Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 301 - 330 of 2613

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc. Mar 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Automated Machine Learning For High-Resolution Daily And Hourly Methane Emission Mapping For Rice Paddies Over South Korea: Integrating Modis, Era5-Land, And Soil Data, Jiah Jang, Seung Hee Kim, Menas Kafatos, Jaeil Cho, Gayoung Yoo, Sujong Jeong, Yangwon Lee Mar 2026

Automated Machine Learning For High-Resolution Daily And Hourly Methane Emission Mapping For Rice Paddies Over South Korea: Integrating Modis, Era5-Land, And Soil Data, Jiah Jang, Seung Hee Kim, Menas Kafatos, Jaeil Cho, Gayoung Yoo, Sujong Jeong, Yangwon Lee

Institute for ECHO Articles and Research

Agriculture is a major global source of methane (CH4), and accurate emission estimates are essential for refining national greenhouse gas inventories and supporting climate-resilient policies. This study develops a high-resolution estimation framework for CH4 emissions from Korean rice paddies by integrating multi-source datasets, including Moderate Resolution Imaging Spectroradiometer (MODIS) vegetation indices, European Centre for Medium-Range Weather Forecasts (ECMWF) Reanalysis Version 5 (ERA5)-Land meteorological variables, and Harmonized World Soil Database (HWSD) soil properties. Using CH4 flux observations from four global rice ecosystems (Italy, Japan, South Korea, and USA), we constructed parallel daily and hourly machine learning models using an automated machine …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications (Dated August 15, 2025), Molly Roby Feb 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Hill Revegetation Specifications (Dated August 15, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services Feb 2026

2022 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Probabilistic Deep Learning Framework For Retrieving Chlorophyll-A From Hyperspectral Imagery: Integrating Channel Attention And Mixture Density Networks, Wenzhao Li, Surendra Maharjan, Rejoice Thomas, Junde Chen, Hesham Morgan, Michael J. Garay, Olga V. Kalashnikova, Shahryar Fazli, Charles Ichoku, Hesham El-Askary Feb 2026

A Probabilistic Deep Learning Framework For Retrieving Chlorophyll-A From Hyperspectral Imagery: Integrating Channel Attention And Mixture Density Networks, Wenzhao Li, Surendra Maharjan, Rejoice Thomas, Junde Chen, Hesham Morgan, Michael J. Garay, Olga V. Kalashnikova, Shahryar Fazli, Charles Ichoku, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Accurate monitoring of Chlorophyll-a (Chla) is critical for assessing aquatic ecosystem health, yet ecological complexity often leads to ambiguous spectral signatures in satellite data. Traditional deterministic models assume a one-to-one mapping between spectra and pigments, often failing to capture these high-dimensional analytical challenges. In this study, we propose a novel deep learning architecture, the Channel Attention-Mixture Density Network (CA-MDN), to retrieve Chla from the National Aeronautics and Space Administration (NASA) Earth Surface Mineral Dust Source Investigation (EMIT) hyperspectral mission. The CA-MDN integrates an attention mechanism to dynamically select ecologically relevant spectral bands and employs a probabilistic output layer to quantify …


Re: Approval Letter For The Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report (Dated February 11, 2026), Emma Rott Feb 2026

Re: Approval Letter For The Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report (Dated February 11, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Https://Digitalcommons.Mtech.Edu/Superfund_Silverbowbutte/1787/, Josh Bryson Feb 2026

Https://Digitalcommons.Mtech.Edu/Superfund_Silverbowbutte/1787/, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter With Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated February 4, 2026), Emma Rott Feb 2026

Re: Conditional Approval Letter With Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated February 4, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Potential Logan, Montana, Borrow Source Site Environmental Assessment Checklist, Molly Roby Feb 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Potential Logan, Montana, Borrow Source Site Environmental Assessment Checklist, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Mcdermott Basin Creek Water Treatment Plant Subsurface Fill Borrow Submittal #1, Molly Roby Feb 2026

Re: Approval Letter For The Draft Final 2026 Butte Priority Soils Operable Unit (Bpsou) Mcdermott Basin Creek Water Treatment Plant Subsurface Fill Borrow Submittal #1, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated January 5, 2026), Molly Roby Feb 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated January 5, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow Feb 2026

Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance January 2026, Josh Bryson Feb 2026

Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance January 2026, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area Final Principles For A Greener Cleanup Report, Woodard & Curran Feb 2026

Silver Bow Creek Conservation Area Final Principles For A Greener Cleanup Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson Feb 2026

Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Josh Bryson Feb 2026

Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.