Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
- File Type
Articles 31 - 60 of 398
Full-Text Articles in Environmental Indicators and Impact Assessment
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.
Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.