Purdue Ect Report - Fourth Quarter 2016,
2017
Construction Engineering & Management, Purdue University
Purdue Ect Report - Fourth Quarter 2016, Purdue Ect Team
ECT Fact Sheets Archive
Fourth Quarter 2016
This is a quarterly report from the Purdue ECT.
Portable Signals: Indot Design Guidance And Specifications,
2017
INDOT
Portable Signals: Indot Design Guidance And Specifications, Joseph Bruno
Purdue Road School
Until recently portable traffic signals, which are mounted on towable trailer supports, were not allowed in Indiana. However, portable signals have many advantages over fixed temporary signals, so the Indiana Manual on Uniform Traffic Control Devices was revised to allow them, and specifications for their use are now in place. This presentation provides an overview of portable signals, including INDOT’s current design and specification requirements for these devices.
Mash Implementation For Guardrail,
2017
Purdue University
Mash Implementation For Guardrail, Katherine Smutzer
Purdue Road School
A review of the Manual for Assessing Safety Hardware (MASH) Implementation for w-beam guardrail. What will change and what designers need to know when moving to MASH.
Construction Specifications And Special Provisions,
2017
INDOT
Construction Specifications And Special Provisions, Scott Trammell, Melissa Russell
Purdue Road School
The purpose of this presentation is to help project managers and designers prepare the necessary information required for their contracts with regard to the Standard Specifications and any necessary special provisions. Attendees will be exposed to examples of the right way to incorporate a Unique Special Provision, as well as things to avoid and questions to ask. It is important to know the proper way to write and present a Unique Special Provision.
Irish Bim Study 2017,
2017
Technological University Dublin
Irish Bim Study 2017, Barry Mcauley, Alan Hore, Roger West
Articles
The Construction IT Alliance (CitA) recently published its Global BIM Study as part of its BIM Innovation Capability Programme (BICP). The study sought to identify how BIM was being currently addressed in 27 countries across the globe. The study sought to identify the presence of three key ingredients in these countries:
1. Regulatory requirement for BIM
2. Champions driving BIM
3. Noteworthy publications
The report identified a number of recurring themes that would help to shape Ireland’s BIM programme. The report concluded that Ireland should adopt a programme of partnership between industry and the Irish Government in order to affect …
6 Field-Observed Cracking Of Paired Lightweight And Normalweight Concrete Bridge Decks,
2017
Old Dominion University
6 Field-Observed Cracking Of Paired Lightweight And Normalweight Concrete Bridge Decks, Tara L. Cavalline, Jeremy T. Calamusa, Amy M. Kitts, Brett Q. Tempest
Engineering Technology Faculty Publications
Research has suggested that conventional lightweight concrete can offer durability advantages due to reduced cracking tendency. Although a number of publications exist providing the results of laboratory-based studies on the durability performance of lightweight concrete (with lightweight coarse aggregate) and internally cured concrete (using prewetted lightweight fine aggregate), far fewer field studies of durability performance of conventional lightweight concrete bridge decks in service have been performed. This study was commissioned to provide insight to a highway agency on whether enhanced durability performance, and therefore reduced maintenance and longer lifecycles, could be anticipated from existing lightweight concrete bridge decks that were …
An Analysis Of The Benefits In Estimating At Different Pipe Union Labor Rates,
2017
California Polytechnic State University, San Luis Obispo
An Analysis Of The Benefits In Estimating At Different Pipe Union Labor Rates, A.J. Chamorro
Construction Management
This paper is an analysis of the costs and benefits of estimating at different union labor rates, based on the location of the project and which jurisdiction the project falls in. The basis of the research is a case study of a Bay Area mechanical contractor (Contractor X) which previously estimated at a single labor rate, and recently developed variable estimating. Through that case study, best practices are developed for union pipe trade estimating. The results of the case study show that estimating protocol should be determined on a project by project basis, and company resources and manpower have to …
Aei Student Design Competition: Texas Tech Sports Performance Facility,
2017
California Polytechnic State University, San Luis Obispo
Aei Student Design Competition: Texas Tech Sports Performance Facility, Jacob G. Kockrow
Construction Management
The AEI Student Competition is an annual event that pushes students in the disciplines of engineering and construction management to collaborate and demonstrate creative solutions to the challenges presented. This year, the competition is focused on the new Texas Tech Sports Performance Sports Facility located in Lubbock, Texas, where they tore down the existing building and are in the process of completing the new facility. Instead of recreating the plans given, we designed a brand new building to meet the project requirements, which included a $48 million budget and a 34-month construction duration. As the Construction Manager for the project, …
Roman Catholic Elementary Photovoltaic Project,
2017
California Polytechnic State University, San Luis Obispo
Roman Catholic Elementary Photovoltaic Project, Joe Gugale
Construction Management
The use of photovoltaic panels in construction is rapidly growing all around the world. This paper summarizes the findings of a student-based project in Belize that was installed December 2016. The San Pedro Roman Catholic Primary School is the largest school on the island of Ambergris Caye, Belize with over 700 students in 22 classrooms ranging from Kindergarten to 8th grade. Although the school has power supplied from the local electrical utility, power outages occur frequently and the cost of electricity is considerable.
The project had several issues related to preparing the design, acquiring the materials and equipment, and developing …
Implementing A Working Bim Model Halfway Through A Public Cm Multi-Prime Project: A Case Study,
2017
California Polytechnic State University, San Luis Obispo
Implementing A Working Bim Model Halfway Through A Public Cm Multi-Prime Project: A Case Study, Jim Roth
Construction Management
The development of a BIM (building information model) model is a standard practice in today’s construction world. While the process of model adoption nearly has a written formula, implementing a BIM model in the midst of a project is a rare occurrence. This paper will examine the implementation of a working BIM model halfway through a public multiple prime contractor project managed by a construction manager (CM) in California. The project cost is roughly $20 million and of moderate complexity. This paper will outline the factors leading up to the ultimate decision of creating a working model, the process of …
Investigation Into Feasibility Of Off-Grid Small Dwelling In Slo County,
2017
California Polytechnic State University, San Luis Obispo
Investigation Into Feasibility Of Off-Grid Small Dwelling In Slo County, Sam Labberton
Construction Management
The trend towards green, sustainable living has grown more and more in the housing industry each year since before the turn of the century; solar in the last decade alone has grown by 60% (http://www.seia.org/research-resources/solar-industry-data). Living on a grid that runs on unclean sources of energy already has led us into an environmental disaster some call irreversible. This paper takes a detailed look into the feasibility of a small, off-grid, dwelling that utilizes modern technology in order to live more modestly. In conjunction with great advancements in solar technology along with energy storage such as deep cycle lead-acid batteries, on-site …
Tidal Energy And How It Pertains To The Construction Industry,
2017
California Polytechnic State University, San Luis Obispo
Tidal Energy And How It Pertains To The Construction Industry, Armin Latifi
Construction Management
Renewable Energy is on the forefront of many global discussions. The concern of numerous scientific findings on the impact humanity has had on the environment has grown in recent years. Since alternative energy sources, such as solar and wind, have already made substantial progress, I have decided to focus my attention on tidal energy specifically. This topic will serve as the main focus of this essay. Within this essay, I will examine how tidal energy pertains to the construction industry through four distinguished chapters: (1) What kind of tidal technology exist and what does the construction aspect of these tidal …
Case Study: Laborer Safety Training For Small To Mid-Sized General Contractors,
2017
California Polytechnic State University, San Luis Obispo
Case Study: Laborer Safety Training For Small To Mid-Sized General Contractors, Shawn Kuehter
Construction Management
The purpose of this study is to determine a relationship between safety spending and the resulting safety records for small to mid sized construction companies, particularly general contractors, and build on existing safety practices. It will shed light on why safety spending in construction is a very important aspect to include in any company’s budget. A case study of Quiring General, LLC, a small to mid sized general contractor based out of Fresno, CA will be the core of this paper as it includes examples of injuries of laborers and their impact they have. The impact focused on in this …
Photovoltaic System Installation In Belize,
2017
California Polytechnic State University, San Luis Obispo
Photovoltaic System Installation In Belize, Austin J. Stewart
Construction Management
California Polytechnic State University’s National Electrical Contractors Association Student Chapter (NECA) was selected by the ELECTRI Council to take part in its Student Passport Initiative program, through which participants engage in meaningful service-learning experiences in developing communities. The team was tasked with the design and construction of a photovoltaic system for San Pedro Roman Catholic Primary School in San Pedro, Belize, with the purpose of enabling the school to achieve carbon neutrality with respect to utility grid power consumption. The team of five students collaborated primarily with two professors, two alumni, and an accomplished electrical contractor from Belize to perform …
Value Of Prefabrication Of Fire Sprinkler Components In The Fire Sprinkler Industry,
2017
California Polytechnic State University, San Luis Obispo
Value Of Prefabrication Of Fire Sprinkler Components In The Fire Sprinkler Industry, Matt Fisher
Construction Management
Every day the construction industry is looking for new ways to improve time efficiency and project profitability. Companies in the past have tried value engineering and schedule crashing to save time and money. As the industry continues to grow and innovate, new concepts are being applied. Building Information Modeling (BIM) is one of these ideas that has made a large impact in the construction industry. BIM is a digital 3D modeling system that allows the user to create a complete rendering of a construction project complete with mechanical, electrical, and plumbing integrated into the model. With this model a prospective …
Bs News March/April,
2017
Technological University Dublin
A Laboratory Evaluation Of Warm Mix Technology For Use In Asphalt Rubber - Asphaltic Concrete Friction Courses: A Case Study Of Arizona,
2017
Georgia Southern University
A Laboratory Evaluation Of Warm Mix Technology For Use In Asphalt Rubber - Asphaltic Concrete Friction Courses: A Case Study Of Arizona, Michael Myung Jeong, Douglas I. Hanson
The Professional Constructor
The objective of this study was to determine if warm mix additives currently used in Arizona can be added for the production of an Asphalt Rubber - Asphaltic Concrete Friction Course (AR-ACFC) without detrimental effects on performance of the pavement. Three warm mix additives (Evotherm®, Sasobit®, and Advera®) approved by Arizona Department of Transportation were investigated through a laboratory study along with statistical analysis. Three major concerns on performance of an AR-ACFC considered in this study are asphalt draindown, durability, and moisture susceptibility. The laboratory binder test results show there is no clear evidence that the use of Evotherm and …
How U.S. Universities Intend To Meet Their Carbon Neutral Goals,
2017
Clemson University
How U.S. Universities Intend To Meet Their Carbon Neutral Goals, Dennis C. Bausman, Avinash Venugopal
The Professional Constructor
Universities have been on the leading edge for implementation of sustainable practices, green building certification, and the push to limit emission of greenhouse gases. In 2006 leadership at twelve universities was instrumental in the creation of the American College & University Presidents’ Climate Commitment (ACUPCC). The two overall goals of the ACUPCC were to gain university commitment to eliminate greenhouse gas emissions from their campus operations and to promote sustainability education and research. A decade later there are over 650 that have officially pledged their support to the ACUPCC and in doing so have established a goal toward carbon neutrality …
Using Percent Complete Metric To Highlight The Root Causes Of Delays In Home Building Industry,
2017
University of Oklahoma
Using Percent Complete Metric To Highlight The Root Causes Of Delays In Home Building Industry, Somik Ghosh
The Professional Constructor
Based on the prediction of US Housing and Urban Development (US HUD), the demand for new homes will increase in the coming months to accompany the steady sales of existing homes. To meet the future demand, the home building industry has to continuously improve and get rid of inherent problems such as frequent delays. While delays have been a common occurrence in the residential and commercial construction alike, investigations of delays in the residential sector has not received much attention. With the goal of exploring the causes of delays in the home building industry, a multiple case study approach was …
Are We On The Same Jobsite? The Millennial Generation Vs. Construction Industry Employees,
2017
Clemson University
Are We On The Same Jobsite? The Millennial Generation Vs. Construction Industry Employees, Christine Piper, Varahee Madadi
The Professional Constructor
This paper gives an overview of a study conducted in a geographical area of the US to understand the millennial generation’s perception of the workplace of the construction industry. Many organizations face the challenge of integrating diverse generations in a workplace. With the retirement of a large number of Boomers and the current intake of Millennials in the workplace, organizations are facing a challenge to attract and retain the millennial generation. Workplace expectations of the millennial generation and employees are compared with the expectations of the workplace amongst different generations in the construction industry.