Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 271 - 300 of 2956

Full-Text Articles in Environmental Monitoring

Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo Dec 2025

Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo

Sinaya: A Philippine Journal for Senior High School Teachers and Students

The long-term use of agricultural products that adversely affect soil is a significant issue for farmers. This study explored the potential of carbonized rice hulls (CRH) waste from biomass boilers as a sustainable soil conditioner. The research investigated the specific soil conditioning properties of CRH and explored the lived experiences of nine (9) Bukidnon farmers to correlate their observations with the material’s chemical profile. The composition analysis identified a high silica content and essential micronutrients, such as calcium and magnesium, which act as nutrient restorers and pH regulators. The thematic analysis of semi-structured interviews, four themes emerged to summarize the …


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Dec 2025

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta Dec 2025

A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta

Computer Science and Engineering Faculty Publications

Florida’s Gulf Coast red tide (Karenia brevis) can put toxins into the air, making people cough, irritating the throat, and worsening asthma or other breathing problems especially when winds blow from the ocean toward the beach. Right now, most public updates don’t really help with the question people actually ask when planning a weekend or vacation: “Will going to or close to the beach be risky in the next few weeks?”.

In this project, I build a weekly early warning system that estimates respiratory risk for specific beaches and predicts that risk 2 to 4 weeks ahead. The study covers …


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Dec 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2025 (Dated September 30, 2025), Emma Rott Dec 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2025 (Dated September 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 2 2024 (Dated August 19, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area 2019-2023 Data Summary Report And Response To Epa Comments (Dated September 24, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area 2019-2023 Data Summary Report And Response To Epa Comments (Dated September 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Climate Change Has Increased Global Evaporative Demand Except In South Asia, Saeed Karimzadeh, Arman Ahmadi, Dennis Baldocchi, Joshua B. Fisher Nov 2025

Climate Change Has Increased Global Evaporative Demand Except In South Asia, Saeed Karimzadeh, Arman Ahmadi, Dennis Baldocchi, Joshua B. Fisher

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Climate change alters how strongly the atmosphere draws water from the land, yet a consistent global assessment of this evaporative demand has been lacking. Here, we analyze 45 years of climate data and global models to quantify trends in the key drivers—air temperature, humidity, radiation, wind speed, and cloud cover—that determine the atmosphere’s drying power. We find that evaporative demand has increased worldwide, indicating a stronger atmospheric thirst, except in South Asia, where it has declined. There, widespread irrigation has increased soil and air moisture, enhanced cloud formation, and reduced sunlight reaching the surface, counteracting the global signal. These contrasting …


Re: Conditional Approval Letter For The Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated November 14, 2025), Emma Rott Nov 2025

Re: Conditional Approval Letter For The Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated November 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc. Nov 2025

Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Harnessing Hyperspectral Imaging And Deep Learning For Terrestrial Habitat Mapping In Arid Landscapes: A Case Study In Saudi Arabia, Ali Elgendy, Hesham Morgan, Brandon Tran, Rejoice Thomas, Tamer Ismail, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Muburak, Khaled Allam Harhash, Hesham El-Askary Nov 2025

Harnessing Hyperspectral Imaging And Deep Learning For Terrestrial Habitat Mapping In Arid Landscapes: A Case Study In Saudi Arabia, Ali Elgendy, Hesham Morgan, Brandon Tran, Rejoice Thomas, Tamer Ismail, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Muburak, Khaled Allam Harhash, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Arid ecosystems remain under-mapped at actionable scales despite their ecological importance. Decision makers lack reliable, high-resolution habitat maps in drylands to prioritize protection and target restoration. This research integrates spaceborne hyperspectral imaging from the Environmental Mapping and Analysis Program (EnMAP) with deep learning semantic segmentation models to produce an updated level of habitat classification based on the International Union for Conservation of Nature (IUCN) for part of the Imam Turki bin Abdullah Royal Reserve, Saudi Arabia. Using ground control points and the full EnMAP spectral cube without band selection, U-Net and DeepLabV3+ architectures were each implemented with VGG19 and ResNet-101 …


Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler Nov 2025

Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Diggings East 95 % Remedial Design Package Submittal (Dated August 29, 2025), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated August 19, 2025), The Draft Final Sbcca Construction Quality Assurance Plan (Dated August 20, 2025) And The Butte Priority Soils Sbcca Operations And Maintenance (O&M) Plan (Dated August 14, 2025), Emma Rott Nov 2025

Re: Comment Letter For Diggings East 95 % Remedial Design Package Submittal (Dated August 29, 2025), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated August 19, 2025), The Draft Final Sbcca Construction Quality Assurance Plan (Dated August 20, 2025) And The Butte Priority Soils Sbcca Operations And Maintenance (O&M) Plan (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-46 Temporary Best Management Practices Work Plan (Dated October 17, 2025), Molly Roby Nov 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-46 Temporary Best Management Practices Work Plan (Dated October 17, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.