Open Access. Powered by Scholars. Published by Universities.®

Management and Operations Commons™

Open Access. Powered by Scholars. Published by Universities.®

Business

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 121 - 137 of 137

Full-Text Articles in Management and Operations

Logistics Control Facility: A Normative Model For Total Asset Visibility In The Air Force Logistics System, Eric C. Lorraine, Michael E. Michno Sep 1994

Logistics Control Facility: A Normative Model For Total Asset Visibility In The Air Force Logistics System, Eric C. Lorraine, Michael E. Michno

Theses and Dissertations

Computer simulation was used to evaluate the impact of a Logistics Control Facility LCF with a Total Asset Visibility TAV system on the AF logistics systems ability to support a weapon system. For this study, the B-1B was chosen as the weapon system of interest. Two performance measures, expected fully mission capable rates and expected pipeline quantities, were used to evaluate the simulation results. Two-sample tests were used to compare the current logistics configuration of the B-1B with the same configuration, but with an LCF controlling the movement of assets. The expected FMC rate performance measure showed significant results while …


Organic Maintenance Performance Measurement: A New Approach, John S. Nehr, William G. Queener Sep 1994

Organic Maintenance Performance Measurement: A New Approach, John S. Nehr, William G. Queener

Theses and Dissertations

The growing role of Air Force Air Logistics Centers ALC in complex, multiyear developmental programs increases the need for effective cost and schedule performance measurement. In order to effectively manage these activities, timely and accurate cost and schedule information must be collected and compared with an established baseline. The ALCs need a new management technique which facilitates this type of performance measurement. A proven approach to cost and schedule performance measurement in weapon system acquisitions is Earned Value EV. This approach, required of contractors who are subjected to the CostSchedule Control Systems Criteria CSCSC, allows the program manager to obtain …


Demonstration Of Improved Software Support Labor Estimation For Air Force Operational Flight Programs Through Functional Orientation, Ronald R. Warner Jr., Darrel L. Wright Dec 1993

Demonstration Of Improved Software Support Labor Estimation For Air Force Operational Flight Programs Through Functional Orientation, Ronald R. Warner Jr., Darrel L. Wright

Theses and Dissertations

This study demonstrated two approaches to improve current software support effort estimation models for aircraft software. Both approaches involved a functional orientation not used by existing models. The first approach demonstrated how to orient a model to reflect the block change cycle modification process and how to represent support effort changes over time in order to improve effort estimation accuracy. Current software models do not reflect the support environment or the temporal characteristics of aircraft software support. The second approach demonstrated how to calibrate a model by properly selecting source data in order to increase accuracy. Support calibration is not …


Scheduling Air Mobility Command's Channel Cargo Missions, Gregory S. Rau Mar 1993

Scheduling Air Mobility Command's Channel Cargo Missions, Gregory S. Rau

Theses and Dissertations

Through the use of a linear programming model, this research revised the initial schedule for AMC's channel cargo missions to eliminate any excess delay enroute by minimizing the cumulative, weighted time-in-system for all cargo, according to a given cargo flow. In fact, the revised schedule minimizes any assigned nonnegative weighting of the time-in-system, due to the properties of equivalent measures of performance. When combined with Step One of a proposed two-step process for revising AMC's channel mission schedule, this research can be used to improve the current schedule based on Step One's cargo flow. By carefully defining the notation and …


An Analysis Of The Information Requirements Of Conus Based Deputy Commanders For Maintenance, Daniel J. Green Dec 1991

An Analysis Of The Information Requirements Of Conus Based Deputy Commanders For Maintenance, Daniel J. Green

Theses and Dissertations

The purpose of this research was to identify the information requirements of Air Force Deputy Commanders for Maintenance. It had three basic objectives: (1) identify the critical success factors that they monitor on a continuous basis, (2) identify similarities in those requirements for all DGMs and across major commands, and (3) determine if the application of information technology would enhance their decision making. Surveys were sent to all CONUS based Deputy Commanders for Maintenance. The study found that there were nine critical success factors that were used by a majority of all respondents. In addition, nine command-specific critical success factors …


An Evaluation Of Logistics Support For F-16 Aircraft Owned By Foreign Countries, Paul J. Lyons Sep 1991

An Evaluation Of Logistics Support For F-16 Aircraft Owned By Foreign Countries, Paul J. Lyons

Theses and Dissertations

The purpose of this thesis was to examine the logistics support provided by the United States Air Force (USAF) for F-16 aircraft owned by foreign countries. The research drew from historical trends and personal experiences to examine the ability of the U.S. to provide logistics support for F-16 aircraft owned by U.S. allies. The study found that timely, efficient support of FMS customers possessing F-16 aircraft does not appear to be a principal concern of the USAF logistics system. Complexity of processes, untimely responses, and failure to consider customer needs are common failings on the part of the USAF.


An Analysis Of Measures Used To Evaluate The Air Force Critical Item Program, Robert R. Lee Sep 1991

An Analysis Of Measures Used To Evaluate The Air Force Critical Item Program, Robert R. Lee

Theses and Dissertations

The purpose of this study was to evaluate the potential of two measures, percent defects and cycle time, to measure the overall performance of the Air Force Critical Item Program (CIP). The need for such study was generated from the current absence of any measurement system available to evaluate the CIP. This research used these two measures with actual data, evaluated the correlation between aircraft availability and percent defects and cycle time, and analyzed management perceptions addressing the usefulness of these measures for field use. Performance of this analysis resulted in support for these measures by over two thirds of …


Inaccurate Data Entry Into The Air Force Maintenance Data Collection System, Jon R. Determan Sep 1991

Inaccurate Data Entry Into The Air Force Maintenance Data Collection System, Jon R. Determan

Theses and Dissertations

This research investigated the data collection environment under the Core Automated Maintenance System (CAMS), a computerized information system used in the Air Force's aircraft maintenance complexes. The research measured maintenance personnel's perception of the nature, extent, and causes of data inaccuracies occurring in the CAMS data collection environment. The nature was differentiated as being either intentional or accidental. Maintenance personnel felt that difficulty in entering information into CAMS accounted for the largest percentage of intentional errors and that insufficient training on CAMS accounted for the largest percentage of accidental errors. A comparison of this research to the results of earlier …


Challenges To United States Tactical Air Force Aircraft Maintenance Personnel: Past, Present And Future, Barbara L. Harris Sep 1991

Challenges To United States Tactical Air Force Aircraft Maintenance Personnel: Past, Present And Future, Barbara L. Harris

Theses and Dissertations

This study assessed the challenges Tactical Air Force (TAF) aircraft maintenance personnel face as a result of the TAF reorganization. The goal was to provide aircraft maintenance managers a basis for evaluating and meeting those challenges. To accomplish this, emphasis was placed on documenting the concepts, events, and conditions which led to changes in military aircraft maintenance from the birth of aviation to the present. Current issues such as the proposed move to two-level maintenance and the formation of the TAF composite and Objective Wings were also addressed. Research was conducted through the review of available historical documents, complemented by …


Analysis Of Department Of Defense Organic Depot Maintenance Capacity Management And Facility Utilization Factors, Marlies Dewoody Sep 1991

Analysis Of Department Of Defense Organic Depot Maintenance Capacity Management And Facility Utilization Factors, Marlies Dewoody

Theses and Dissertations

This study investigated the effects of mandated depot capacity utilization rates on throughput, inventory, and operating expense. The measures of merit analyzed were work in process inventories, leadtime, and throughput. Since the services do not use a common computer system to track/compute capacity data, a computer simulation provided the data used to meet the research objectives. The simulation modeled a serially interdependent system subject to statistical fluctuations. Variability in the system was reduced by reducing the spread around the processing time mean. Buffer inventories were placed in front of each process to protect the process from variability. Constrained systems were …


Study On In-Theater Maintenance Support For Poaf F-16, Rui J. Gomes Sep 1991

Study On In-Theater Maintenance Support For Poaf F-16, Rui J. Gomes

Theses and Dissertations

The purpose of this study was to evaluate the capacity to generate a desired level of sorties of the F-16 weapon system. This capacity depends on the maintenance concept and structure, that defines a specific level of in-theater resources available. The theater is intended to reflect Portuguese Air Force logistic operations planned for the F-16, with one operational base and a possible Centralized Intermediate Repair Facility (CIRF), not co-located. The TSAR simulation program and one USAF database was used to perform the evaluation were defined and compared. The study focused on the unscheduled maintenance tasks and repairable items, in particular …


Determining Production Capability In Aircraft Maintenance: A Regression Analysis, Charles R. Jung Sep 1991

Determining Production Capability In Aircraft Maintenance: A Regression Analysis, Charles R. Jung

Theses and Dissertations

This research analyzed twenty-three maintenance constraint and three production output performance measures for nine SAC aircraft systems. SAS System for Elementary Statistical Analysis is used to analyze twenty-one months of ex post facto maintenance data. Correlation analysis is used to identify maintenance constraints that assist in explaining aircraft maintenance production capability. Forward stepwise regression is used to build predictive models of maintenance production capability for each of the nine aircraft systems. The twenty-three maintenance constraint measures are regressed against three productivity output measures: Mission Capable Rate, Total Not Mission Capable Supply Rate and Total Not Mission Capable Maintenance Rate. The …


An Evaluation Of The Implementation Of Two-Levels Of Maintenance At Strategic Air Command Intercontinental Ballistic Missile Bases, Alan H. Russell Sep 1991

An Evaluation Of The Implementation Of Two-Levels Of Maintenance At Strategic Air Command Intercontinental Ballistic Missile Bases, Alan H. Russell

Theses and Dissertations

As a result of the 1979 Defense Management Review, Headquarters, Strategic Air Command has initiated programs of alternative levels of maintenance in order to trim excess costs. This study investigates the suitability of the SAC program which changed selected base-level strategic missile maintenance tasks from three to two-levels of maintenance. Using an opinion oriented questionnaire, this research surveyed a sample of missile maintenance personnel on their perceptions of the SAC program which implemented an alternative to intermediate-level maintenance. Analysis of survey results show respondents tended to believe the SAC program has not added benefit to their mission effectiveness. Other studies …


An Investigation Of Project Management Techniques For Scheduling Raaf Depot Level Maintenance, Kerry M. Bayley Sep 1991

An Investigation Of Project Management Techniques For Scheduling Raaf Depot Level Maintenance, Kerry M. Bayley

Theses and Dissertations

This research investigates scheduling performances of commercial project management software. It is based on difficulties that the Royal Australian Air Force experienced in evaluating microcomputer-based packages in maintenance task scheduling of aircraft undergoing Depot Level Maintenance. A literature review found only one paper quantifying commercial software performances. No standard performance metrics or test data were found. Several packages were evaluated using a common set of 110 single-project resource- constrained networks. The performance measure used was closeness to optimally minimum Total Durations. No package performed best on all problems. On average, the best produced schedules 5.2% longer than optimal, with 95 …


The Effect Of Defense Management Review Decision 904, Stock Funding Depot Level Reparables, On Cash Flow Within The Reparable Support Division Of The Air Force Stock Fund, Deborah A. Elliot Aug 1991

The Effect Of Defense Management Review Decision 904, Stock Funding Depot Level Reparables, On Cash Flow Within The Reparable Support Division Of The Air Force Stock Fund, Deborah A. Elliot

Theses and Dissertations

This study investigated what the potential cash flow condition of the Reparable Support Division of the Air Force Stock Fund might be after final implementation of the procedures outlined in Defense Management Review Decision 904, Stock Funding Depot Level Reparables. The operation of the future Reparable Support Division was modelled using the General Purpose Simulation Software (GPSS/H) package and future cash flow conditions were projected through use of this model. Recommendations were then made based on the results of these projections and based on other data gathered during the course of the research process.


The Maine Airport System Plan : Summary Report, Systems Analysis & Research Corp. Nov 1977

The Maine Airport System Plan : Summary Report, Systems Analysis & Research Corp.

Maine Collection

The Maine Airport System Plan : Summary Report

Prepared for Bureau of Planning , Maine Department of Transportation by Systems Analysis & Research Corporation and Howard Needles Tammen & Bergendoff, November 1977.

Contents: Foreword / Overview / Background / Aviation in Maine / Preparation of the Plan / The Plan / Implementation of the Plan / Appendix A - Airport Needs by County / Appendix B - Airport Classifications / Appendix C - Maine's Airports by Map Code Identifier / Appendix D - Technical Supplement Table of Contents / Appendix E - Regional Planning Commissions / Appendix F - Advisory …


The Proposed Eastern Nebraska International Airport Plan, George T. C. Peng, Joseph H. Bain Jan 1970

The Proposed Eastern Nebraska International Airport Plan, George T. C. Peng, Joseph H. Bain

Nebraskiana Publications: Resources and Materials on the 37th State

Excerpt from the prologue:

Passenger growth has led to expansion of facilities at both the Omaha and Lincoln airports; but like many others in the nation, they are rapidly becoming congested. The Federal Aviation Administration, the State Government officials, and many civic leaders in Nebraska are now becoming aware of the need for establishing a regional airport for the Eastern Nebraska region in order to promote and handle international air transportation for the future. People are also beginning to think of such a modern airport as an essential factor in bringing new industries to Nebraska and in shaping the urbanization …