Full-Text Articles in Construction Engineering and Management

Key Characteristics Of Long-Lived Portland Cement Concrete Airfield Pavements In The United States Air Force Enterprise, Cameron J. Palmer Mar 2025

Key Characteristics Of Long-Lived Portland Cement Concrete Airfield Pavements In The United States Air Force Enterprise, Cameron J. Palmer

Theses and Dissertations

The United States Air Force maintains a $30 billion portfolio of airfield pavements essential for national security. Despite their importance, budget constraints have limited average annual repair funding to $260 million over the past decade, requiring pavements to last significantly longer than their typical life span. This project addresses the central question: What design features or characteristics contribute to the longevity of Portland Cement Concrete (PCC) airfield pavements? Utilizing data from AFCEC's Airfield Pavement Evaluation (APE) team and the PAVER sustainment management system, this study employed linear regression, logistic regression, and deep artificial neural network (ANN) modeling techniques to identify …


Quantifying The Impact Of Highly Corrosive Environments On Fsrm Budgets And Infrastructure Condition At Air Force Bases, Justin M. Weber Mar 2025

Quantifying The Impact Of Highly Corrosive Environments On Fsrm Budgets And Infrastructure Condition At Air Force Bases, Justin M. Weber

Theses and Dissertations

The Department of Defense (DoD) faces significant challenges in maintaining mission-critical infrastructure within highly corrosive environments, with annual costs exceeding $22.5 billion to combat corrosion. This thesis investigated the interplay between environmental severity, sustainment funding, and infrastructure performance. This research utilized Facility Sustainment, Restoration, and Modernization (FSRM) funding data, statistical analyses, and regression modeling, to evaluate how Environmental Severity Index (ESI) categories influence Base Condition Index (BCI) trends and the efficacy of the Facility Sustainment Model (FSM). The analysis revealed that installations in higher ESI categories required significantly greater investment per square foot to achieve comparable improvements in BCI. The …


Proof Of Concept: Using Uas Technology To Accomplish Aerial Roof Inspections, Madison R. Fanning Mar 2025

Proof Of Concept: Using Uas Technology To Accomplish Aerial Roof Inspections, Madison R. Fanning

Theses and Dissertations

With the growing use of simulation across industries, the digital twin remains an underexplored research area, particularly in emergency management and response. Its real-time updating capability is often overlooked due to the misconception that "digital twin" is merely a complex term for simulation. This paper highlights its distinctiveness through an evasion exercise involving two independent entities in a collocated environment. Using a highly integrated virtual environment (HIVE) and internet of things (IoT) devices, we link the physical system with an analytical simulation, demonstrating the impact of lag times in high-pressure scenarios. The computational model leverages agent-based modeling (ABM) and discrete-event …


Molecular Scale Investigations Of Interactions Between Pfas And Concrete, Eric E. Keeler Mar 2025

Molecular Scale Investigations Of Interactions Between Pfas And Concrete, Eric E. Keeler

Theses and Dissertations

Per- and polyfluoroalkyl substances (PFAS), widely referred to as “forever chemicals,” exhibit high environmental persistence and potential health risks due to their robust carbon-fluorine bonds. These substances are prevalent in aqueous film-forming foams (AFFF), used in industrial and military applications, and are known to contaminate environmental surfaces, including concrete. This study aims to characterize the molecular-level interaction energies of six PFAS species—PFOA, PFOS, PFHxS, PFHxA, 6:2 FTS, and PFBS—with calcium silicate, a key component of concrete, using density functional theory (DFT) calculations. Change in Gibbs free energy (ΔG) was determined for each of the interactions, revealing negative ΔG values for …


Calibrating Airfield Pavement Asset Management For A Changing Global Climate: A Case Study At Fairchild Air Force Base, Emily L. Worthy Mar 2025

Calibrating Airfield Pavement Asset Management For A Changing Global Climate: A Case Study At Fairchild Air Force Base, Emily L. Worthy

Theses and Dissertations

Military airfields and civilian airports serve as foundational nodes in the global transportation network, enabling travel, economic growth, and the projection of national security. This study investigates the relationship between climate variables projected through climate change and pavement degradation, with a focus on Fairchild Air Force Base (AFB). Using principal component regression (PCR), the research integrates historical pavement condition index (PCI) data with climate variables, including snowfall, precipitation, freeze-thaw cycles, solar irradiance, and wind speed to develop a predictive model of pavement performance under future climate scenarios, Representative Concentration Pathway (RCP) 4.5 and RCP 8.5. These models, for both Portland …


The Application Of Decision Analysis Theory For Space Allocation At The Air Force Institute Of Technology, Damian N. Soriano Mar 2025

The Application Of Decision Analysis Theory For Space Allocation At The Air Force Institute Of Technology, Damian N. Soriano

Theses and Dissertations

This thesis investigates the application of Decision Analysis Theory to optimize space allocation at the Air Force Institute of Technology (AFIT). Through a Multi-Objective Decision Analysis (MODA) framework, this study addresses existing methodologies for space allocation in military, academic, and office settings; the rules, limitations, and factors influencing space utilization at AFIT; and approaches to improve office and lab allocations for institutional efficiency and fairness. This research incorporates qualitative and quantitative metrics, including faculty and student data, research outputs, and historical space usage. These findings highlight significant complexities in space allocation, particularly in reconciling administrative and research requirements with structural …


Maintenance Strategy And Budgeting Optimization For United States Air Force Facilities, Sophia C. Hirtle Mar 2025

Maintenance Strategy And Budgeting Optimization For United States Air Force Facilities, Sophia C. Hirtle

Theses and Dissertations

Mission readiness in the United States Air Force (USAF) is critically dependent on the sustainment and maintenance of aging facilities. However, budgetary and manpower constraints have led to a significant backlog of deferred maintenance, estimated at $137 billion. To address these challenges, this research develops an optimization model that aids in prioritizing facility maintenance strategies within a fixed budget. The methodology incorporates existing USAF data from BUILDER, NexGenIT, and financial records to create a simulation-based optimization framework at the base level. The model evaluates four different maintenance strategies—replacement only, preventative maintenance only, corrective maintenance only, and a combination of preventative …


Discovering Design Requirements For Next Generation Arctic Tension Fabric Shelters, Mark W. Mcveigh Mar 2025

Discovering Design Requirements For Next Generation Arctic Tension Fabric Shelters, Mark W. Mcveigh

Theses and Dissertations

Military operations to remote Arctic regions require large-span temporary shelters to house tactical aircraft and provide heated maintained spaces. However, the current System-50 Large Area Maintenance Shelters used by the United States Air Force and Department of Defense are inadequate for Arctic deployments. These shelters lack durability against extreme subzero temperatures, heavy snow accumulation, and high wind speeds. They also fail to address critical Arctic-specific design challenges including permafrost protection, foundation disruption caused by frost heaves, and efficient heating as a result of their inadequate thermal resistance properties. This research analyzed 20 years of climatological data from 8,399 weather observation …


Early-Phase Cost Estimation For Department Of Defense Construction Projects Via Artificial Neural Networks: Implications And Policy Recommendations For Artificial Intelligence Integration, Kobe T. Thompson Mar 2025

Early-Phase Cost Estimation For Department Of Defense Construction Projects Via Artificial Neural Networks: Implications And Policy Recommendations For Artificial Intelligence Integration, Kobe T. Thompson

Theses and Dissertations

The Department of Defense lost over 500 million dollars between 2016 and 2024, partially due to poor early cost estimates resulting in cost overruns. practice for cost estimation relied on parametric techniques that incorporate historical data, subject matter experts in cost estimating, and predictive software applications. The main motivation for this study was to assess the viability of artificial neural networks as a means of providing a more accurate cost estimate in the early design phases of a construction project. The dataset initially contained approximately 48,000 data points from a database of various Air Force projects, including maintenance, repair, minor …


Developing Core Competencies For The Air Force Civil Engineer Asset Management Career Field, David A. Rochester Mar 2025

Developing Core Competencies For The Air Force Civil Engineer Asset Management Career Field, David A. Rochester

Theses and Dissertations

The United States Air Force (USAF) relies on a highly trained and capable workforce to maintain and manage its infrastructure, ensuring mission readiness and operational effectiveness. However, the increasing complexity of asset management, aging infrastructure, and evolving global threats necessitate a structured approach to developing the competencies required for Air Force Civil Engineer Asset Managers. This research aims to identify, develop, and validate core competencies specific to this career field, utilizing a structured methodology that combines an Education Working Group (EWG) with a Delphi study. The study begins with an expert-led EWG to generate an initial list of competencies based …


Construction Change Order Data As Inputs For A Programmatic Risk Model, Eric C. Klein Feb 2025

Construction Change Order Data As Inputs For A Programmatic Risk Model, Eric C. Klein

Theses and Dissertations

Hurricane Michael struck Tyndall Air Force Base as a Category 5 storm with 160 mph winds, damaging or destroying 90% of its infrastructure (484 buildings). This devastation prompted the Department of Defense to rebuild Tyndall as the “Installation of the Future,” encompassing 44 Military Construction (MILCON) projects and 260 Facility Restoration, Sustainment, and Modernization (FRSM) projects. Since reconstruction began, over 630 Change Request Forms (CRFs) have been closed, adding $67.8 million in costs and 4,880 construction days. The Air Force Civil Engineer Center's Natural Disaster Recovery (NDR) Division developed a programmatic risk model to predict future costs and delays. However, …


A Statistical Analysis Of Phased Construction Projects, Timothy M. Dejong Mar 2024

A Statistical Analysis Of Phased Construction Projects, Timothy M. Dejong

Theses and Dissertations

The construction industry is known for exceeding target budgets and schedules, and Department of Defense projects are no exception. The Air Force Installation & Mission Support Center (AFIMSC) manages a budget of $3.14 billion to repair, alter, demolish, and maintain Air Force facilities. However, an ever-increasing backlog of maintenance and repair work and a consistently underfunded repair program pose an increased financial risk to the sustainability of the construction and repair program. Phasing large construction efforts is a potential strategy that has recently been used to yield efficiencies by AFIMSC program managers. This study presents a statistical analysis of phased …


Quantifying Resilience And Redundancy For Air Force Linear Infrastructure, Ryan C. Jakovich Mar 2024

Quantifying Resilience And Redundancy For Air Force Linear Infrastructure, Ryan C. Jakovich

Theses and Dissertations

The historical underfunding of USAF infrastructure necessitates a strategic approach to reduce excess infrastructure while preserving resilience in the face of potential first-strike scenarios. This thesis formulates an infrastructure resilience metric that assesses network performance under varying degrees of damage. Furthermore, the study calculates the impact of redundant infrastructure by introducing added structural elements and measuring the resultant reduction in performance loss during damage scenarios. Utilizing USAF geospatial infrastructure data, adjacency matrices representing graph theory networks were constructed in Arc GIS Pro and evaluated using coding languages from the IGraph library and algorithms developed in RStudio. The newly proposed performance …


Optimizing Hub And Spoke Selections For Adaptive Basing In Agile Combat Employment, Alan Heng Mar 2024

Optimizing Hub And Spoke Selections For Adaptive Basing In Agile Combat Employment, Alan Heng

Theses and Dissertations

Advancing technologies and emerging competitors within the Indo-Pacific region have rendered the use of fixed installations for United States Air Force (USAF) operations less than optimal for generating airpower. The adoption of Agile Combat Employment (ACE) is imperative and emphasizes a hub-and-spoke model. However, the methodology for selection of contingency locations remains undecided. Current selection of optimal sites hinges on an optimization framework, employing either rank-based or mathematical approaches that consider various criteria to assess and quantify each location. These criteria are then addressed through objectives and constraints, forming the basis for an effective decision-making process. This paper introduces two …


Predictive Analytics For Military Construction Overruns: A Machine Learning Approach, William D. Hunter Mar 2024

Predictive Analytics For Military Construction Overruns: A Machine Learning Approach, William D. Hunter

Theses and Dissertations

This research focused on analyzing cost and schedule overruns in a specific set of Air Force MILCON projects. Using data from the Built Infrastructure Common Operating Picture (BICOP), several advanced machine learning techniques, including LASSO regression and Random Forest, were applied to uncover patterns and build predictive models. The work sought to enhance the decision-making capabilities and efficiency of project managers within the Air Force through data-driven insights. A key finding from the models indicated that location was the most important factor in influencing a project’s tendency toward cost and schedule overrun. The best model for predicting schedule overrun achieved …


Development Of A Metric To Quantify Facility Hardening, Jesse C. Solorzano Mar 2024

Development Of A Metric To Quantify Facility Hardening, Jesse C. Solorzano

Theses and Dissertations

This research investigates the intricate aspect of infrastructure resilience, focusing on the distinction between hardening and resilience. Hardening, often used interchangeably, with enhancing resilience, involves strategies to strengthen facilities, networks, or systems against various threats. Despite its recognized importance in mitigating physical disruptions and enhancing facility functionality amid different threats, a significant vagueness persists in quantitatively defining hardening. This thesis addresses this gap by developing a quantifiable metric for facility hardening, separate from general resilience measures. The study begins by exploring the historical context of facility hardening, linked to catastrophic events and the need for resilient infrastructure. It explores various …


An Analysis Of Military Construction Cost Escalation And How It Is Accounted For In Cost Estimating Practices, Benjamin D. Rieben Mar 2024

An Analysis Of Military Construction Cost Escalation And How It Is Accounted For In Cost Estimating Practices, Benjamin D. Rieben

Theses and Dissertations

Construction escalation is a significant economic phenomenon that plays an important role in the construction industry. It refers to the steady increase in the costs associated with facility and infrastructure projects over time. Accurately capturing escalation is a key component in the development of construction cost estimates, and failure to adequately account for escalation can have far-reaching consequences. This is especially true for Military Construction (MILCON) projects, which account for billions of dollars of defense spending annually. The Department of Defense (DoD) utilizes a unit cost approach to develop rough order of magnitude (ROM) estimates for MILCON projects. The DoD …


Long-Term Asset Prioritization To Support District Planning, Melissa R. Sallberg Mar 2023

Long-Term Asset Prioritization To Support District Planning, Melissa R. Sallberg

Theses and Dissertations

The United States Air Force (USAF) relies on its installations to project military power across the globe. However, due to the deferred infrastructure maintenance and recapitalization backlog of $33 billion as of 2019 (Wilson & Goldfein, 2019), it is more critical than ever for base-level community planners to focus their attention to the projects that will achieve each installation’s long-term goals. The recent incorporation of asset management principles into the USAF District Planning Process allows a unique opportunity to improve the existing scoring model for a holistic look at what matters to enterprise leaders and community planners making the plans …


Arctic Construction Under Climatological Constraints: A Decision Support System For Expeditionary Construction Site Selection In The Arctic Environment, Zachary S. Wontrop Mar 2023

Arctic Construction Under Climatological Constraints: A Decision Support System For Expeditionary Construction Site Selection In The Arctic Environment, Zachary S. Wontrop

Theses and Dissertations

The natural physical barriers present in the Arctic are being eroded by climate change, increasing near peer adversaries' abilities to exploit this region for strategic and economic gain. To maintain the Arctic as a region of strategic and economic international cooperation, increased infrastructure investment by the United States and its allies are required. No methodology currently exists to quantify construction-limiting climatological factors over time and space. Decision support systems can provide actionable information to guide decision makers during site selection. This research employs geographic, and time-coded historical climatology applied to a project case study, to develop a site selection decision …


Contested Agile Combat Employment: A Site-Selection Methodology, Zachary T. Moer, Christopher M. Chini, Peter P. Feng, Steven J. Schuldt Oct 2022

Contested Agile Combat Employment: A Site-Selection Methodology, Zachary T. Moer, Christopher M. Chini, Peter P. Feng, Steven J. Schuldt

Faculty Publications

Numerous factors complicate ACE site-selection decisions including peer-to-peer threats, complex geopolitics, and resource requirements. The proposed site-selection framework identifies existing airports best suited for strategic utilization to support combatant commands as they optimize agile combat employment infrastructure.


Cost-Benefit Analysis Of The Saudi Land Bridge Project, Faris J. Alotaibi Sep 2022

Cost-Benefit Analysis Of The Saudi Land Bridge Project, Faris J. Alotaibi

Theses and Dissertations

Projects are the backbone of economic thrive of nations, especially infrastructure projects. It’s counted as the base layer of allowing economic trade between beneficiaries. Railway projects have always been a huge element in increasing trade operations between Saudi Arabia and the rest of the world, by providing an efficient and environmentally friendly way that is capable of hauling large loads of exports all the way to the seaports and from there to the rest of the world. The Saudi land bridge project will cost about $11 billion and will provide a new link between the existent railway in the eastern …


Investigation Into Engineering Change Order Costs And Appropriate Rules-Of-Thumb, Kaiana M. Miller Mar 2022

Investigation Into Engineering Change Order Costs And Appropriate Rules-Of-Thumb, Kaiana M. Miller

Theses and Dissertations

Engineering Change Orders (ECO) are technical requirements changes to existing contracts. To account for the potential increase in contract costs stemming from ECOs, current acquisition practice is to estimate a dollar value to hold in management reserve (MR) in case of ECO occurrence. Estimators often rely on rules-of-thumb when developing these estimates. Specifically, estimators use a 10% rule-of-thumb for estimating MR contract costs in the Development life cycle phase and a 5% rule-of-thumb for contracts in the Production or O&S life cycle phase. However, no empirical data supports or validates these 10% and 5% figures. Using a new data source, …


Critical Evaluation Of Construction Industry-Related Additive Manufacturing Research: A Scientometric Analysis, Tyler J. Brunjes Mar 2022

Critical Evaluation Of Construction Industry-Related Additive Manufacturing Research: A Scientometric Analysis, Tyler J. Brunjes

Theses and Dissertations

Review of construction-related AM literature is used to identify the advantages, challenges, and current trends of the research. Using a scientometric analysis of 522 bibliographic records, this research systematically analyzed construction related AM research to determine the key research areas and trends. Results showed that starting in 2015, the field has been growing at an exponential rate. Recent AM research focused on materials and reinforcement topics, which matched the most notable challenges of AM, which are material rheology, reinforcement, and lacking construction standards. This study provides an insight into AM research and identifies areas requiring more innovation before its commercial …


Quantifying Project Complexity To Resource Project Managers, Jereme R. Henrard Mar 2022

Quantifying Project Complexity To Resource Project Managers, Jereme R. Henrard

Theses and Dissertations

This research develops a multi-criteria decision analysis model to quantify project complexity and inform decision-makers in resource-constrained organizations with the Tyndall Program Management Office (PMO) as a case study. The complexity score is used as a risk metric to determine the appropriate number of skilled or novice project managers to effectively manage the PMO portfolio to mitigate cost and schedule overruns. The research provides an innovative approach to consider manning levels at the PMO and other project management-focused organizations/sections.


A United States Air Force Site Selection Methodology In A Contested Agile Combat Employment Environment, Zachary T. Moer Mar 2022

A United States Air Force Site Selection Methodology In A Contested Agile Combat Employment Environment, Zachary T. Moer

Theses and Dissertations

The United States Air Force’s (USAF) Agile Combat Employment (ACE) strategy relies on host country access and underlying local infrastructure to facilitate airpower. However, numerous factors, including peer-to-peer threats, complex geopolitics, and intricate supply chain management, often complicate site access and thwart site selection decisions. When shaping the battlespace for future conflict, strategists and planners face the difficult task of identifying optimal locations to conduct adaptive basing operations given these complicating factors. Multi-Criteria Decision Analysis (MCDA) can help strategists appropriately account for competing objectives and maintain a competitive advantage with theater adversaries. This thesis presents an MCDA model that evaluates …


Performance-Based Building System Manufacturer Selection Decision Framework For Integration Into Total Cost Of Ownership Evaluations, Sarah L. Brown, Steven J. Schuldt, Michael N. Grussing, Louis B. Bartels, Michael A. Johnson, Justin D. Delorit Oct 2021

Performance-Based Building System Manufacturer Selection Decision Framework For Integration Into Total Cost Of Ownership Evaluations, Sarah L. Brown, Steven J. Schuldt, Michael N. Grussing, Louis B. Bartels, Michael A. Johnson, Justin D. Delorit

Faculty Publications

Facility managers are often faced with building system procurement or replacement decisions, requiring them to select a system from among competitive manufacturers. Total cost of ownership (TCO) criteria, informed by built assets in operation in the manager’s portfolio, provides some information to select the right asset manufacturer. However, managers must also consider technical performance to complete a more comprehensive analysis. Performance can be calculated using asset parameters like condition, age, and variation in condition to aid in TCO assessments. Leveraging past research and approaches, performance is calculated using an additive model that scales each parameter using a standard normalization technique …


Developing A Cost Of Delay (Cod) Framework For The Dod & Analyzing The Current State Of Air Force Agile Cost Estimation, James Goljan Mar 2021

Developing A Cost Of Delay (Cod) Framework For The Dod & Analyzing The Current State Of Air Force Agile Cost Estimation, James Goljan

Theses and Dissertations

The study has two research objectives. The first research objective develops a proof of concept for a Cost of Delay (CoD) framework to evaluate the Air Forces Kessel Run Software Factory. CoD provides a means to justify and prioritize competing interests regarding budgetary, manpower, and overall strategic decisions. DoD organizations can employ a cost minimization framework to conduct CoD Analysis. The results demonstrate Software Factories eschew trends in the literature towards more complicated cost models that incorporate machine learning with Data-Based techniques in lieu of simpler models that utilize Engineering Build-up Capacity Based techniques.


Weather-Related Construction Delays In A Changing Climate: A Systematic State-Of-The-Art Review, Steven J. Schuldt, Matthew R. Nicholson, Yaquarri A. Adams Ii, Justin D. Delorit Mar 2021

Weather-Related Construction Delays In A Changing Climate: A Systematic State-Of-The-Art Review, Steven J. Schuldt, Matthew R. Nicholson, Yaquarri A. Adams Ii, Justin D. Delorit

Faculty Publications

Adverse weather delays forty-five percent of construction projects worldwide, costing project owners and contractors billions of dollars in additional expenses and lost revenue each year. Additionally, changes in climate are expected to increase the frequency and intensity of weather conditions that cause these construction delays. Researchers have investigated the effect of weather on several aspects of construction. Still, no previous study comprehensively (1) identifies and quantifies the risks weather imposes on construction projects, (2) categorizes modeling and simulation approaches developed, and (3) summarizes mitigation strategies and adaptation techniques to provide best management practices for the construction industry. This paper accomplishes …


Decision Model For Additive Versus Conventional Construction In Remote Locations, Matthew R. Nicholson Mar 2021

Decision Model For Additive Versus Conventional Construction In Remote Locations, Matthew R. Nicholson

Theses and Dissertations

Additive construction is a potential game changing innovative alternative to conventional methods with regards to structural integrity, timeliness, and waste reduction, especially in remote locations. While there have been numerous studies into the material science, additive construction will not be a viable alternative until a cost analysis is performed. This paper details the cost elements for both methods. Breaking down the key variables of material, logistics and transportation, and labor costs garner a better understanding of the cost difference between the two construction methods.


An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout Mar 2021

An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout

Theses and Dissertations

Cost and schedule overrun plague over 50 of all construction projects, engendering diminished available funding that leads to deferred maintenance and impaired award ability for needed projects. Though existing research attempts to identify overruns sources, the results are inconclusive and frequently differ. Accordingly, this research reviews DoD construction contract data from the past ten years to identify the contract attributes of 79,894 projects that correlate with superior performance for use in future project execution. This research starts with creating a database that houses the largest single source of construction contract information. The research then evaluates the data to determine if …