Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2221 - 2250 of 6788

Full-Text Articles in Environmental Indicators and Impact Assessment

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Ii Brw Quality Assurance Project Plan (Dated July 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Jul 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene Jul 2022

Comment Letter For The Draft Final 2021 Unreclaimed Site Investigation: Xrf To Laboratory Correlation And Regression Analyses Procedure (Dated May 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene Jul 2022

Final Butte Reduction Works (Brw) Phase I Qapp, Pioneer Technical Services, Inc., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jul 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Jul 2022

Re: Response To Agency Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; Dated April 8, 2022. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 13, 2022), Nikia Greene Jul 2022

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Draft Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Residential Metals Abatement Program (Rmap) (Non- Residential Parcels) Data Summary Report (Dsr) (Dated April 19, 2022), Nikia Greene Jul 2022

Comments For The Draft Final Residential Metals Abatement Program (Rmap) (Non- Residential Parcels) Data Summary Report (Dsr) (Dated April 19, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump (Dated June 23, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump (Dated June 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 – Waste Rock Dump (Dated June 20, 2022), Nikia Greene Jul 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 – Waste Rock Dump (Dated June 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Revised Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase Ii Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Final Butte Reduction Works (Brw) Phase Ii Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nabat Ml: Utilizing Deep Learning To Enable Crowdsourced Development Of Automated, Scalable Solutions For Documenting North American Bat Populations, Ali Khalighifar, Benjamin S. Gotthold, Erin Adams, Jenny Barnett, Laura O. Beard, Eric R. Britzke, Paul A. Burger, Kimberly Chase, Zackary Cordes, Paul M. Cryan, Emily Emily, Christopher T. Fill, Scott E. Gibson, G. Scott Haulton, Kathryn M. Irvine, Lara S. Katz, William L. Kendall, Christen A. Long, Oisin Mac Aodha, Tessa Mcburney, Sara Mccarthy, Matthew W. Mckown, Joy O'Keefe, Lucy D. Patterson, Kristopher A. Pitcher, Matthew Rustand, Jordi L. Segers, Kyle Seppanen, Jeremy L. Siemers, Christian Stratton, Bethany R. Straw, Theodore J. Weller, Brian E. Reichert Jul 2022

Nabat Ml: Utilizing Deep Learning To Enable Crowdsourced Development Of Automated, Scalable Solutions For Documenting North American Bat Populations, Ali Khalighifar, Benjamin S. Gotthold, Erin Adams, Jenny Barnett, Laura O. Beard, Eric R. Britzke, Paul A. Burger, Kimberly Chase, Zackary Cordes, Paul M. Cryan, Emily Emily, Christopher T. Fill, Scott E. Gibson, G. Scott Haulton, Kathryn M. Irvine, Lara S. Katz, William L. Kendall, Christen A. Long, Oisin Mac Aodha, Tessa Mcburney, Sara Mccarthy, Matthew W. Mckown, Joy O'Keefe, Lucy D. Patterson, Kristopher A. Pitcher, Matthew Rustand, Jordi L. Segers, Kyle Seppanen, Jeremy L. Siemers, Christian Stratton, Bethany R. Straw, Theodore J. Weller, Brian E. Reichert

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

  1. Bats play crucial ecological roles and provide valuable ecosystem services, yet many populations face serious threats from various ecological disturbances. The North American Bat Monitoring Program (NABat) aims to use its technology infrastructure to assess status and trends of bat populations, while developing innovative and community-driven conservation solutions.

  2. Here, we present NABat ML, an automated machine-learning algorithm that improves the scalability and scientific transparency of NABat acoustic monitoring. This model combines signal processing techniques and convolutional neural networks (CNNs) to detect and classify recorded bat echolocation calls. We developed our CNN model with internet-based computing resources (‘cloud environment’), and …


Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons And Bpsou Subdrain Sampling And Monitoring Quality Assurance Project Plan, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons And Bpsou Subdrain Sampling And Monitoring Quality Assurance Project Plan, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Jul 2022

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Review Of A Framework For Sustainable Thinking: Is Ql For Citizenship Even Possible?, Nathan D. Grawe Jul 2022

Review Of A Framework For Sustainable Thinking: Is Ql For Citizenship Even Possible?, Nathan D. Grawe

Numeracy

Van Antwerp and Heun's A Framework for Sustainability Thinking offers an extensive collection of data related to sustainability with an emphasis on energy. Intended for a primary audience of undergraduate students, the authors set the data in the context of the IPARX identity which notes that impacts (I) are the product of population (P), affluence (A), resource intensity of economic activity (R), and impact of the resources (X). In addition to being a useful text for seminars focused on sustainability and energy use, the book provides a context for contemplating the roles of expertise vs. general quantitative literacy when addressing …


Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Btc Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jul 2022

Btc Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Droughtscape, Summer 2022, National Drought Mitigation Center Jul 2022

Droughtscape, Summer 2022, National Drought Mitigation Center

DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023)

DroughtScape, Summer 2022


Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services Jul 2022

Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix B - Data Validation Reports, Pioneer Technical Services, Inc. Jul 2022

Appendix B - Data Validation Reports, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.