Open Access. Powered by Scholars. Published by Universities.®
Environmental Indicators and Impact Assessment Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 31 - 60 of 143
Full-Text Articles in Environmental Indicators and Impact Assessment
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty
Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty
Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Sites Field Sampling (Fsp) (Dated August 14, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty
Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan (Fsp), Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.