Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 301 - 330 of 2963

Full-Text Articles in Environmental Monitoring

Climate Change Has Increased Global Evaporative Demand Except In South Asia, Saeed Karimzadeh, Arman Ahmadi, Dennis Baldocchi, Joshua B. Fisher Nov 2025

Climate Change Has Increased Global Evaporative Demand Except In South Asia, Saeed Karimzadeh, Arman Ahmadi, Dennis Baldocchi, Joshua B. Fisher

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Climate change alters how strongly the atmosphere draws water from the land, yet a consistent global assessment of this evaporative demand has been lacking. Here, we analyze 45 years of climate data and global models to quantify trends in the key drivers—air temperature, humidity, radiation, wind speed, and cloud cover—that determine the atmosphere’s drying power. We find that evaporative demand has increased worldwide, indicating a stronger atmospheric thirst, except in South Asia, where it has declined. There, widespread irrigation has increased soil and air moisture, enhanced cloud formation, and reduced sunlight reaching the surface, counteracting the global signal. These contrasting …


Re: Conditional Approval Letter For The Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated November 14, 2025), Emma Rott Nov 2025

Re: Conditional Approval Letter For The Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated November 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc. Nov 2025

Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Harnessing Hyperspectral Imaging And Deep Learning For Terrestrial Habitat Mapping In Arid Landscapes: A Case Study In Saudi Arabia, Ali Elgendy, Hesham Morgan, Brandon Tran, Rejoice Thomas, Tamer Ismail, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Muburak, Khaled Allam Harhash, Hesham El-Askary Nov 2025

Harnessing Hyperspectral Imaging And Deep Learning For Terrestrial Habitat Mapping In Arid Landscapes: A Case Study In Saudi Arabia, Ali Elgendy, Hesham Morgan, Brandon Tran, Rejoice Thomas, Tamer Ismail, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Muburak, Khaled Allam Harhash, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Arid ecosystems remain under-mapped at actionable scales despite their ecological importance. Decision makers lack reliable, high-resolution habitat maps in drylands to prioritize protection and target restoration. This research integrates spaceborne hyperspectral imaging from the Environmental Mapping and Analysis Program (EnMAP) with deep learning semantic segmentation models to produce an updated level of habitat classification based on the International Union for Conservation of Nature (IUCN) for part of the Imam Turki bin Abdullah Royal Reserve, Saudi Arabia. Using ground control points and the full EnMAP spectral cube without band selection, U-Net and DeepLabV3+ architectures were each implemented with VGG19 and ResNet-101 …


Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler Nov 2025

Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Diggings East 95 % Remedial Design Package Submittal (Dated August 29, 2025), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated August 19, 2025), The Draft Final Sbcca Construction Quality Assurance Plan (Dated August 20, 2025) And The Butte Priority Soils Sbcca Operations And Maintenance (O&M) Plan (Dated August 14, 2025), Emma Rott Nov 2025

Re: Comment Letter For Diggings East 95 % Remedial Design Package Submittal (Dated August 29, 2025), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated August 19, 2025), The Draft Final Sbcca Construction Quality Assurance Plan (Dated August 20, 2025) And The Butte Priority Soils Sbcca Operations And Maintenance (O&M) Plan (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-46 Temporary Best Management Practices Work Plan (Dated October 17, 2025), Molly Roby Nov 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-46 Temporary Best Management Practices Work Plan (Dated October 17, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Field Evaluation Of Reclaimed Sites Summary Report, Butte-Silver Bow Department Of Reclamation And Environmental Services Nov 2025

2025 Field Evaluation Of Reclaimed Sites Summary Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Nov 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 – (Colorado Dump) North Slope (Dated October 17, 2025), Molly Roby Nov 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 – (Colorado Dump) North Slope (Dated October 17, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler Nov 2025

Re: Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Nov 2025

Re: Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Detecting Burned Vegetation Areas By Merging Spectral And Texture Features In A Resnet Deep Learning Architecture, Jiahui Fan, Yunjun Yao, Yajie Li, Xueyi Zhang, Jiquan Chen, Joshua B. Fisher, Xiaotong Zhang, Bo Jiang, Lu Liu, Zijing Xie, Luna Zhang, Fei Qiu Nov 2025

Detecting Burned Vegetation Areas By Merging Spectral And Texture Features In A Resnet Deep Learning Architecture, Jiahui Fan, Yunjun Yao, Yajie Li, Xueyi Zhang, Jiquan Chen, Joshua B. Fisher, Xiaotong Zhang, Bo Jiang, Lu Liu, Zijing Xie, Luna Zhang, Fei Qiu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Timely and accurate detection of burned areas is crucial for assessing fire damage and contributing to ecosystem recovery efforts. In this study, we propose a framework for detecting fire-affected vegetation anomalies on the basis of a ResNet deep learning (DL) algorithm by merging spectral and textural features (ResNet-IST) and the vegetation abnormal spectral texture index (VASTI). To train the ResNet-IST, a vegetation anomaly dataset was constructed on high-resolution 30 m fire-affected remote sensing images selected from the Global Fire Atlas (GFA) to extract the spectral and textural features. We tested the model to detect fire-affected vegetation in ten study areas …


Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran Nov 2025

Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Oct 2025

Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Oct 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier Oct 2025

Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Biological nitrogen fixation (BNF) is the primary input of new reactive nitrogen to natural terrestrial ecosystems. However, this flux is poorly constrained due to its unclear drivers and associated control mechanisms. Here, we extend the existing theory of nitrogen (N) isotope mass balance to estimate BNF rates and then use a Bayesian approach to constrain the BNF rates in natural terrestrial ecosystems by using measurements of natural N-isotope ratios (δ15N) in plants (δP) and soil (δS). Together with pairwise δP and δS measurements from 18 forest sites covering diverse climates and thousands …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott Oct 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson Oct 2025

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.