Full-Text Articles in Construction Engineering and Management

Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson Mar 2011

Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson

Theses and Dissertations

Relational contracting is a method designed to improve relationships between contracted parties. The federal construction sector was a leader in the development and implementation of an early form of relational contracting known as partnering. Since then, alliancing has emerged as the new evolution of relational contracts. While it provides many potential benefits to contracting parties, alliancing has not yet been utilized in federal construction procurement, which is subject to stringent regulations. A commercially available standard form alliancing contract was selected for analysis against the Federal Acquisition Regulation. Key practices that characterize the alliancing method were identified. Utilizing a panel of …


Manpower Cost Analysis Of A Distributed En Route Support Structure Versus A Consolidated En Route Support Structure, Phillip M. Rehmert Mar 2010

Manpower Cost Analysis Of A Distributed En Route Support Structure Versus A Consolidated En Route Support Structure, Phillip M. Rehmert

Theses and Dissertations

The United States military has developed an en route support structure for airlift requirements to deploy and sustain combat forces in conflict. The Air Mobility Command (AMC) is interested in determining the cost effectiveness of two distinctly different en route structures, in particular, the cost effectiveness of one large facility versus supporting combat forces with many smaller facilities. With the current operational tempo, continued analysis must be accomplished to determine if a smaller footprint is possible in the deployment and sustainment scenarios of conflicts seen today; conflicts more centered on a leaner and faster deployment force. This research examines the …


Development Of Measures To Assess Product Modularity And Reconfigurability, Amie C. Stryker Mar 2010

Development Of Measures To Assess Product Modularity And Reconfigurability, Amie C. Stryker

Theses and Dissertations

Several fundamental benefits of modularity are agreed upon by industry including reusability, flexibility, reconfigurability and extensibility. Interfaces within or between modules which establish provide/depend relationships are the focus of current modularity measures. This research outlines a new method and measures for assessing product modularity in terms of degree of coupling and the recognized modularity benefits. A five–step analysis process is developed and used to guide the modularity assessment. Defining and decomposing products are performed first. Using the resultant functional model from the first step, the identified functions are mapped to modules in a product in the second step. In the …


Cca: Exploratory Case Study Of Construction In A Contingency Environment, Michael J. Pluger Mar 2010

Cca: Exploratory Case Study Of Construction In A Contingency Environment, Michael J. Pluger

Theses and Dissertations

Top military leadership has identified problems with the timeliness and effectiveness of DoD contingency construction support. Qualitative data was collected in order to gain clarity on the problem space and lay a foundation for solution generation and selection. Interviews were conducted with agents with experience within the Iraq and Afghanistan theater of operation as well as support functions for the Pentagon. Commanders, Engineers, Lawyers, Acquisition Attorneys, Staff Officers and Program Managers have been interviewed. The interviews have been analyzed using open coding to answer research question and identify to emergent themes and concepts. The data collected has revealed that Contingency …


An Economic Analysis Of Military Family Housing: Should The Government Continue To Privatize?, Chad A. Woods Mar 2009

An Economic Analysis Of Military Family Housing: Should The Government Continue To Privatize?, Chad A. Woods

Theses and Dissertations

Providing military family housing has always been a difficult task for the United States government. To solve the latest housing short fall, the government signed the Military Housing Privatization Initiative (MHPI) into law in 1996. Under this program the government contracts private developers to build, own, and operate housing units. The developer then collects rent through housing allowance payments. At the time MHPI was signed into law, military members were expected to pay 15 percent of their housing costs out of pocket. Subsequent legislation has increased housing allowance to provide 100 percent of all housing costs eliminating out of pocket …


An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown Mar 2009

An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown

Theses and Dissertations

A rigorous system for rating construction contractor performance does not exist for the USAF as identified by the Air Force Civil Engineer (USAF CE), Major General Del Eulberg (Eulberg, 2007). The United States Army Corp of Engineers (USACE) uses DD Form 2626 for contractor performance evaluation and contractor selection. The objective of this research is to strengthen the USAF contractor rating system by exploring USACE‘s use of DD Form 2626. Using data from DD Form 2626, statistical analysis was conducted to determine if the measured performance sub-items reflect their respective performance elements, whether the resulting performance elements relate to the …


Selecting The Best Thermal Building Insulation Using A Multi-Attribute Decision Model, Theodore J. Sotoropolis Mar 2008

Selecting The Best Thermal Building Insulation Using A Multi-Attribute Decision Model, Theodore J. Sotoropolis

Theses and Dissertations

Thermal building insulation has traditionally been viewed as a means to reduce thermal conductivity through the building envelope. Builders typically choose the least expensive material which meets the specifications in order to remain competitive. Other factors regarding long term health and environmental consequences are typically dismissed. However, a recent shift toward sustainability requires that architects and engineers take a more responsible approach to building design. This research takes a holistic approach to selecting thermal building insulation through the use of a multi-attribute decision model. Several types of insulating products from a variety of manufacturers were investigated in order to determine …


An Analysis Of Construction Cost And Schedule Performance, Michael J. Beach Mar 2008

An Analysis Of Construction Cost And Schedule Performance, Michael J. Beach

Theses and Dissertations

Cost and schedule performance are widely accepted in the literature and in industry as effective measures of the success of the project management effort expended. Earned Value Analysis (EVA) offers many metrics to objectively measure cost and schedule performance of many different types of projects. The author utilized EVA to objectively measure the cost and schedule performance of completed United States Air Force (AF) Military Construction (MILCON projects from 1990 to 2005. The impact of Major Command (MAJCOM), Construction Agent (CA), and facility type (CATCODE) and the combination of these variables on the EVA metrics of Cost Performance Index (CPI), …


Rapid Runway Repair (Rrr): An Optimization For Minimum Operating Strip (Mos) Selection, David J. Duncan Mar 2007

Rapid Runway Repair (Rrr): An Optimization For Minimum Operating Strip (Mos) Selection, David J. Duncan

Theses and Dissertations

Minimum Operating Strip (MOS) selection determines the exact placement of the MOS on the damaged runway, and therefore, the amount of munitions that need to be neutralized and the amount of damage that will need to be repaired. MOS selection, in essence, is the key determinant of the time required to attain an operational takeoff and recovery surface. Since the MOS selection stage determines the events and scope of work for all of the Rapid Runway Repair (RRR) stages that follow, it could be argued that this is the most important stage in the entire RRR process. The primary purpose …


Decision Analysis With Value Focused Thinking As A Methodology To Select Building For Deconstruction, Erika E. Maiorano Mar 2007

Decision Analysis With Value Focused Thinking As A Methodology To Select Building For Deconstruction, Erika E. Maiorano

Theses and Dissertations

The purpose of this research was to examine the reuse and recycling of building materials on Wright-Patterson Air Force Base. There are a variety of conflicting factors concerning the removal of a building and the model quantitatively evaluates alternatives with respect to the decision maker’s values. The research questions were addressed with both a comprehensive literature review as well as the implementation of the value focused thinking methodology. The model found that the temporary living facilities are the alternatives that achieve the highest value. The result of this research effort was a value model that aids decision makers in identifying …


A Decision Model For Selecting Energy Efficient Technologies For Low -Sloping Roof Tops Using Value-Focused Thinking, Michael J. Mccourt Mar 2007

A Decision Model For Selecting Energy Efficient Technologies For Low -Sloping Roof Tops Using Value-Focused Thinking, Michael J. Mccourt

Theses and Dissertations

The Air Force has a large inventory of low-sloping built up roofs (BURs) and millions of dollars are spent each year retrofitting these systems. The DOD has been directed to reduce non-renewable energy consumption by using energy-efficient technologies. These two details present a great opportunity to use the open roof space to install energy-efficient roofing technologies. The purpose of this research is to provide Air Force decision makers with a tool to assist them in deciding what roofing technologies should be installed on facilities. Value Focused-Thinking is the methodology used to construct the model, in which values were used, instead …


A Value-Focused Thinking Model For The Selection Of The Best Rigid Pavement, Partial-Depth Spall Repair Material, Benjamin G. Speer Mar 2007

A Value-Focused Thinking Model For The Selection Of The Best Rigid Pavement, Partial-Depth Spall Repair Material, Benjamin G. Speer

Theses and Dissertations

Concrete spalls on airfield pavements generate foreign object debris (FOD) that is damaging to aircraft engines, and may damage landing gear by roughening of the pavement surface. Repairing spalled concrete on aging and deteriorating airfields is essential for its safe operational use. Picking the best repair material from many products on the commercial market is difficult. There is wide variation on material properties, and good performance on certain criteria is critical to constructing long lasting repairs. Since there is currently no procedure for Air Force decision-makers to select the best rigid-pavement repair material, a model was created using Value-Focused Thinking …


Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman Mar 2006

Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman

Theses and Dissertations

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a "risk-based decision" be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a …


A Decision Model For Choosing Among Photovoltaic Technologies To Generate Electricity At Grid-Connected Air Force Facilities: A Value-Focused Approach, Mostyn O. Kellner Mar 2006

A Decision Model For Choosing Among Photovoltaic Technologies To Generate Electricity At Grid-Connected Air Force Facilities: A Value-Focused Approach, Mostyn O. Kellner

Theses and Dissertations

The United States is currently consuming fossil fuels faster than natural processes can replace them. Our nation's leaders recognize that a diverse energy portfolio including renewable energy is the key to maintaining our economy, security, and the environment. The federal government is by far the greatest energy consumer; thus, our nation's leaders have directed federal agencies to strive to increase the use of renewable energy at federal facilities. Solar electricity technologies, in the form of photovoltaics, have great potential in the renewable energy mix. Although a major strategy should be integrating photovoltaics into the design of new facilities, an important …


Estimating Required Contingency Funds For Construction Projects Using Multiple Linear Regression, Jason J. Cook Mar 2006

Estimating Required Contingency Funds For Construction Projects Using Multiple Linear Regression, Jason J. Cook

Theses and Dissertations

Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency …


Estimating Performance Time For Air Force Military Construction Projects, Greg J. Hoffman Mar 2005

Estimating Performance Time For Air Force Military Construction Projects, Greg J. Hoffman

Theses and Dissertations

The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks to identify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time prediction model. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfield pavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither model produced acceptable results for non-facility projects; however, the multiple linear regression model was found to …


An Evaluation Of Contingency Construction Methods Using Value Focused Thinking, John E. Tyron Mar 2005

An Evaluation Of Contingency Construction Methods Using Value Focused Thinking, John E. Tyron

Theses and Dissertations

Rapid Engineering Deployable, Heavy Operational Repair Squadron, Engineer (RED HORSE) Squadrons are 400-person, self-contained, combat engineer units that provide deployable and flexible expert construction capability for the United States Air Force. To help meet Air Force mission requirements, RED HORSE units currently employ a variety of traditional and innovative construction methods. But their alternatives-focused decision analysis approach to method selection limits their decision to known alternatives and may not fully achieve all of their objectives. This research developed a generic value-focused thinking (VFT) decision analysis model to help RED HORSE evaluate and select contingency construction methods. Eight alternatives were generated …


A Proposed Military Construction Facility Investment Model, Andre R. Dempsey Mar 2003

A Proposed Military Construction Facility Investment Model, Andre R. Dempsey

Theses and Dissertations

The fiscal year (FY) 1999 and FY2000 National Defense Authorization Acts (NDAA) amended Title 10 USC, Section 17, and directed the secretary of defense to report annually on the capability of installations and facilities to provide support to forces in the conduct of their missions. This has come to be known as the Installations' Readiness Report (IRR). The Air Force's IRR links facility sustainment, restoration, and modernization (SRM) requirements, with the impact on the installation's ability to support the mission associated with the particular facility class. The Air Force's centralized military construction (MILCON) program model used to program major facility …


Estimating Engineering Cost Risk Using Logistic And Multiple Regression, Vincent P. Sipple Mar 2002

Estimating Engineering Cost Risk Using Logistic And Multiple Regression, Vincent P. Sipple

Theses and Dissertations

This study explores a two-step procedure for assessing defense acquisition program cost growth using historical data. Specifically, we seek to predict whether a program will experience cost growth and, if applicable, how much costs will increase. We compile programmatic data from the Selected Acquisition Reports (SARs) between 1990 and 2000 for programs from all defense departments. We focus our analysis on cost growth in research and development dollars for the Engineering Manufacturing Development phase of acquisition. We further limit our study to only one of the seven SAR categories of cost growth engineering cost growth. We explore the use of …


Cost Analysis Between Saber And Design Bid Build Construction, Elwood Henry Mar 2000

Cost Analysis Between Saber And Design Bid Build Construction, Elwood Henry

Theses and Dissertations

The purpose of this research was to perform a cost analysis between DBB and SABER construction. The research involved traveling to Wright-Patterson and Holloman Air Force Bases to gather project information on comparable projects completed by both methods. There were a total of 46 projects collected from both bases. A methodology was developed to compare the projects completed. Projects were divided into categories containing similar types of construction. Data from the project was then used to calculate a unit cost for the project. Project comparability was demonstrated by showing the projects constructed by each method completed a similar type and …


Individual Housing Choices Among Air Force Members, Michael J. Johnson Mar 1999

Individual Housing Choices Among Air Force Members, Michael J. Johnson

Theses and Dissertations

Air Force members have three different housing choices: live in MFH, rent in the local community, or buy a house in the local community. A set of six constructs (Housing Attributes, Safety, Pet Importance, Location, Military Housing Perception, and Community) that encompass members' considerations is developed and analyzed. The data was extracted from a survey that was specifically designed to illicit the relative importance of each construct during the housing decision making process. Each construct was measured using a Likert scale score. Statistical analysis was performed to determine the overall Likert mean score for each construct. Using the Likert mean …


Analysis Of Cost Growth In Us Air Force Base Support Function Contracts, James S. Romasz Mar 1999

Analysis Of Cost Growth In Us Air Force Base Support Function Contracts, James S. Romasz

Theses and Dissertations

The United States Air Force (USAF) has outsourced a significant portion of their activities defined as commercial activities and plans to aggressively outsource more in the future. The USAF outsources its commercial activities in the form of multi-year contracts to the private sector. Cost growth (either negative or positive) has been experienced by most of these contracts. This research effort performed a review of current literature and used statistical analysis to clarify the issue: what are the causes, and extent of cost growth in USAF base-support-function contracts?. From the literature, it can be concluded that changes to the statement of …


A Predictive Model For The Determination Of The Economic Feasibility Of Construction And Demolition Waste Recycling In The Air Force, Byron L. Dixon Sep 1993

A Predictive Model For The Determination Of The Economic Feasibility Of Construction And Demolition Waste Recycling In The Air Force, Byron L. Dixon

Theses and Dissertations

This study created a model to be used at a CONUS Air Force base to determine the economic feasibility of Construction and Demolition (C&D) waste recycling. Three areas investigated to develop this model: the methods to determine amounts and types of C&D waste generated at a specific location, the markets for recycled C&D wastes, and the recycling methods currently available. From this data, gathered through records searches and interviews, a procedure was developed to perform cost/benefit analyses on the available recycling options. A model was then created based on these calculations which can arm a manager with information to either …