Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1792)
- University of Nebraska - Lincoln (263)
- University of Nevada, Las Vegas (156)
- Chapman University (80)
- University of Colorado Law School (66)
-
- Kennesaw State University (56)
- University of Louisville (55)
- Department of Primary Industries and Regional Development, Western Australia (34)
- University of New Mexico (34)
- Eastern Kentucky University (33)
- Portland State University (18)
- University of Southern Maine (18)
- Bemidji State University (17)
- Claremont Colleges (13)
- City University of New York (CUNY) (11)
- SIT Graduate Institute/SIT Study Abroad (11)
- Murray State University (10)
- University of Kentucky (10)
- California Polytechnic State University, San Luis Obispo (9)
- University of Dayton (9)
- Wilfrid Laurier University (9)
- Western Kentucky University (8)
- Montclair State University (7)
- Augustana College (6)
- Center for the Blue Economy (6)
- The University of San Francisco (6)
- University of Arkansas, Fayetteville (6)
- University of New England (6)
- Cal Poly Humboldt (5)
- Central Washington University (5)
- Keyword
-
- Priority Soils (384)
- Metals Abatement (228)
- Unreclaimed Sites (145)
- Field Sampling (129)
- Consent Decree (122)
-
- Quality Assurance (121)
- Groundwater (112)
- Insufficiently Reclaimed Sites (100)
- Indoor Dust (75)
- Berkeley Pit (67)
- Water quality (66)
- Soil Sampling (62)
- Environment (60)
- Butte Treatment Lagoon (56)
- Lead (56)
- Stormwater (54)
- Groundwater Monitoring (52)
- Smelter Area (52)
- Blacktail Creek (49)
- Maintenance (49)
- Environmental science (47)
- Surface Water Monitoring (47)
- Arsenic (46)
- Monitoring (46)
- Mercury (44)
- Sustainability (43)
- Pollution (42)
- Climate change (41)
- Envirome (40)
- Maintenance Report (40)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1792)
- Daugherty Water for Food Global Institute: Faculty Publications (109)
- United States Environmental Protection Agency: Publications (97)
- Activities (55)
- Publications (WR) (53)
-
- Sustain Magazine (41)
- Mathematics, Physics, and Computer Science Faculty Articles and Research (40)
- Get Outdoors Nevada (38)
- EKU Faculty and Staff Scholarship (33)
- Water Matters! (32)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (28)
- Limnological Studies (18)
- Water Quality Control: Integrating Beneficial Use and Environmental Protection (Summer Conference, June 1-3) (17)
- Nebraska Department of Environmental Quality: Reports (16)
- Best Practices for Community and Environmental Protection (October 14) (13)
- Department of Environmental Studies: Undergraduate Student Theses (13)
- Nebraska Water Center: Administrative Materials (13)
- UNLV Theses, Dissertations, Professional Papers, and Capstones (13)
- Electronic Theses and Dissertations (12)
- Journal of Earth and Life Science (12)
- Maine Collection (12)
- Best Management Practices (BMPs): What? How? And Why? (May 26) (11)
- The Climate of Environmental Justice: Taking Stock (March 16-17) (11)
- Biosecurity factsheets (10)
- Environmental Science and Management Professional Master's Project Reports (9)
- Faculty and Staff Scholarship (9)
- Independent Study Project (ISP) Collection (9)
- Theses (9)
- Physics Faculty Publications (8)
- Department of Earth and Environmental Studies Faculty Scholarship and Creative Works (7)
- Publication Type
- File Type
Articles 61 - 90 of 2946
Full-Text Articles in Environmental Monitoring
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.
Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston
Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston
Honors Theses
Mobile County, Alabama, receives among the highest annual rainfall totals in the United States resulting in frequent stormwater flooding that intersects with existing socioeconomic vulnerabilities. Within the Mobile County Public School System (MCPSS), 77% of students are economically disadvantaged and over 10% experience homelessness, creating heightened risk for educational disruption during flood events. This study investigates how stormwater flooding influences school attendance, closures, and academic performance across MCPSS, providing insight into how climate-driven hazards exacerbate educational inequities. The research integrates flood frequency, school performance metrics, and GIS flood-zone mapping and teacher perceptions to understand how flooding affects student learning opportunities. …
Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services
Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company
Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Natural Radioactivity And Radiological Hazards In Sediments From The Lindi Coast, Indian Ocean, Tanzania, Viator Mujuni, Innocent J. Lugendo
Natural Radioactivity And Radiological Hazards In Sediments From The Lindi Coast, Indian Ocean, Tanzania, Viator Mujuni, Innocent J. Lugendo
Tanzania Journal of Science
The Lindi coast of the Indian Ocean, located in southeastern Tanzania, supports rich biodiversity and has recently experienced rapid growth in socio-economic activities such as fishing, mining, and oil and gas exploration. These activities may enhance levels of natural radioactivity in coastal sediments, potentially increasing radiation exposure to local populations. Therefore, monitoring radioactivity levels and estimating associated radiation doses in this region is important. In this study, thirty-six sediment samples were collected from twelve locations along the Lindi coast and analysed for naturally occurring radionuclides using high-purity germanium (HPGe) gamma-ray spectrometry. The activity concentrations of 226Ra, 232Th, and …
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (Dated May 13, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.