Open Access. Powered by Scholars. Published by Universities.®

2023

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 151 - 180 of 531

Full-Text Articles in Environmental Health and Protection

Final Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2023-03, Josh Bryson Sep 2023

Final Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2023-03, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty Sep 2023

Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Bpsou Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan And Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan (Dated August 31, 2023), Atlantic Richfield Company Aug 2023

Comment Letter For Draft Bpsou Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan And Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan (Dated August 31, 2023), Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Self-Reported Consumption Of Bottled Water V. Tap Water In Appalachian And Non-Appalachian Kentucky, Jason W. Marion Aug 2023

Self-Reported Consumption Of Bottled Water V. Tap Water In Appalachian And Non-Appalachian Kentucky, Jason W. Marion

Journal of Appalachian Health

Introduction: Quantitative studies on drinking water perceptions in Appalachia are limited. High-profile water infrastructure failures in the U.S. and Eastern Kentucky, coupled with human-made and natural disasters in the Appalachian Region, have likely impacted opinions regarding tap water.

Purpose: To use existing unexplored data to describe baseline tap water v. bottled water consumption in Kentucky.

Methods: Telephone-based cross-sectional data were obtained from the 2013 Kentucky Health Issues Poll (KHIP) directed by the Foundation for a Healthy Kentucky. Among many items in KHIP, self-reported consumption of bottled water over tap water, reasons for bottled water use, and demographic data were obtained. …


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed And Insufficiently Reclaimed Sites Request For Change 2023-01, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed And Insufficiently Reclaimed Sites Request For Change 2023-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Usa: Wolf Connection And Inclusive, Safe Spaces For All, Patrick Fuery, Kelli Fuery Aug 2023

Usa: Wolf Connection And Inclusive, Safe Spaces For All, Patrick Fuery, Kelli Fuery

CCI Books and Book Chapters

"Wolf Connection is a wolf sanctuary located on the outskirts of a rural town, Acton, California, nestled in the Angeles National Forest. The sanctuary consists of 165 acres of stunning woodland and high desert mountains, including a year-round stream. It is located within a one-hour drive from Los Angeles. Wolf Connection runs a series of programmes based around issues of mental health, addressing social and economic inequality, and providing strategies for resilience and well-being. Wolf Connection identifies the following as its core business activities: Providing Animal Rescue and Wildlife Preservation; At-Risk Youth Education and Empowerment; Community Empowerment; and Environmental Awareness …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-43 – Area Near Missoula Gulch Ball Field (Dated August 18, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-43 – Area Near Missoula Gulch Ball Field (Dated August 18, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree - Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2023

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree - Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site 2 Nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Aug 2023

Re: Silver Bow Creek Butte Area Npl Site 2 Nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Kennedy Elementary (July 5, 2023), Nikia Greene Aug 2023

Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Kennedy Elementary (July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2023

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2023

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-42 – Area Near Walkerville Playground (Dated August 18, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur-42 – Area Near Walkerville Playground (Dated August 18, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2023

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Aware Early Head Start – Revision 1 (May 19, 2023), Nikia Greene Aug 2023

Approval Of The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Aware Early Head Start – Revision 1 (May 19, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Work Plan, Mike Mcanulty, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Work Plan, Mike Mcanulty, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Subject: Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E. Aug 2023

Subject: Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites – Field Sampling Plan (Fsp) Butte Remediation Evaluation System (Bres) No. 31 Waste Dump #5, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites – Field Sampling Plan (Fsp) Butte Remediation Evaluation System (Bres) No. 31 Waste Dump #5, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E. Aug 2023

Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Rmap Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Final 2023 Rmap Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson Aug 2023

Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ball Field, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 43 – Area Near Missoula Gulch Ball Field, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Quality Assurance Project Plan (Qapp) (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Quality Assurance Project Plan (Qapp) (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.