Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1792)
- University of Nebraska - Lincoln (263)
- University of Nevada, Las Vegas (156)
- Chapman University (80)
- University of Colorado Law School (66)
-
- Kennesaw State University (56)
- University of Louisville (55)
- Department of Primary Industries and Regional Development, Western Australia (34)
- University of New Mexico (34)
- Eastern Kentucky University (33)
- Portland State University (18)
- University of Southern Maine (18)
- Bemidji State University (17)
- Claremont Colleges (13)
- City University of New York (CUNY) (11)
- SIT Graduate Institute/SIT Study Abroad (11)
- Murray State University (10)
- University of Kentucky (10)
- California Polytechnic State University, San Luis Obispo (9)
- University of Dayton (9)
- Wilfrid Laurier University (9)
- Western Kentucky University (8)
- Montclair State University (7)
- Augustana College (6)
- Center for the Blue Economy (6)
- The University of San Francisco (6)
- University of Arkansas, Fayetteville (6)
- University of New England (6)
- Cal Poly Humboldt (5)
- Central Washington University (5)
- Keyword
-
- Priority Soils (384)
- Metals Abatement (228)
- Unreclaimed Sites (145)
- Field Sampling (129)
- Consent Decree (122)
-
- Quality Assurance (121)
- Groundwater (112)
- Insufficiently Reclaimed Sites (100)
- Indoor Dust (75)
- Berkeley Pit (67)
- Water quality (66)
- Soil Sampling (62)
- Environment (60)
- Butte Treatment Lagoon (56)
- Lead (56)
- Stormwater (54)
- Groundwater Monitoring (52)
- Smelter Area (52)
- Blacktail Creek (49)
- Maintenance (49)
- Environmental science (47)
- Surface Water Monitoring (47)
- Arsenic (46)
- Monitoring (46)
- Mercury (44)
- Sustainability (43)
- Pollution (42)
- Climate change (41)
- Envirome (40)
- Maintenance Report (40)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1792)
- Daugherty Water for Food Global Institute: Faculty Publications (109)
- United States Environmental Protection Agency: Publications (97)
- Activities (55)
- Publications (WR) (53)
-
- Sustain Magazine (41)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (40)
- Get Outdoors Nevada (38)
- EKU Faculty and Staff Scholarship (33)
- Water Matters! (32)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (28)
- Limnological Studies (18)
- Water Quality Control: Integrating Beneficial Use and Environmental Protection (Summer Conference, June 1-3) (17)
- Nebraska Department of Environmental Quality: Reports (16)
- Best Practices for Community and Environmental Protection (October 14) (13)
- Department of Environmental Studies: Undergraduate Student Theses (13)
- Nebraska Water Center: Administrative Materials (13)
- UNLV Theses, Dissertations, Professional Papers, and Capstones (13)
- Electronic Theses and Dissertations (12)
- Journal of Earth and Life Science (12)
- Maine Collection (12)
- Best Management Practices (BMPs): What? How? And Why? (May 26) (11)
- The Climate of Environmental Justice: Taking Stock (March 16-17) (11)
- Biosecurity factsheets (10)
- Environmental Science and Management Professional Master's Project Reports (9)
- Faculty and Staff Scholarship (9)
- Independent Study Project (ISP) Collection (9)
- Theses (9)
- Physics Faculty Publications (8)
- Department of Earth and Environmental Studies Faculty Scholarship and Creative Works (7)
- Publication Type
- File Type
Articles 31 - 60 of 2946
Full-Text Articles in Environmental Monitoring
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee
Institute for ECHO Articles and Research
The increasing frequency of wildfires under a changing climate has led to extensive ecosystem destruction, highlighting the need for reliable burned area assessment using satellite imagery. Single-satellite data are constrained by observation gaps and interference from smoke and clouds, whereas multi-satellite data fusion can mitigate these limitations. Nonetheless, the fusion techniques still encounter challenges such as spatial information loss from resolution differences and cross-satellite domain mismatch. This study presents a burned area mapping framework that integrates super-resolution (SR) with transfer learning to address spatial and domain gaps in multi-satellite data. Specifically, Landsat-8 imagery is super-resolved to 7.5 m resolution, and …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 16, 2023, at the Butte Reclamation Evaluation System (BRES) No. 31 – Waste Dump #5 Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established …
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on August 12, 2022, at the IR source area Butte Reclamation Evaluation System (BRES) No. 16 – Curry Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) required further evaluation of this IR Site since reclamation was conducted in 1991, prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (EPA, 2020) and because the Site did not meet BRES requirements during the 2017 assessment performed by the Clark Fork Watershed …
Re: Approval Letter For The Diggings East 100% Remedial Design Package Submittal (Dated July 23, 2026), The 100% Sbcca Programmatic Technical Specifications Submittal (Technical Specifications) (Dated May 29, 2026), The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated July 29, 2026), The Final Sbcca Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated July 29, 2026), And The Final Sbcca Materials Management Plan (Mmp) (Dated July 29, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee
Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee
Discovery Day - Daytona Beach
Light pollution is an increasingly urgent environmental and public safety concern that affects energy costs, astronomical research, ecological systems, human health, and aviation. At Embry-Riddle Aeronautical University (ERAU), artificial lighting from campus infrastructure and adjacent airport operations contributes to elevated skyglow, limiting the performance of the university’s 1-meter telescope and degrading the nighttime environment. This project seeks to quantitatively map and analyze light pollution across the ERAU Daytona Beach campus using custom-built Sky Quality Meters (SQMs) integrated with environmental sensors and mounted on an unmanned aerial system (UAS). By collecting calibrated sky brightness measurements at multiple altitudes and geospatial coordinates, …
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr) (Dated June 26, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2026 (Dated June 26, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.
Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.