Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

1993

Discipline
Institution
Keyword
Publication
Publication Type

Articles 631 - 660 of 1343

Full-Text Articles in Engineering

Macrozonation Of Landslides For The Manjil, Iran 1990 Earthquake, M. Zaré Jun 1993

Macrozonation Of Landslides For The Manjil, Iran 1990 Earthquake, M. Zaré

International Conference on Case Histories in Geotechnical Engineering

The macrozonation and classification studies are carried out for the induced landslides in the imprinted area of the Manjil, Iran earthquake of 20 June 1990, in view point of engineering geology. The earthquake induced landslides are classified in 7 classes and all of them are mapped on the seismotectonic map of the region. Landslides of the historic time are considered as well. These studies showed that the most of large earthquake induced landslides are occurred within the earthquake origin zone of this earthquake and in the area which is specified with the earthquake intensity of more than VII (7) MSK. …


Numerical Estimate Of Tangshan Earthquake Damage, H. Y. Loo Jun 1993

Numerical Estimate Of Tangshan Earthquake Damage, H. Y. Loo

International Conference on Case Histories in Geotechnical Engineering

The initial stress is first calculated quasi-statically under various loading conditions by using 3-dimenaional finite element model with double nodes to simulate the locked Tangsban fault. Once the shear stress at the front of fault tip reaches rupture criterion, the accumulated stress is suddenly released accompanying with frictional slip along the fault plane, the new state of stress imposed during faulting is re-calculated by reducing the shearing resistance of the hypocenter with the same boundary condition. Then the stress difference before and during shock is regarded as the driving force to generate ground motion. Numerical results show that both the …


Seismic Qualification Of Mechanical Systems, A. K. Singh, K. G. Bhatia Jun 1993

Seismic Qualification Of Mechanical Systems, A. K. Singh, K. G. Bhatia

International Conference on Case Histories in Geotechnical Engineering

Seismic qualification of large and complex mechanical systems is a tedious task in itself. It not only involves high computational cost, but also becomes cost ineffective in case repeated runs are required from safety considerations. Seismic analysis of one bank of Main PHT System of a typical Nuclear Power Plant has been attempted. Besides analysing the complete system, an attempt has also been made to divide the complete system into logical subsystems and analyse the same for the prescribed seismic loads. The results thus obtained have been compared with those of the complete system and a fairly good degree of …


Comments Upon An Earth Dam Severely Damaged By Foundation Liquefaction, A. Popovici, A. Abdulamit, I. Toma, D. Pascu Jun 1993

Comments Upon An Earth Dam Severely Damaged By Foundation Liquefaction, A. Popovici, A. Abdulamit, I. Toma, D. Pascu

International Conference on Case Histories in Geotechnical Engineering

The damage of the Draganesti earth dam on lower sector of the Olt river due to foundation liquefaction during 30th May 1990, 0.12 g in site maximum acceleration, Vrancea earthquake is described. The dam is up to 20 m maximum height and border cross-wise and laterally the reservoir with 12.6 km length of the low head hydroelectric power station. The damage consisting of a large slide with about 60 m length at the dam downstream face and some cracks and lift-up of the reinforced concrete slabs at the corresponding upstream toe zone was placed in a zone where any special …


Effects On High Plasticity Clay Deposits On Site Ground Amplification, John M. Ferritto Jun 1993

Effects On High Plasticity Clay Deposits On Site Ground Amplification, John M. Ferritto

International Conference on Case Histories in Geotechnical Engineering

This paper reviews the effects of the Lorna Prieta earthquake on Treasure Island and discusses previous studies of site ground motion amplification. An independent study was performed in which it is shown that the site amplification is attributable to the presence of the Bay Mud deposits, a high plasticity silty clay that exhibits higher than normal shear modulus with cyclic strain. There is a similarity with the Mexico City clay deposits in both high plasticity and site amplification. Engineers should be alert to high plasticity clay deposits as a potential source of ground motion amplification.


Discussions And Replies Session 3, Ming-Hung Chen, R. C. Chaney, Wade E. Cooper, John Ferritto, A. Popovici, Shigeru Tani, M. K. Yegian, V. G. Ghahraman, T. P. Stoutjesdijk Jun 1993

Discussions And Replies Session 3, Ming-Hung Chen, R. C. Chaney, Wade E. Cooper, John Ferritto, A. Popovici, Shigeru Tani, M. K. Yegian, V. G. Ghahraman, T. P. Stoutjesdijk

International Conference on Case Histories in Geotechnical Engineering

No abstract provided.


Correlation Of Foundation Vibration Results, R. A. Slabbaert, J. P. Lee, J. A. Bohinsky Jun 1993

Correlation Of Foundation Vibration Results, R. A. Slabbaert, J. P. Lee, J. A. Bohinsky

International Conference on Case Histories in Geotechnical Engineering

The vibration a paper machine generates during normal operation presents a complicated challenge to engineers of paper machine support structures. The modeling and the analysis procedure inevitably involves many simplifications and assumptions. Therefore, a comparison of the calculated and the measured results is very helpful in assessing the validity of the overall approach. This paper discusses correlation of calculated paper machine vibration with actual field measurements for a specific paper machine installation. A force-response analysis was performed using a commonly accepted industry practice which is generally considered to be conservative in several areas. Subsequently, field vibration measurements were made. The …


Discussions And Replies Session 4, M. R. Svinkin, G. M. S. Manyando, M. R. Lewis, J. R. Davie, X. J. Yang, G. Y. Gao Jun 1993

Discussions And Replies Session 4, M. R. Svinkin, G. M. S. Manyando, M. R. Lewis, J. R. Davie, X. J. Yang, G. Y. Gao

International Conference on Case Histories in Geotechnical Engineering

No abstract provided.


Measurements Of Seismic Road Vibrations, L. T. Long Jun 1993

Measurements Of Seismic Road Vibrations, L. T. Long

International Conference on Case Histories in Geotechnical Engineering

Vibrations from vehicles on adjacent roads can impact sensitive instruments or structures with historic significance. The amplitudes of vibrations (A) from steady traffic in Atlanta, Georgia, were found to decay with distance (r) according to the relation Log[A(mm/s) ]=0.9-1.25Log(r(m)]. Intervening topographic relief reduces the level of vibration. Using this relation, the impact of a proposed highway was estimated to cause an 8 percent degradation in photographic images with telescope. A topographic barrier could reduce, but would not eliminate the impact of highway vibration. In a second application, a freeway access ramp was originally planned close enough for the vibrations from …


Vibrations Due To Pile Driving, M. R. Lewis, J. R. Davie Jun 1993

Vibrations Due To Pile Driving, M. R. Lewis, J. R. Davie

International Conference on Case Histories in Geotechnical Engineering

Vibrations due to pile installation have long been a concern to owners, contractors, and engineers. Specifically, what levels of vibrations can be assumed for a given pile, hammer, and subsurface conditions and how can these levels be predicted in advance of construction so an assessment of nearby structures can be made? This paper presents the results of vibration monitoring at several sites where various piles and pile hammers have been used, and recommends a conservative method of predicting peak particle velocity at the ground surface near pile installations. Where sensitive structures are involved, a response spectrum analysis is recommended.


Dynamic Response Of Block Foundations, Vijay K. Puri, Braja M. Das Jun 1993

Dynamic Response Of Block Foundations, Vijay K. Puri, Braja M. Das

International Conference on Case Histories in Geotechnical Engineering

This paper presents the results of comparison of the computed and observed response of two block foundations made of concrete. The test blocks measuring 3.0m x 1.5m x 0.7m and 1.5m x 0.75m x

0.70m were cast on level ground. The blocks were excited into vertical vibrations using a speed controlled mechanical oscillator. The amplitudes of vibration at different frequencies of excitation were measured in each case using acceleration transducers mounted on appropriate faces of the block. Dynamic shear modulus at this site was also determined b¥ conducting in-situ tests namely the wave propagation test, the cyclic plate load test, …


Dynamic Compaction Test On An Hydraulic Silty Sand Fill, G. Varosio, P. Grimaldi, G. Canepa Jun 1993

Dynamic Compaction Test On An Hydraulic Silty Sand Fill, G. Varosio, P. Grimaldi, G. Canepa

International Conference on Case Histories in Geotechnical Engineering

Dynamic compaction resulted to be the most effective method to compact a very loose hydraulic silty sand fill, with a fine content from 25 to 90 per cent. Two levels of compaction energy were tested. The soil settlements enforced by these energies were verified with reference to the concept of saturation energy and by means of a simplified analysis of the physical model.


General Report Session No. 4: Case Histories Man-Made Vibrations, Vijay K. Puri, James P. Lee Jun 1993

General Report Session No. 4: Case Histories Man-Made Vibrations, Vijay K. Puri, James P. Lee

International Conference on Case Histories in Geotechnical Engineering

No abstract provided.


An Unsuccessful Urban Deep Excavation In Soft Soils, Richard Rodgers, Michael Majchrzak Jun 1993

An Unsuccessful Urban Deep Excavation In Soft Soils, Richard Rodgers, Michael Majchrzak

International Conference on Case Histories in Geotechnical Engineering

This case history presents, from a geotechnical engineer's viewpoint, various technical, budgetary, coordination, staffing and "hidden agenda" issues that contributed to poor performance of a shored deep excavation 10 soft soils. The anticipated and actual construction procedures are discussed and compared. In addition, approaches to stabilize significant movements of the shoring, and the methodology needed to justify a satisfactory future performance of a pile foundation system that was speculated to be damaged are discussed. By highlighting these issues, it is hoped geotechnical engineers will anticipate and better deal with the issues under their influence, understand issues over which they may …


General Report On Session No. 5: Case Histories Of Retaining Structures And Deep Excavations, John T. Christian, Çetin Soydemir, Alan J. Lutenegger Jun 1993

General Report On Session No. 5: Case Histories Of Retaining Structures And Deep Excavations, John T. Christian, Çetin Soydemir, Alan J. Lutenegger

International Conference on Case Histories in Geotechnical Engineering

No abstract provided.


A Case History Of The Collapse Accident Of A Temporary Earth Support Structure, Noriyuki Horii, Shigeo Hanayasu, Yasuo Toyosawa, Satoshi Tamate, Takakazu Maruyasu Jun 1993

A Case History Of The Collapse Accident Of A Temporary Earth Support Structure, Noriyuki Horii, Shigeo Hanayasu, Yasuo Toyosawa, Satoshi Tamate, Takakazu Maruyasu

International Conference on Case Histories in Geotechnical Engineering

This paper presents a case study on the collapse accident of a temporary earth support structure. The examination of the design plans and investigations of the construction site where the accident occurred bas been carried out to throw light on the accident situations. Some causes of the accident occurrence which have been derived from these examinations and countermeasures for prevention of these types of accidents are discussed.


Cut And Cover At Landrückentunnel North, R. Pöttler Jun 1993

Cut And Cover At Landrückentunnel North, R. Pöttler

International Conference on Case Histories in Geotechnical Engineering

The paper deals with a tunnel structure which has been designed in a very economic way, taking account of best estimate ground parameters and high sophisticated numerical models for simulating the reinforced concrete behaviour. Some changes were made during construction of the tunnel, to speed up the construction procedure. During the backfill of the tunnel higher displacements than calculated occurred.


Discussions And Replies Session 5, Shamsher Prakash, J. N. Gómez, Eyjolfur Arni Rafnsson, Roy E. Olson Jun 1993

Discussions And Replies Session 5, Shamsher Prakash, J. N. Gómez, Eyjolfur Arni Rafnsson, Roy E. Olson

International Conference on Case Histories in Geotechnical Engineering

No abstract provided.


Earth Pressures On Walls Of A Deep Excavation, Z. C. Moh, R. N. Hwang Jun 1993

Earth Pressures On Walls Of A Deep Excavation, Z. C. Moh, R. N. Hwang

International Conference on Case Histories in Geotechnical Engineering

This paper reports recorded earthpressures acting on diaphragm walls during a deep excavation carried out in a soft ground and discusses factors affecting the readings. The main theme of the paper is on wall friction and its influence on vertical earthpressures. It can be demonstrated that the assumption normally adopted in the design of the retaining structures for braced excavations that the vertical earthpressures equal to the overburden pressures could be erroneous. As a result, the vertical pressures on the active side are often over- estimated and those on the passive side under-estimated. In conclusion, it is appropriate for soft …


Failure Of A Large Circular Excavation, R. E. Olson, R. E. Heuer Jun 1993

Failure Of A Large Circular Excavation, R. E. Olson, R. E. Heuer

International Conference on Case Histories in Geotechnical Engineering

A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experienced engineering firm and construction was performed by an experienced contractor. Nevertheless, the excavation support system suffered a complete collapse long before the maximum depth was reached. The failure is described and its causes are discussed.


Failure Of A Twenty-Foot High Retaining Wall, R. E. Olson Jun 1993

Failure Of A Twenty-Foot High Retaining Wall, R. E. Olson

International Conference on Case Histories in Geotechnical Engineering

A cantilever retaining wall, designed in apparent accord with provisions in a civil engineering handbook, failed soon after construction. Analyses of the causes of the failure are presented.


Failure Of Sewerage Mains Constructed In Soft Estuarine Deposit, M. M. Rahimi, C. Karwaj, P. K. Deb Jun 1993

Failure Of Sewerage Mains Constructed In Soft Estuarine Deposit, M. M. Rahimi, C. Karwaj, P. K. Deb

International Conference on Case Histories in Geotechnical Engineering

Rising and effluent mains of 600 mm and 750 mm diameter were constructed at two adjacent creek crossings in New South Wales, Australia. A bund wall was constructed across each creek and the mains were laid in a trench excavated through the bund wall into the underlying soft deposit. Foundation preparation consisted of pouring rockfill into the trench and compacting with a few strikes of the excavator bucket. After construction unacceptably large joint openings of up to 120 mm in width were measured. The authors were engaged to undertake a review of the geotechnical characteristics of the crossings and comment …


Geotechnical Performance Of A Tunnel In Soft Ground, A. B. Parreira, R. F. Azevedo Jun 1993

Geotechnical Performance Of A Tunnel In Soft Ground, A. B. Parreira, R. F. Azevedo

International Conference on Case Histories in Geotechnical Engineering

The analysis of a tunnel section excavated through soft ground is presented. The tunnel construction was monitored and its behavior is compared with results obtained by a numerical simulation. The field instrumentation and the geotechnical properties of the site are presented and the modeling of the soil behavior using Lade's model discussed.


Large Excavation Behavior At Petacalco, Mexico, G. Castellanos, S. Sedano Jun 1993

Large Excavation Behavior At Petacalco, Mexico, G. Castellanos, S. Sedano

International Conference on Case Histories in Geotechnical Engineering

The pumping sump for the Petacalco, Gro. Power Plant required for its construction an excavation 100 x 87 m plan and 11 m depth. The calculated flow towards the excavation was 370 l/s. Two perimetral systems were proposed to control the inflow water: Cut-off wall or conventional pumping system. After a technical-economical analysis, the first one was selected. Due to construction delays of the cut-off wall and program construction demands, the excavation began simultaneously and advanced faster than the wall. The observed inflow water was ten times lesser than the predicted one, so that the construction of the wall was …


Measurements And Predictions On The Elkhart Greek Culvert, P. M. Byrne, T. Srithar, C. B. Kern Jun 1993

Measurements And Predictions On The Elkhart Greek Culvert, P. M. Byrne, T. Srithar, C. B. Kern

International Conference on Case Histories in Geotechnical Engineering

This paper describes field measurements and analysis carried out on the Elkhart Creek soil arch culvert structure in British Columbia, Canada. The structure has a span of 13.4 m, a rise of 7.3 m, and a soil cover of 9.6 m. The original structure collapsed during backfilling in October 1987. A new structure of the same design was built in the Fall of 1989, and because of controversy regarding the design thrust value, it was instrumented to measure thrust, moment, and displacements in the arch. Displacements and stresses in the soil were also measured. The measured thrust values were much …


Performance Of A Braced Excavation In Siltstone, Wolfgang Roth, Anthony Stirbys, Corbin De Rubertis, Richard Ellis Jun 1993

Performance Of A Braced Excavation In Siltstone, Wolfgang Roth, Anthony Stirbys, Corbin De Rubertis, Richard Ellis

International Conference on Case Histories in Geotechnical Engineering

A case history and analysis are presented of a 76-foot deep braced excavation in competent silt- and claystone formations. Soldier piles and lagging were supported by three levels of struts above three levels of tie-backs. During construction, measured strut loads exceeded design levels by up to 100 percent, and additional struts were installed in the upper portion of the excavation. Back analysis performed after construction indicated that large horizontal insitu stresses (Ko= 1) in the region had contributed to the overloading. It was also shown that the problem had been compounded by the practice of pre loading the …


Prediction Of Structural Slurry Wall Behavior, Mark Tamaro, Pablo Lopez, Sibel Pamukcu Jun 1993

Prediction Of Structural Slurry Wall Behavior, Mark Tamaro, Pablo Lopez, Sibel Pamukcu

International Conference on Case Histories in Geotechnical Engineering

The following study was undertaken with the intent of improving the ability to accurately predict the behavior of structural slurry walls. An existing wall, employed during the construction of the Washington D.C. subway system, was examined using four different analysis methods. The actual stresses and displacements of this wall were measured, providing a basis for investigating the accuracy of the different analysis techniques. The results obtained warrant the use of one particular approach, referred to in this study as the "Beam on Elastic Foundation Method". This method provided the most useful simulation of the soil/structure interaction that occurred during construction …


Reinforced Earth® Wall Supported By An Unstable Foundation, T. Schick, S. R. Neely, A. A. Joseph Jun 1993

Reinforced Earth® Wall Supported By An Unstable Foundation, T. Schick, S. R. Neely, A. A. Joseph

International Conference on Case Histories in Geotechnical Engineering

This paper updates a paper presented in 1987 at a meeting of the Texas section of the American Society of Civil Engineers. The 15-foot high, Reinforced Earth® Wall was constructed in 1981 to remediate slope instability at a site underlain by clay/concrete rubble fill to a depth of approximately 24 feet below the top of the wall. Additional data are presented on vertical and horizontal movements measured along the middle portion of the 350-foot long wall which has exhibited the most movements.


Performance Of Earth Retention System, St. Louis Data Center, Thomas L. Cooling, Marty C. Hagerty Jun 1993

Performance Of Earth Retention System, St. Louis Data Center, Thomas L. Cooling, Marty C. Hagerty

International Conference on Case Histories in Geotechnical Engineering

The design and performance of the earth retention system for a 35 ft deep excavation in medium clay is described. The earth retention system consisted of soldier piles and lagging with tieback anchors. One level of tiebacks included helical anchors installed in loose to medium dense sand. Behavior of the helical anchors in contrast to conventional drilled-in anchors is discussed.


Measured Behavior Of A Deep Excavation In Weathered Rock, M. T. Mcrae, S. S. Kishnani, J. C. Burton Jun 1993

Measured Behavior Of A Deep Excavation In Weathered Rock, M. T. Mcrae, S. S. Kishnani, J. C. Burton

International Conference on Case Histories in Geotechnical Engineering

An instrumented deep excavation in weathered rock adjacent to a deflection-sensitive historical building is described. Two permanent shoring systems were used, presenting an opportunity to measure and compare their behaviors. Adjacent to the historic structure, a tied-back drilled pier wall was used, while the remainder of the excavation was supported by a tied-back shotcrete wall constructed in top-down fashion. Instrumentation included inclinometers, tiltmeters, and tieback load cells, supplemented by optical surveys. Both support systems performed well, with movements within acceptable ranges. The maximum horizontal deflection of the drilled piers was 0.33 inch (8 mm), one-third to one-fifth that of the …