Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 271 - 300 of 2613

Full-Text Articles in Environmental Indicators and Impact Assessment

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. Apr 2026

Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Apr 2026

Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Saved From The Brink Of Collapse: Evaluating The Success Of The Sussex Kelp Recovery Project, Keagan Farrell, Kelly Swyers, Adan Vasquez Apr 2026

Saved From The Brink Of Collapse: Evaluating The Success Of The Sussex Kelp Recovery Project, Keagan Farrell, Kelly Swyers, Adan Vasquez

Posters - 2026

Kelp forests are vital to ocean health, they provide habitat, food, and nursery grounds for a variety of marine species. These forests support fisheries, improve water quality, and help to protect coastlines (Eger et al. 2024). The Sussex Kelp Recovery Project is a marine conservation effort aimed at restoring their kelp forests along the Sussex coastline in southern England. This area lost up to 96% of its forests mainly due to the fishing practice trawling. Trawling is used to gather large amounts of fish, while dragging a net at the seafloor (Our history 2026). The main goal of the Sussex …


Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa Apr 2026

Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. Apr 2026

Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc. Apr 2026

Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson Mar 2026

Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson Mar 2026

Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Mar 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026), Molly Roby Mar 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Mar 2026

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty Mar 2026

Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott Mar 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott Mar 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott Mar 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026), Emma Rott Mar 2026

Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025), Emma Rott Mar 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby Mar 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Molly Roby Mar 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Mar 2026

Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Molly Roby Mar 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Mar 2026

Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Mar 2026

Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Peruvian Pinniped Teeth Trace Element Data-Tracking Ecosystem Variabilites Through Trace Element Record Found In Peruvian Pinniped Dentin, Dimitrios Giarikos, Amy Hirons, Ally E. Sheehan, Radleigh Santos Mar 2026

Peruvian Pinniped Teeth Trace Element Data-Tracking Ecosystem Variabilites Through Trace Element Record Found In Peruvian Pinniped Dentin, Dimitrios Giarikos, Amy Hirons, Ally E. Sheehan, Radleigh Santos

SECLER Data

The South American sea lion (Otaria byronia; SASL) and the Peruvian fur seal (Arctocephalus australis; PFS) are apex predators within the Humboldt Current ecosystem, where population dynamics respond to both natural variability and anthropogenic pressures, including El Niño–Southern Oscillation (ENSO) events and coastal mining. This study quantified 18 trace elements (TEs) in canine dentin from both species collected at Punta San Juan, Peru using laser ablation-inductively coupled plasma-mass spectrometry (LA-ICP-MS) to evaluate long-term environmental exposure. Because dentin is deposited incrementally, it preserves a chronological chemical archive reflecting ontogenetic shifts in diet and habitat use. Overall, TE concentrations were broadly similar …


Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson Mar 2026

Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter With Comments For The Draft Final 2026 Residential Metals Abatement Program (Rmap) Anselmo Mine Yard Development Plan (Dated February 25, 2026), Molly Roby Mar 2026

Re: Conditional Approval Letter With Comments For The Draft Final 2026 Residential Metals Abatement Program (Rmap) Anselmo Mine Yard Development Plan (Dated February 25, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler Mar 2026

Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.