kim, Yangwon Lee

Institute for ECHO Articles and Research

PM10 poses significant risks to public health, and reliable short-term prediction is essential for air quality management. In this study, we developed an observation-driven framework for generating nationwide next-day (D + 1) PM10 prediction maps over South Korea using machine learning. The framework integrates ground-based PM10 observations from the AirKorea monitoring network, meteorological variables derived from the Local Data Assimilation and Prediction System (LDAPS), and a regional transport proxy based on PM10 observations from upwind locations in China. Station-based predictors were converted into spatially continuous grids using kriging and subsequently used as inputs for two tree-based ensemble models: Random Forest …