Open Access. Powered by Scholars. Published by Universities.®

2023

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 181 - 210 of 531

Full-Text Articles in Environmental Health and Protection

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Baptist Student Union Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene Aug 2023

Approval For The Butte Priority Soils Operable Unit (Bpsou) 2023 Residential Metals Abatement Program Stodden Park Soil Remedial Action Work Plan (Rawp) (Dated August 8, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene Aug 2023

Approval For Draft Final 2022 Annual Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 6, 2023, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson Aug 2023

Approved Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability; Request For Change Brw-2023-02, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5 (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Crop Monitoring And Nutrient Prediction Using Satellite Imagery And Soil Data, Olatunde D. Akanbi, Brian Gonzalez Hernandez, Erika I. Barcelos, Arafath Nihar, Laura S. Bruckman, Yinghui Wu, Jeffrey Yarus, Roger H. French Aug 2023

Crop Monitoring And Nutrient Prediction Using Satellite Imagery And Soil Data, Olatunde D. Akanbi, Brian Gonzalez Hernandez, Erika I. Barcelos, Arafath Nihar, Laura S. Bruckman, Yinghui Wu, Jeffrey Yarus, Roger H. French

Student Scholarship

No abstract provided.


Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson Aug 2023

Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills Aug 2023

Trace Metal Analysis Of Pond Sediments To Measure Deposition From A Coal-Fired Power Plant In Ackerman Mississippi, Charles Bills

Theses and Dissertations

Trace element sediment pollution due to coal power plants have been reported in many countries. In this study, pond sediment samples collected from locations around a coal fired power plant in Ackerman, MS, were evaluated for their trace element concentration and pollution status. The samples were collected at two depths to study changes in element accumulation over time. The samples were digested and the elements, As, Cd, Cr, Cu, Pb, Hg, and Zn were analyzed using ICP-MS. Results were then compared to known background concentrations as well as sediment quality guidelines and pollution thresholds. The sample locations downwind of the …


Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller Aug 2023

Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller

Electronic Theses and Dissertations

In June of 2022 a “frac out” occurred in New Freeport, PA when an unconventional gas well under development by hydraulic fracturing, communicated with an abandoned gas well to the surface. An initial “zone of impact” encompassed much of the town’s main thoroughfare. Water samples were obtained from 17 private water wells, 5 springs and 1 pond (31 total samples) and analyzed for cations, anions, and light hydrocarbons. Methane was found in 18 of the samples, both located within and outside of the “zone of impact”. Mass ratio analyses indicated contamination from both unconventional and conventional wells. Interferometric Synthetic Aperture …