A Machine Learning Framework For Predicting Fabrication Hours For Industrial Steel Structure Projects,
2024
American University in Cairo
A Machine Learning Framework For Predicting Fabrication Hours For Industrial Steel Structure Projects, Dalia Ibrahim
Theses and Dissertations
Construction projects are considered high risk projects especially due to their required large capital making them require extreme attention in estimation as overestimating a project will lead to losing bids and underestimating them will lead to incurring more costs than budgeted resulting in losses. However, estimators are often faced with very tight timelines to finish their estimates leading them to primarily rely on their experience disregarding some crucial factors resulting in inaccurate estimates. In the steel structures industry, the steel fabrication phase accounts for 30 to 40% of the overall project cost; in addition, the steel industry is labor driven; …
Exploring The Impact Of Artificial Intelligence On Project Management Across The Manufacturing, Technology, And Construction Industries,
2024
Harrisburg University of Science and Technology
Exploring The Impact Of Artificial Intelligence On Project Management Across The Manufacturing, Technology, And Construction Industries, Susie Diaz Ferrera
Harrisburg University Dissertations and Theses
This study explores the impact of Artificial Intelligence (AI) on project management across the manufacturing, technology, and construction industries. The research focuses on understanding the benefits, challenges, and long-term implications of AI utilization in these sectors. Key findings indicate that 46% of participants use AI mainly for task automation and enhancing functions like brainstorming and communication, which significantly boosts efficiency and team productivity. Despite these benefits, the research identifies several obstacles, including high initial costs, inadequate training, technical issues, and unclear regulatory guidelines. The study addresses four main questions, revealing that AI not only enhances project management processes but also …
Forecasting Future Research Trends In The Construction Engineering And Management Domain Using Machine Learning And Social Network Analysis,
2024
Missouri University of Science and Technology
Forecasting Future Research Trends In The Construction Engineering And Management Domain Using Machine Learning And Social Network Analysis, Gasser G. Ali, Islam H. El-Adaway, Muaz O. Ahmed, Radwa Eissa, Mohamad Abdul Nabi, Tamima Elbashbishy, Ramy Khalef
Civil, Architectural and Environmental Engineering Faculty Research & Creative Works
Construction Engineering and Management (CEM) is a broad domain with publications covering interrelated subdisciplines and considered a key source of knowledge sharing. Previous studies used scientometric methods to assess the current impact of CEM publications; however, there is a need to predict future citations of CEM publications to identify the expected high-impact trends in the future and guide new research efforts. To tackle this gap in the literature, the authors conducted a study using Machine Learning (ML) algorithms and Social Network Analysis (SNA) to predict CEM-related citation metrics. Using a dataset of 93,868 publications, the authors trained and tested two …
Ace Mentor Program - Central Coast Chapter,
2024
California Polytechnic State University, San Luis Obispo
Ace Mentor Program - Central Coast Chapter, Brayden Samuel Groshart
Construction Management
For my senior project, I established a chapter of the ACE (Architecture, Construction, and Engineering) Mentor Program in San Luis Obispo, California. This program provides high school students with hands-on experience and exposure to careers in the architecture, construction, and engineering industries. The program spanned eight weeks, balancing theoretical knowledge and practical application. The curriculum began with sessions on the fundamentals of architecture, engineering, and construction. In order to expose the students to real world practices, we organized tours of an architecture firm, an engineering firm, and an active construction site. These visits allowed students to engage with professionals, observe …
Slo Water Treatment Facility Grill Retrofit,
2024
California Polytechnic State University, San Luis Obispo
Slo Water Treatment Facility Grill Retrofit, Liam Dolan
Construction Management
The San Luis Obispo Water Treatment Facility is a vital facility that provides water to all of San Luis Obispo. The facility runs twenty-four hours a day and constantly has long shifts for those who work there. The water treatment facility has a small, rusted Santa Maria grill that is rarely used because of its condition, and they were in need of a new grill that employees could use to make lunches. The water treatment facility has plans to build an outdoor dining space for employees, and my goal for this retrofitted grill project is to help enhance that space …
Construction Of Concrete Shear Wall & Modular Foundations - Procurement And Quality Control,
2024
California Polytechnic State University, San Luis Obispo
Construction Of Concrete Shear Wall & Modular Foundations - Procurement And Quality Control, Justin J. Coffin
Construction Management
This project details the planning, construction, quality control, and logistics processes throughout the construction of a concrete shear wall and modular footings. The project focused on constructing the wall and footings as they were designed to ensure they meet strength parameters to be used in the High Bay Lab at California Polytechnic State University in San Luis Obispo for seismic testing. The complex designs, encompassing dense rebar gages and post tensioned bars, required extensive hours of labor and quality control. This paper will cover the main phases of the construction process and how they were acquired. Furthermore, the considerations taken …
Construction Of Lightly Reinforced Concrete Shear Wall And Footings,
2024
California Polytechnic State University, San Luis Obispo
Construction Of Lightly Reinforced Concrete Shear Wall And Footings, Luke Jackson Method
Construction Management
This paper details the construction of two cast in place foundations as well as a lightly reinforced cast in place wall. The project, located inside the high bay, provides the Architectural Engineering (ARCE) department with an opportunity to test Fiber Reinforced Polymer wrap as a retrofitting option for walls dating back to pre-1980s. Due to site conditions, and project design, this project required extensive planning and communication within our team, faculty advisors, and shop technicians. This paper will discuss the phasing of construction and procurement of material that was required for the completion of this project. It also aims to …
Resources To Support Adu Construction,
2024
California Polytechnic State University, San Luis Obispo
Resources To Support Adu Construction, Eleanor Rheingans
Construction Management
This survey examines whether cities with a higher number of online resources will result in a higher proportion of ADU permits and a lower wait time for approval. Some cities have offered online resources directly related to the ADU permitting and construction process. The seven online resources were selected based on interviews with developers. Data used is from 2018 to 2023. Other factors seem to affect the number of permits issued more than resources the cities post for public access. While developers do want the resources cities are currently offering, there are some gaps, particularly records of past permit costs …
Designing, Estimating, And Building A Deck And Overhang For The Paso Robles Police Department Shooting Range,
2024
California Polytechnic State University, San Luis Obispo
Designing, Estimating, And Building A Deck And Overhang For The Paso Robles Police Department Shooting Range, Nicklaus Amil Zenner, Benjamin Henry Gallagher
Construction Management
This paper covers the design, estimating, and construction process by a team of students from Cal Poly to provide a deck and overhang for the Paso Robles Police Department Shooting Range. The project, initiated in the winter of 2024, aimed to provide a durable, functional, and aesthetically pleasing deck and overhang suitable for a barbecue and lounge area. The paper focuses on the design and estimation phases, as well as material procurement and construction. Through meetings with the client, the team developed a design that met the police department's criteria for functionality, durability, and cost. The design process involved collaboration …
Skip The Grid: Navajo Nation Solar Power Project,
2024
California Polytechnic State University, San Luis Obispo
Skip The Grid: Navajo Nation Solar Power Project, Nathan Kealy Haub
Construction Management
Skip the Grid, an initiative aimed at empowering communities in need was brought to life through the collaborative efforts of California Polytechnic State University San Luis Obispo (Cal Poly) students, industry partners like SOLV Energy, and the educational non-profit organization Heart of America (HOA). This project was a true testament to the power of teamwork and innovation. Our mission was to assist families of school-aged children in the Navajo Nation by providing them with solar energy systems, including batteries and lighting. We aimed to create a lasting impact by equipping these families with essential resources. In addition, we integrated educational …
San Luis Obispo High School Ffa Barn Demolition: Disposal Of Material,
2024
California Polytechnic State University, San Luis Obispo
San Luis Obispo High School Ffa Barn Demolition: Disposal Of Material, Jake B. Schulman
Construction Management
San Luis Obispo High School’s FFA program needed to upgrade its deteriorating pig barn, involving three key scopes of work: demolition of the existing structure, proper disposal of materials, and reconfiguration of pig pens and water lines. This project required skills in demolition, framing, and plumbing, all of which our team learned during construction management courses at Cal Poly. The demolition entailed the complete removal of a barn with metal roof panels, wood trusses, joists, studs, and plywood sheathing. Proper disposal of these materials was crucial and will be detailed in this paper, with a brief discussion on demolition and …
Recycled And Waste Glass As A Sustainable Substitute For Aggregates And Cement In Concrete,
2024
California Polytechnic State University, San Luis Obispo
Recycled And Waste Glass As A Sustainable Substitute For Aggregates And Cement In Concrete, Griffin Powers Finnane
Construction Management
Besides water, concrete is the most widely used material in the world. The production of Portland cement, the most crucial ingredient in a concrete mix, significantly contributes to global carbon dioxide emissions, accounting for 7-8% of the total. The majority of these emissions result from the cement production process, which involves kilns powered by greenhouse gas-producing sources. Additional emissions come from the heavy diesel equipment used to load and haul aggregates to batch plants. Although the construction industry is adopting more sustainable building techniques and materials, the basic concrete mix remains largely unchanged, continuing to contribute heavily to carbon emissions. …
Iron Filings Impact On The Compressive Strength Of Concrete,
2024
California Polytechnic State University, San Luis Obispo
Iron Filings Impact On The Compressive Strength Of Concrete, Dominic Daniel Aceves
Construction Management
In this study, compression tests were performed on three different mix designs of concrete to evaluate the effects of iron filings as an admixture to concrete. The first mix design served as the control mix, being the variable that the other two mixes will be based off. The second mix design was the same as the first mix design, but with an added 12 ounces of iron filings. The third mix design was, again, the same as the first mix design, but with an added 24 ounces of iron filings doubling that of the second mix design. The objective of …
Exploring The Role Of Construction Technology Copilots,
2024
California Polytechnic State University, San Luis Obispo
Exploring The Role Of Construction Technology Copilots, James S. Thielmann Jr.
Construction Management
In the rapidly evolving construction industry, the adoption of software solutions is essential for enhancing efficiency, reducing costs, and ensuring timely project delivery. This paper assesses the effectiveness and usefulness of existing construction software solutions, focusing on their functionalities, strengths, and limitations. Among the prominent solutions gaining traction are Trunk.Tools, Constructable.ai, and ProjectEngineer.ai. The construction industry, although historically slower to adopt new technologies, stands to gain a great deal from these tools in terms of project management and performance. This research includes a thorough examination of ProjectEngineer.ai's reach in the market, feature development, and growing uptake among experts in the …
Moringa Connect: Design And Fabrication Of The Drum For A Moringa Leaf Dryer Prototype,
2024
California Polytechnic State University, San Luis Obispo
Moringa Connect: Design And Fabrication Of The Drum For A Moringa Leaf Dryer Prototype, Braden Deck
Construction Management
Moringa Connect, founded in 2013 by MIT alumnus Kwami Williams, supports over 5,000 African farmers, primarily in Ghana, by providing a direct sales, manufacturing, and shipping platform for nutrient-dense moringa leaves. Despite significant social and economic benefits for the local farmers, the current drying process in Accra, Ghana, is inefficient, requiring extensive human handling. To address this, a team of five Cal Poly students partnered with Moringa Connect to design a prototype rotating hopper to streamline the drying process and reduce production costs. The project faced numerous challenges, including material sourcing constraints in Ghana and the need for extensive fabrication …
Skip The Grid: Delivering Power To The Navajo Nation,
2024
California Polytechnic State University, San Luis Obispo
Skip The Grid: Delivering Power To The Navajo Nation, William Jacob Bellios
Construction Management
Skip the Grid is a groundbreaking initiative designed to bring sustainable, off-grid power solutions to isolated communities facing significant challenges, such as the Navajo Nation. This collaborative effort involved an interdisciplinary team of California Polytechnic State University, San Luis Obispo (Cal Poly) SOLV Energy, and Heart of America (HOA). Due to the vast and dispersed nature of the reservation, a historical lack of government investment, and the severe impact of COVID-19 on the community, many homes are without electricity. This project aimed to address these issues by installing Goal Zero solar panels, battery systems, and lighting in 24 homes of …
Gateway Decathlon: Carbon Calculations Of An Offsite Residential Construction,
2024
California Polytechnic State University, San Luis Obispo
Gateway Decathlon: Carbon Calculations Of An Offsite Residential Construction, Isaac Robert Rubio
Construction Management
This senior project delves into a comprehensive calculation of carbon emissions for both efficiency and sustainability within the realm of modular construction. A material takeoff of the building was performed, allowing for an accurate measurement of materials and their respective EPD (Environmental Product Declaration) values. After material selection, a final carbon calculation of the building was calculated. Carbon emission calculations were performed on the current Revit Model allowing for a full-scale analysis, from Cradle to Gate, of the offsite residential unit. The results show that the total initial embodied carbon emissions of the unit is 9241 (kg-CO2e), representing the total …
Consumption And Waste For Hydrating Workers With Single Use Plastic Bottles,
2024
California Polytechnic State University, San Luis Obispo
Consumption And Waste For Hydrating Workers With Single Use Plastic Bottles, James Colnett
Construction Management
The construction industry significantly contributes to environmental waste, notably through the extensive use of plastic water bottles for hydrating field personnel. This case study investigates the hydration practices of a midsize construction company in the Bay Area, focusing on the volume of plastic waste generated and potential sustainable alternatives. Data were collected via surveys sent to 15 employees, revealing that approximately 130,416 plastic bottles are used annually across 11 project sites. Despite the convenience and compliance with OSHA regulations, the reliance on single-use plastic bottles presents severe environmental and health concerns, such as resource depletion and microplastic pollution. Survey results …
San Luis Obispo High School Ffa Swine Barn Demolition And Enclosure Reconfiguration,
2024
California Polytechnic State University, San Luis Obispo
San Luis Obispo High School Ffa Swine Barn Demolition And Enclosure Reconfiguration, John F. Spurlock
Construction Management
The San Luis Obispo High School (SLOHS) FFA program required an upgrade to its deteriorating swine barn. This project came in three unique scopes of work: demolition of the existing barn, proper disposal of materials, and reconfiguration of the enclosure and water lines. This paper will cover specifically the reconfiguration of the enclosures and the redesign of the watering system. This phase of the project required skills in framing and plumbing, which our team had absorbed during specific construction management courses at Cal Poly. The reconfiguration included framing and securing a long span of fencing along the northern side of …
Exploring Mass Timber And Mitek Posi-Strut System In Modern Construction,
2024
California Polytechnic State University, San Luis Obispo
Exploring Mass Timber And Mitek Posi-Strut System In Modern Construction, Matthew N. Maloney
Construction Management
This study evaluates the performance, cost-effectiveness, and constructability of two different truss systems by constructing identically sized mockup models. The comparison focuses on the top chord POSI-Strut Metal Web System and the bottom chord truss system, both utilizing Boise Cascade LVL engineered lumber. Our findings reveal that the top chord POSI structure truss system is more cost-effective and time-efficient compared to the bottom chord truss system. The top chord system's design reduces material costs and speeds up construction time, making it an attractive option for projects with tight budgets and schedules. However, the top chord POSI-Strut Metal Web System has …