A Critical Review Of Pharmaceutical Pollutants In Soil And Air: Ecotoxicological Impacts On Animal, Plant And Microbial Communities - Health Hazards And Waste Management,
2026
The University of Texas Rio Grande Valley
A Critical Review Of Pharmaceutical Pollutants In Soil And Air: Ecotoxicological Impacts On Animal, Plant And Microbial Communities - Health Hazards And Waste Management, Md Faisal Amin, Md. Saydur Rahman
School of Integrative Biological & Chemical Sciences Faculty Publications
Pharmaceutical contamination in soil and air has become a critical environmental concern due to its widespread sources, complex behavior, and long-lasting ecological impacts. This review comprehensively explores the presence, fate, and effects of pharmaceutical compounds in soil, highlighting their entry routes, environmental persistence, and biological consequences. Pharmaceuticals infiltrate terrestrial and aquatic environments through various pathways, including agricultural application, pharmaceutical manufacturing waste, sewage sludge, hospital and household discharges, irrigation with contaminated water, and atmospheric deposition. A wide range of drug classes, such as antibiotics, analgesics, non-steroidal anti-inflammatory drugs, antidepressants, anticancer drugs, and hormones, have been identified in both soil and air …
Restructuring Our Agriculture Industry To Reduce The Eutrophication Of The Great Lakes,
2026
Augustana College, Rock Island Illinois
Restructuring Our Agriculture Industry To Reduce The Eutrophication Of The Great Lakes, Kathryn B. Dunn
Tredway Library Prize for First-Year Research
No abstract provided.
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr),
2026
Environmental Protection Agency
Re: Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026),
2026
Environmental Protection Agency
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated July 31, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026),
2026
Environmental Protection Agency
Re: Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Quarterly Operation And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026 (Dated September 15, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr),
2026
Montana Tech Library
Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026),
2026
Environmental Protection Agency
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Hydraulic Capacity Improvements Interim Operations And Water Management Plan (Dated September 18, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Community-Based Well Testing And Outreach To Mitigate Human Health Risk From Unsafe Drinking Water,
2026
Montana State University, Bozeman Montana, United States
Community-Based Well Testing And Outreach To Mitigate Human Health Risk From Unsafe Drinking Water, W. Adam Sigler, Katharine Sutphen, Margaret J Eggers, Kaleena Miller, Michelle Grocke-Dewey
Journal of Extension
Twenty-two percent of groundwater wells tested nationwide have one or more contaminants above a health threshold, yet many private well owners are unaware of these risks because they have not tested their water. Researchers piloted a community well testing clinic for education/outreach and surveyed participants about outcomes. Two months later, 75% of participants with high or intermediate health risk water quality results had taken action or intended to, indicating that community private well testing clinics can be effective in mitigating human health risks from contaminated drinking water.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon,
2026
Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report,
2026
Montana Tech Library
Draft Final 2024 Unreclaimed Sites Sampling: Ur-44 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur-54 – East Of Main And Gagnon, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
From Innovation To Impact: Evaluation Of The Shape Accelerator Cohort,
2026
W.E. Upjohn Institute for Employment Research
From Innovation To Impact: Evaluation Of The Shape Accelerator Cohort, Iryna V. Lendel, Chloe Wieber
Upjohn Institute Technical Reports
The Solutions Hub for an Alternative Packaging Ecosystem (SHAPE), a Michigan-Ohio partnership operated by the Michigan State University Research Foundation as part of a National Science Foundation Regional Innovation Engine, co-funded a special cohort of the NextCycle Accelerator focused on sustainable packaging and circular economy ventures. This report evaluates how the accelerator contributed to firm-level advancement and ecosystem-level change, drawing on program data and interviews with participating companies, program facilitators, stakeholders, and SHAPE management. Participants most consistently credited coaching, network connections, and the Pitch Showcase with meaningfully impacting their business trajectory, gaining market traction, advancing technology readiness, and gaining access …
Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan,
2026
Montana Tech Library
Draft Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan, Stantec Consulting Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps,
2026
Atlantic Richfield Company
Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
