Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Bridges

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 61 - 72 of 72

Full-Text Articles in Civil Engineering

Transverse-Earthquake Induced Deformations Of A Bridge Approach Embankment In The New Madrid Seismic Zone, Wanxing Liu, Richard Wesley Stephenson, Ronaldo Luna Jan 2006

Transverse-Earthquake Induced Deformations Of A Bridge Approach Embankment In The New Madrid Seismic Zone, Wanxing Liu, Richard Wesley Stephenson, Ronaldo Luna

Civil, Architectural and Environmental Engineering Faculty Research & Creative Works

It is predicted that strong earthquakes, larger than M 7.0, may occur within next 50 years in the New Madrid Seismic Zone (NMSZ), the location of three of the most powerful earthquakes in United States history. Large displacements may occur during strong earthquakes that can cause an embankment to fail or lose its function. The hyperbolic stress-strain model with Masing rules was modified to account for strength and stiffness reduction due to change in the effective confining pressure. The Byrne model was combined with a hyperbolic model to calculate the pore water pressure caused by seismic shaking. This modified hyperbolic …


Implementation Of A Non-Metallic Reinforced Bridge Deck, Volume 2: Thayer Road Bridge, Robert J. Frosch, Ali Cihan Pay Jan 2006

Implementation Of A Non-Metallic Reinforced Bridge Deck, Volume 2: Thayer Road Bridge, Robert J. Frosch, Ali Cihan Pay

JTRP Technical Reports

The primary maintenance problem with bridges in Indiana has been deterioration of the concrete deck which is often related to corrosion of the reinforcing steel. While a corrosion protection system consisting of epoxy-coated reinforcement in combination with 2-1/2 in. of Class C concrete cover has been used in Indiana, research and experience have demonstrated that this system can be compromised. As an alternative solution to the corrosion problem in reinforced concrete, fiber reinforced polymer (FRP) bars which are corrosion resistant can be provided as reinforcement. This research was divided into two phases directed towards the implementation of a nonmetallic reinforced …


Continuity Of Bridges Composed Of Simple-Span Precast Prestressed Concrete Girders Made Continuous, Libin Yin Aug 2004

Continuity Of Bridges Composed Of Simple-Span Precast Prestressed Concrete Girders Made Continuous, Libin Yin

Dissertations

Bridges composed of simple-span, precast, prestressed concrete girders made continuous via cast-in-place decks and diaphragms are continuous only for live loads and superimposed dead loads. The continuity diaphragms often crack due to time dependent effects in the girders. These cracks not only impair bridge ascetics and durability, but also reduce "degree of continuity". A related issue is that joint construction is time consuming and expensive due to reinforcement congestion. This dissertation presents a series of field tests, analytical studies, and laboratory experiments concerning the design and performance of this type of bridge.

Based on a survey of the state departments …


An Analysis Of Seismic Hazards In Indiana, Jennifer Haase, Robert Nowack, Chi Hyun Park, Alison Hunyar, John Hill, Michael Hamburger Jan 2004

An Analysis Of Seismic Hazards In Indiana, Jennifer Haase, Robert Nowack, Chi Hyun Park, Alison Hunyar, John Hill, Michael Hamburger

JTRP Technical Reports

Current USGS probabilistic seismic hazard estimates (Frankel et al., 2002) show a higher seismic hazard in southwestern Indiana than for the rest of the state. This is expected based on past work documenting large pre-historic events in the Wabash Valley, and also based on isoseismal levels of shaking from the New Madrid 1811-1812 earthquakes. When assessing the hazard on a county by county basis, the local soil conditions produce amplification of shaking in regions with soft or unconsolidated sediments relative to firm-rock sites. We have reproduced the probabilistic seismic hazard calculation following the USGS methodology for the state of Indiana …


Application Of Dynamic System Identification To Timber Bridges, S T. Peterson, D I. Mclean, David Pollock Jan 2003

Application Of Dynamic System Identification To Timber Bridges, S T. Peterson, D I. Mclean, David Pollock

Faculty Publications - Biomedical, Mechanical, and Civil Engineering

A method of global nondestructive evaluation for identifying local damage and decay in timber beams was developed in previous analytical studies and verified experimentally using simply supported beams in the laboratory. The method employs experimental modal analysis and an algorithm that monitors changes in modal strain energy between the mode shapes of a damaged structure with respect to the undamaged structure. A simple three-girder bridge was built and tested in a laboratory to investigate the capability and limitations of the method for detecting damage in a multimember timber structure. The laboratory tests showed that the method can correctly detect and …


Quality Control Parameters For Robotic Bridge Painting, Yong Bai, Leonhard E. Bernold Apr 2001

Quality Control Parameters For Robotic Bridge Painting, Yong Bai, Leonhard E. Bernold

Civil and Environmental Engineering Faculty Research and Publications

To protect a steel bridge from corrosion, periodic painting is needed. Bridge painting operations are dangerous and hazardous to human health. A robotic bridge painting system is being developed to replace the human being. One major problem with robotic bridge painting is how to achieve the specified coating quality, which includes two aspects: (1) the coating thickness; and (2) the coating appearance. To ensure quality of the robotic bridge painting, the writers have investigated: (1) the parameters that affect the coating thickness and appearance; (2) the values of the parameters to achieve the required thickness and appearance for the robotic …


Guidelines For Permitting Overloads, Part 2: Statistical Analysis Of Overload Vehicle Effects On Indiana Highway Bridges, Donald W. White, J. A. Ramirez, N Prasad, Thomas Kuczek Jan 1994

Guidelines For Permitting Overloads, Part 2: Statistical Analysis Of Overload Vehicle Effects On Indiana Highway Bridges, Donald W. White, J. A. Ramirez, N Prasad, Thomas Kuczek

JTRP Technical Reports

This report summarizes an analytical investigation carried out to develop a set of guidelines for regulation of overload vehicles in Indiana. A formula based first phase evaluation of overload permit requests is developed through statistical study of the rating of a representative sample of the highway bridges in Indiana using a representative sample of overload vehicles observed in the state in 1990 and 1991 plus the HS 20 design vehicle and the two Indiana Toll Road loadings. A sample of 148 bridges is chosen from a total population of 3700 Indiana highway bridges using a proportionate stratified random sampling process. …


Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation Jan 1973

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation

Maine Collection

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland

Report by Fay, Spofford & Thorndike, Inc., Engineers, Boston, Mass.

Prepared for the Maine Department of Transportation, Augusta, Maine, 1973.

Contents: Table of Contents / List of Figures / List of Tables / Introduction / Summary of Findings / Section 1 - General Background - Location Study / Section 2 - Alternative Facilities and Locations / Section 3 - Comparison of Construction Costs - Tunnel Versus Bridge / Section 4 - Traffic Analysis / Section 5 - Cost Effectiveness Analysis / Section 6 - Financial …


Design Of A Three Hinged Arch Steel Bridge, Hermann Otto Schulze Jan 1899

Design Of A Three Hinged Arch Steel Bridge, Hermann Otto Schulze

Bachelors Theses

No abstract provided.


The Cost Of A Structure Which Is To Take The Place Of The Beaver Bridge, Rudolph C. Hoyer Jan 1879

The Cost Of A Structure Which Is To Take The Place Of The Beaver Bridge, Rudolph C. Hoyer

Professional Degree Theses

"The subject of this treatise is the cost of a structure, which is to take the place of the Beaver Bridge.

This bridge is located on the St. L and San F. Rwy., four miles southwest of Rolla and it spans a deep valley nearly a 1000 ft. in width in the bottom of which runs a small stream The course of roadway over the bridge is N. 24 1/2 E.

The old wooden Howe Truss bridge, being no longer considered perfectly safe, on account of its age, measure was taken to supply its place with some new structure that, …


Iron Bridges, Lindsay Coppedge Dec 1877

Iron Bridges, Lindsay Coppedge

Bachelors Theses

"The superiority of iron over wood as the material for bridges is now generally understood that we see no need of any discussion"--page 3.


Maramec Bridge, Thomas H. Millsaps Dec 1876

Maramec Bridge, Thomas H. Millsaps

Professional Degree Theses

"Bridge-building, as a science, is comparatively of recent date, for relating to now, of what may be called ancient bridges, do we read of them having been mathematical calculations, determining the strains upon the constituent parts of the bridge structure. This very necessary operation seems to have been entirely omitted. This was, probably, because to that time, there had been no thoroughly scientific investigation, of the new and beautiful subject of scientific bridge-building. At the present time, we determine with a minuteness the strain thrown upon any part of a bridge. We are thus enabled to give the proper dimensions …