Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

Construction

Discipline
Institution
Publication Year
Publication
Publication Type
File Type

Articles 541 - 570 of 842

Full-Text Articles in Civil and Environmental Engineering

Bs News Jan 2001

Bs News

Building Services Engineering

No abstract provided.


Life-Cycle Cost Analysis: A Computer Aided Tool For The Egyptian Construction Industry, Ahmed Mohamed Ahmed Ibrahim Jan 2001

Life-Cycle Cost Analysis: A Computer Aided Tool For The Egyptian Construction Industry, Ahmed Mohamed Ahmed Ibrahim

Theses and Dissertations

The construction industry can be considered as an indication of economical status of any country.


Bs News Dec 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Jul 2000

Bs News

Building Services Engineering

No abstract provided.


Nighttime Construction Issues, Donn E. Hancher, Timothy R. B. Taylor Jul 2000

Nighttime Construction Issues, Donn E. Hancher, Timothy R. B. Taylor

Kentucky Transportation Center Research Report

This report addresses several issues to consider when considering performing highway construction work in Kentucky at night. Surveys of other state departments of transportation and Kentucky highway contractors were made to identify best practices and concerns. An advisory committee of experienced KyTC engineers plus contractor representatives met extensively to identify successful approaches for handling key issues which arise on night-time construction projects.

Seventeen specific recommendations have been proposed to enhance the Cabinet's use of night-time construction for its projects. These cover several issues related to night-time work, including contract requirements, traffic control, law enforcement, personnel issues, lighting and public awareness. …


Long-Term Monitoring Of Experimental Features, Subtask 2: Alexandria-Ashland Highway (Ky 9) Pavement Performance Monitoring, L. John Fleckenstein, Monica L. Osborne, David L. Allen Jun 2000

Long-Term Monitoring Of Experimental Features, Subtask 2: Alexandria-Ashland Highway (Ky 9) Pavement Performance Monitoring, L. John Fleckenstein, Monica L. Osborne, David L. Allen

Kentucky Transportation Center Research Report

Construction on the AA Highway began in late 1985 and was completed in late 1990. Prior to construction, 30 different test sections had been designed into the highway for evaluation. The test sections contain 23 different characteristic qualities and different segment lengths. The segment lengths range from 1.28 to 9.13 miles and took one and a half to four years to complete each segment.

The sections were constructed from various pavement and shoulder designs. The designs are varied by parameters such as the type of subgrade stabilization, drainage type, surface class, surface aggregate, and more. The purpose for monitoring the …


Bs News Jun 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News May 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Apr 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Mar 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Feb 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Jan 2000

Bs News

Building Services Engineering

No abstract provided.


Bs News Dec 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Nov 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Oct 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 1999

Bs News

Building Services Engineering

No abstract provided.


Evaluation Of Superpave In Kentucky, L. John Fleckenstein, David L. Allen, Richard Reitenour Sep 1999

Evaluation Of Superpave In Kentucky, L. John Fleckenstein, David L. Allen, Richard Reitenour

Kentucky Transportation Center Research Report

Approximately 93 percent of all pavements in the United States are surfaced with hot-mix asphalt (HMA). For many decades, most asphalt pavements were designed using the Marshall mix design method. In 1987, the Strategic Highway Research Program was established with 50 million dollars being allocated for asphalt pavement research. From that research, a new asphalt mix design procedure, called Superpave, was developed. Many states have adopted, or are in the process of adopting, this procedure, including Kentucky. In 1995, Kentucky placed its first Superpave mixture on KY 676 in Franklin County. In 1998, the Kentucky Transportation Cabinet requested that the …


Bs News Aug 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Jun 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News May 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Apr 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Mar 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Feb 1999

Bs News

Building Services Engineering

No abstract provided.


Practical Hints For The Layout And Construction Of 10,000 M3 Circular Dams, Terry Babbington, J S. Addison Jan 1999

Practical Hints For The Layout And Construction Of 10,000 M3 Circular Dams, Terry Babbington, J S. Addison

Bulletins 4000 -

These notes and illustrations have been compiled to assist earthmovers in the construction of circular excavated earth tank dams, with pipe inlets. Construction techniques tend to evolve over time, so the methods described in this publication will not be definitive, but, they may improve efficiency of construction in the interim. Although the example used in these notes refers to 10,000 m3 dams, the construction techniques, using a bulldozer, described here equally apply to dams of any volume of similar design. Only dimensions will vary. earthmovers using a scarper together with a bulldozer should be able to extract useful information from …


Management Of Change In The Irish Construction Industry, Louis Gunnigan Jan 1999

Management Of Change In The Irish Construction Industry, Louis Gunnigan

Masters

Ireland is changing and this change is nowhere more apparent than in the rapidly growing construction industry. The industry is being forced to change at an unprecedented pace. This thesis sets out to develop a framework on which construction organisations can approach and manage change.

It examines the issues that will cause change, reviews the available literature to find how change can be managed and controlled, and develops a model for guiding change programmes in the construction industry. The model is tested against three case studies, the first two of which are concerned with finding increases in efficiency and demonstrating …


Bs News Jan 1999

Bs News

Building Services Engineering

No abstract provided.


Bs News Dec 1998

Bs News

Building Services Engineering

No abstract provided.


Bs News Nov 1998

Bs News

Building Services Engineering

No abstract provided.