Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2161 - 2190 of 6788

Full-Text Articles in Environmental Indicators and Impact Assessment

Approval Of The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (Dated July 20, 2022), Nikia Greene Aug 2022

Approval Of The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2nd Quarter 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2022

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc. Aug 2022

2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Second Quarter Laboratory Edd, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 Second Quarter Laboratory Edd, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 2q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 2q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Electronic Data Wssou For Dsr, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

Electronic Data Wssou For Dsr, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 2q Btl Chem Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 2q Btl Chem Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10585806 Edd, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

10585806 Edd, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Btl Chemdump, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 3q Btl Chemdump, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10578145, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

10578145, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Forest Fire Effects On Landscape Snow Albedo Recovery And Decay, Max Gersh, Kelly E. Gleason, Anton Surunis Aug 2022

Forest Fire Effects On Landscape Snow Albedo Recovery And Decay, Max Gersh, Kelly E. Gleason, Anton Surunis

Environmental Science and Management Faculty Publications and Presentations

Surface snow albedo (SSA) darkens immediately following a forest fire, while landscape snow albedo (LSA) brightens as more of the snow-covered surface becomes visible under the charred canopy. The duration and variability of the post-fire snow albedo recovery process remain unknown beyond a few years following the fire. We evaluated the temporal variability of post-fire snow albedo recovery relative to burn severity across a chronosequence of eight burned forests burned from 2000 to 2019, using pre- and post-fire daily, seasonal, and annual landscape snow albedo data derived from the Moderate Resolution Imaging Spectroradiometer (MOD10A1). Post-fire annual LSA increased by 21% …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Removal Of Selenium And Heavy Metals From Coal Combustion Residuals Wastewater Using Surface Modified Iron Based Media, Madan Tandukar, Alex Korff, Andrew Vincent, Chris Hardin Aug 2022

Removal Of Selenium And Heavy Metals From Coal Combustion Residuals Wastewater Using Surface Modified Iron Based Media, Madan Tandukar, Alex Korff, Andrew Vincent, Chris Hardin

World of Coal Ash Proceedings

No abstract provided.


Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene Aug 2022

Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene Aug 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2022

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Supporting Dataset For Observed And Projected Global Warming Pressure On Coastal Hypoxia, Michael M. Whitney Aug 2022

Supporting Dataset For Observed And Projected Global Warming Pressure On Coastal Hypoxia, Michael M. Whitney

Department of Marine Sciences

This archive contains the supporting dataset for the Biogeosciences article “Observed and projected global warming pressure on coastal hypoxia” by Michael M. Whitney. The main objective of the article is studying global patterns exacerbating coastal hypoxia by analyzing linear trends in SST, surface oxygen capacity (saturation concentration), and (vertical-minimum) oxygen concentration. Observations from a satellite-derived SST global climate dataset are analyzed to provide a context of coastal SST and oxygen-capacity trends observed over the last four decades. New analysis of 21st century projections from the Community Earth System Model (CESM) Large Ensemble Project is completed for coastal areas. Observed and …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.