Open Access. Powered by Scholars. Published by Universities.®
Construction Engineering and Management Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Clemson University (112)
- California Polytechnic State University, San Luis Obispo (22)
- Technological University Dublin (10)
- University of Nebraska - Lincoln (5)
- Purdue University (4)
-
- University of Nevada, Las Vegas (3)
- Morehead State University (2)
- Southern Illinois University Carbondale (2)
- Bowling Green State University (1)
- Brigham Young University (1)
- Central Washington University (1)
- City University of New York (CUNY) (1)
- Eastern Illinois University (1)
- Fayetteville State University (1)
- Georgia Southern University (1)
- Old Dominion University (1)
- Rochester Institute of Technology (1)
- San Jose State University (1)
- Universitas Indonesia (1)
- University of Kentucky (1)
- University of South Florida (1)
- Vocational Training Council (1)
- Western Kentucky University (1)
- Keyword
-
- Construction (22)
- Education (8)
- Sustainability (8)
- Construction Management (6)
- Drone (6)
-
- UAS (5)
- BIM (4)
- Construction Education (4)
- Construction management (4)
- Technology (4)
- Workforce (4)
- Construction education (3)
- Curriculum (3)
- Emissions (3)
- Millennials (3)
- Retention (3)
- Assessment (2)
- Building Information Modeling (2)
- Central Coast (2)
- Construction Industry (2)
- Cycle Times (2)
- Diversity (2)
- Equipment (2)
- Experiential Learning (2)
- General Education (2)
- Green Building (2)
- Interdisciplinary (2)
- Leadership (2)
- Lean (2)
- NIST (2)
- Publication Year
- Publication
-
- The Professional Constructor (112)
- Construction Management (20)
- Conference papers (6)
- UNL Faculty Course Portfolios (3)
- Architectural Engineering (2)
-
- Conference Papers (2)
- Department of Construction Engineering and Management: Faculty Publications (2)
- Morehead State Theses and Dissertations (2)
- Online Journal for Workforce Education and Development (2)
- Purdue Polytechnic Masters Theses (2)
- Architecture Faculty Research (1)
- Articles (1)
- Board of Regents Documents (1)
- CSID Journal of Infrastructure Development (1)
- Department of Computer Graphics Technology Degree Theses (1)
- Doctoral (1)
- Engagement & Service-Learning Summit (1)
- Engineering Technology Faculty Publications (1)
- Graduate Student Research Papers (1)
- Honors College Theses (1)
- Journal of Global Education and Research (1)
- Journal of Research Initiatives (1)
- Level 3 (1)
- Library Philosophy and Practice (e-journal) (1)
- Master of Technology Management Plan II Graduate Projects (1)
- Publications and Research (1)
- Staff Publications (1)
- Theses and Dissertations (1)
- Theses and Dissertations--Civil Engineering (1)
- UNLV Best Teaching Practices Expo (1)
- Publication Type
- File Type
Articles 31 - 60 of 175
Full-Text Articles in Construction Engineering and Management
The Professional Constructor, Full Issue, Volume 47, Number 02
The Professional Constructor, Full Issue, Volume 47, Number 02
The Professional Constructor
No abstract provided.
Stick Built Vs. Precut Wall Framing For New Home Construction: A Comparison Of Framing Labor Hours, Waste Hauls, And Purchase Orders, Eric A. Holt, Mark Laliberte, Tristan Grant, Jordan Dentz
Stick Built Vs. Precut Wall Framing For New Home Construction: A Comparison Of Framing Labor Hours, Waste Hauls, And Purchase Orders, Eric A. Holt, Mark Laliberte, Tristan Grant, Jordan Dentz
The Professional Constructor
Due to many trends in the construction industry (material cost increase, labor shortages, supply chain issues, pandemic, market demand outpacing supply), the homebuilding industry is looking for alternative ways to frame homes. In response to the National Housing Endowment (NHE) Request for Proposal, the researchers reviewed the literature on the housing market’s current state regarding the scale and scope of the skilled construction framers shortage and the current market share of single-family framing method; stick-built vs. precut framing packages. Working with industry partners, the team analyzed time studies for multiple new home builds. It was found that precut wall framing …
Total Cost Of Ownership Of Battery-Powered Vs. Hardwired Sensor Faucets In Commercial And Educational Construction Projects, Marie Patterson, Blake Wentz
Total Cost Of Ownership Of Battery-Powered Vs. Hardwired Sensor Faucets In Commercial And Educational Construction Projects, Marie Patterson, Blake Wentz
The Professional Constructor
Owners who are pursing the construction of a new commercial building are becoming increasingly more interested in the sustainability, energy efficiency and life cycle costs of their proposed project. These owners are asking designers and construction companies to develop innovative strategies to lower their utility use and total cost in their projects. One area of opportunity to meet this owner need is the decision to use sensor lavatory faucets that are either battery-powered or hardwired.Several construction projects of various types and locations were analyzed to determine the total cost of ownership of both types of sensor faucets over a 12-year …
Best Practices For Reducing Construction Accidents Involving Hispanic Construction Workers, Michael E. Asuquo, Khalid Siddiqi
Best Practices For Reducing Construction Accidents Involving Hispanic Construction Workers, Michael E. Asuquo, Khalid Siddiqi
The Professional Constructor
The objective of this study was to determine best practices for reducing accidents among Hispanic construction workers. It was hypothesized that language barrier between the Hispanics and American workers contributed immensely to high rate of construction accidents on industrial projects. Accident case studies and questionnaire survey were both used. Data was collected through semi-structured interviews with Hispanic workers involved in industrial construction projects in Metro Atlanta. Findings from the study concluded that most accidents involving Hispanic workers were caused due to lack of communication from supervisors, ignorance of workers on work procedures, lack of equipment training, and worker negligence. Language …
Construction Management Internship: A Key Opportunity For Assessment And Continuous Curriculum Improvement, James S. Vaux, Bree Dority, Dana E. Vaux
Construction Management Internship: A Key Opportunity For Assessment And Continuous Curriculum Improvement, James S. Vaux, Bree Dority, Dana E. Vaux
The Professional Constructor
The internship is an integral part of most Construction Management curricula. Studies have noted the importance and reciprocal value of internships for the student, the employer, and the academic program. However, to date, no studies have specifically outlined the value internships provide to the CM program for assessment and evaluation. This paper examines the value of the CM internship as an indirect measure to assess and incorporate change into program curricula. With 10 years of qualitative and quantitative data collected from CM student interns, industry employers, and university internship supervisors, this study supports that CM internships are a valuable tool …
Hands-On Education Module For Modular Construction, 3d Design, And 4d Schedule, Kyle A. Kithas, Jin Ouk Choi
Hands-On Education Module For Modular Construction, 3d Design, And 4d Schedule, Kyle A. Kithas, Jin Ouk Choi
Architecture Faculty Research
A paradigm shift in teaching modular construction in higher education and K-12 is proposed as a means to increase the future adoption of the modular construction technique. To this effect, a new education module is presented to STEM educators. This education module is based on LEGOs and directed towards educators in the architecture, engineering, and construction (AEC) industry. The main objectives of the education module are to increase interest and knowledge of modular construction, acknowledge the benefits of using 3D design with 4D scheduling, and create a simulating hands-on educational opportunity. The education module is designed to allow participants to …
Determining Student Interest For A Virtual Reality Safety Training Course, Courtney Martin
Determining Student Interest For A Virtual Reality Safety Training Course, Courtney Martin
Construction Management
The purpose of Cal Poly’s Construction Management Department is to provide students with the best education they can get so they can be prepared for the challenges they may encounter in their professional careers. This research paper analyzes students' prior knowledge of virtual reality (VR) and determines the interest in creating a Construction Management (CM) technical elective covering VR and safety training which can help educate and train students about safety, hazardous jobsite situations, and accident prevention measures. This paper also examines the advantages of a VR construction training course taught on campus compared to online training without VR. VR …
Using Extended Realities To Teach Construction Management, Ryan A. Duca
Using Extended Realities To Teach Construction Management, Ryan A. Duca
Construction Management
This project aimed to analyze the implementation of extended realities to teach construction management at the university level. Extended realities in this context are referring to augmented reality (AR) and virtual reality (VR); these are the two for which funding was received by Cavrnus. The foundation for this project started with the pre-existing lesson for the California Polytechnic State University’s (Cal Poly) residential construction class. The original lesson was constructed with the students learning the wood framing of a house by reading. While this is a suitable learning method for some it is not the best for all. This project …
The Professional Constructor, Full Issue, Volume 47, Number 01
The Professional Constructor, Full Issue, Volume 47, Number 01
The Professional Constructor
No abstract provided.
Current State Of The Workforce Demographics And Knowledge Transfer Strategies In The Southeast United States, Vivek Sharma, Dhaval Gajjar, Kapil Madathil, David Davis, Shreyas Patel
Current State Of The Workforce Demographics And Knowledge Transfer Strategies In The Southeast United States, Vivek Sharma, Dhaval Gajjar, Kapil Madathil, David Davis, Shreyas Patel
The Professional Constructor
The construction industry is a very diverse industry due to the unique nature of projects and expertise within various construction companies driven by multiple regional/national factors. The United States Department of Labor reported 44% of the current US employed population will be above 65 in eleven years by 2028, making workforce studies and knowledge transfer a key driver in leading construction business models. This study conducted an in-depth investigation in the southeast region of the US on the current state of workforce demographics and the need for knowledge transfer within the ranks of management coupled with trade personnel. The study …
Perceptions Of Remote Work Within The Construction Industry Resulting From The Covid-19 Pandemic In The South Central United States, Sara B. Overturf, Ben Bigelow, Matthew Reyes
Perceptions Of Remote Work Within The Construction Industry Resulting From The Covid-19 Pandemic In The South Central United States, Sara B. Overturf, Ben Bigelow, Matthew Reyes
The Professional Constructor
Working remotely became increasingly popular over the previous two years, given organization’s need to rapidly adjust to changing conditions as a result of the Coronavirus. It allowed companies to more easily adapt to stay-at home orders and create a safer environment for their employees. While working remotely can have a positive impact on employees, there are also challenges to overcome for both employees and organizations. This study focused on understanding both the prevalence and implementation of remote work within the commercial Construction industry to face the professional challenges resulting from the Coronavirus. This paper provides insight into companies that have …
Educating The Construction Client: Training Strategy For Buyers Of Commercial Design And Construction Services, Michael J. Emmer
Educating The Construction Client: Training Strategy For Buyers Of Commercial Design And Construction Services, Michael J. Emmer
The Professional Constructor
Business owners can face a myriad of challenges when venturing into a new construction project. Most of the design and construction process is unfamiliar territory as compared to their customary business operations and owners face a wide assortment of issues when making the decision to build a new facility. Consequently, the majority of owners are entirely out of their business element when deciding to enter into the undertaking of a new building project. Since most of the risk with any given project rests with the Owner, better training and strategies for owners will lead to a higher likelihood of project …
Using Flight Simulation As A Convenient Method For Uas Flight Assessment For Contractors, Colin Dees, Joseph M. Burgett
Using Flight Simulation As A Convenient Method For Uas Flight Assessment For Contractors, Colin Dees, Joseph M. Burgett
The Professional Constructor
Operating an unmanned aircraft system (UAS) for commercial purposes in the United States requires the pilot to pass the Federal Aviation Administration’s (FAA’s) knowledge exam to earn their UAS license. The exam does not include a practical component where flight proficiency is assessed. This represents a source of risk for contractors if flight proficiency is not evaluated in another way. The National Institute of Standards and Technology is a federal agency and has developed the Basic Maneuvering Test (BMT). It is the only nationally recognized UAS flight proficiency exam. While not required, the construction industry can benefit by using this …
Impact Of Covid-19 On Sense Of Community / Student Engagement, Aaron Sauer, Richard Gebken, Richard Bruce
Impact Of Covid-19 On Sense Of Community / Student Engagement, Aaron Sauer, Richard Gebken, Richard Bruce
The Professional Constructor
The spring of 2020 was a time of unprecedented change for higher education institutions. The COVID-19 pandemic forced schools to re-think instructional delivery and the undergraduate experience as they implemented measures to protect students, faculty, and staff. Unraveling the impact of the pandemic on higher education will take many years. This study investigated how the institutional response in the return to campus following the pandemic influenced sense of community, a component of student engagement. A previously developed instrument was delivered at two construction management programs in the U.S. Midwest before and after the pandemic. The two schools were similar in …
Improving Active Learning Through Advanced Teaching Practices On An Online Course, Jin Ouk O. Choi
Improving Active Learning Through Advanced Teaching Practices On An Online Course, Jin Ouk O. Choi
UNLV Best Teaching Practices Expo
Since the outbreak of the COVID, there has been a great need to advance learning experiences and opportunities for students when the courses are taught remotely. To address the need, the author incorporated the teaching strategies learned from the Culturally Relevant & Responsive Teaching (CRRT) fellows program supported by the NSF TRANSCEnD project. In Fall 2021, the author implemented multiple new teaching techniques and strategies in the CEM453-653 course, delivered entirely online. The specific teaching practices and technologies are: 1) Delivering lectures both live (synchronous) and recordings (asynchronous); 2) Using adaptive technology (Mentimeter & WebEx Poll) with real-time feedback; 3) …
Understanding The Differences Between Industry Objectives And Institutional Learning, Kristen Schell
Understanding The Differences Between Industry Objectives And Institutional Learning, Kristen Schell
Theses and Dissertations--Civil Engineering
To combat understaffing in the construction industry, it is necessary to employ the best candidates possible. By identifying the most desirable skills in a construction employee from an industry perspective, institutional learning can better prepare graduates for the construction workforce. Currently there exists an information gap in the objectives of the construction industry and institutional learning. This gap produces graduates, professors, and employers with expectations that do not align. Reducing this gap will aid in the success of hiring recently graduated construction students who can meet the ever-changing demands of the industry. Construction students who are fresh out of college …
A Construction Workforce Training Partnership Between The State Of Wyoming, Industry, And University During Covid-19, Francois Jacobs, Renxiang Lu
A Construction Workforce Training Partnership Between The State Of Wyoming, Industry, And University During Covid-19, Francois Jacobs, Renxiang Lu
Online Journal for Workforce Education and Development
Objective: To illustrate the development and implementation of a statewide construction workforce training program between the state, industry, and university during the COVID-19 pandemic. Background: Over the last 20 years, there has been a statewide construction workforce shortage, which not only creates an imbalance on the demands in this sector but impairs the profitability of Wyoming-based construction companies. Method: The team developed and implemented an online training platform, consisting of five modules, in support of training for construction companies and their workers across the state. Results: 149 successful learners received certificates of completion for the online training modules. The success …
The Professional Constructor, Full Issue, Volume 46, Number 02
The Professional Constructor, Full Issue, Volume 46, Number 02
The Professional Constructor
No abstract provided.
Evaluation Of In-Cab Air Quality For Nonroad Diesel Construction Equipment, Phil Lewis, Sherif El Khouly, Adam Mayer, Jeremy Johnson
Evaluation Of In-Cab Air Quality For Nonroad Diesel Construction Equipment, Phil Lewis, Sherif El Khouly, Adam Mayer, Jeremy Johnson
The Professional Constructor
Previous research indicates that air quality near the cabs of nonroad diesel equipment may exceed recommended exposure limits for certain pollutants. The objective of this case study was to collect and analyze air pollutant data near the cabs of nonroad diesel equipment while performing real world activities. Using state-of-the-art instrumentation, the research team conducted 24 tests on nine different items of nonroad equipment. The team collected data related to pollutant concentrations of carbon monoxide, carbon dioxide, nitric oxide, nitrogen dioxide, particulate matter, and black carbon. Average concentrations of carbon monoxide and nitric oxide did not exceed published exposure limits on …
Prefabrication In Buildings With Focus On Emerging Mep Rack Systems, Mark Daniels, M.G. Matt Syal
Prefabrication In Buildings With Focus On Emerging Mep Rack Systems, Mark Daniels, M.G. Matt Syal
The Professional Constructor
The growth in technology and automation has influenced the construction industry to explore prefabrication alternatives in building design and construction. In addition, the shortage of skilled labor is accelerating the push for the adoption of prefabrication in building industry. This paper provides an overview of the present construction market and labor trends and summarizes various levels and categories of prefabrication. It then provides detailed information on an emerging MEP prefabricated solution known as the MEP rack systems. The implementation of the MEP rack systems is discussed with the help of a hospital case study project. It concludes with the discussion …
Case Study Of Using Unmanned Aircraft Systems To Support Bridge Inspections, Joseph M. Burgett, Gurcan Comert
Case Study Of Using Unmanned Aircraft Systems To Support Bridge Inspections, Joseph M. Burgett, Gurcan Comert
The Professional Constructor
This paper presents the results of a case study conducted to evaluate the potential benefit of unmanned aircraft systems (UAS), commonly referred to as drones, as a tool to improve the bridge inspection workflow. The study conducted two experiments to determine how well deficiencies could be detected using a UAS. Both experiments were conducted using the same test bridge. The first experiment was carried out by the bridge inspection engineers (BIEs), who had previously inspected the bridge using traditional methods. They used the drone to search for inspection points identified in the inspection report. The second experiment was conducted by …
Stick Built Vs. Panelize Wall/Truss Framing For New Home Construction: A Time Study Labor Comparison., Eric A. Holt, Jim Anzlovar, Alexander Welsh
Stick Built Vs. Panelize Wall/Truss Framing For New Home Construction: A Time Study Labor Comparison., Eric A. Holt, Jim Anzlovar, Alexander Welsh
The Professional Constructor
Due to many trends in the construction industry (material cost increase, labor shortages, supply chain issues, pandemic, market demand outpacing supply), the homebuilding industry is looking for alternative ways to frame homes. In response to the National Housing Endowment (NHE) Request for Proposal, the researchers reviewed the literature on the housing market’s current state regarding the scale and scope of the skilled construction framers shortage and the current market share of single-family framing method; stick-built vs. panelization. Working with industry part ners, the team analyzed time studies for multiple new home builds. It was found that panelized wall framing systems …
Minority And Female Participation In Construction Industry Apprenticeship Programs, Richard Bruce, Aaron Sauer, Patrick Sells, Curtis Bradford
Minority And Female Participation In Construction Industry Apprenticeship Programs, Richard Bruce, Aaron Sauer, Patrick Sells, Curtis Bradford
The Professional Constructor
According to the U.S. Bureau of Labor Statistic’s Current Population Survey, nearly 90 percent of the 10.7 million people employed in the construction industry are white males (2021). This statistic will remain unchanged unless more minorities and females are recruited into the industry. For craft workers, a primary recruitment mechanism is the registered apprenticeship program. This study analyzes the U.S. Department of Labor’s Registered Apprenticeship Database (RAPIDs) from 2000 to 2019 to identify trends for new apprentices. The study found that there was no change in the proportion of new female apprentices in the previous 20 years and no change …
Proposal For Purchase Of In-House Drone For Cal Poly’S Construction Management Department, Angel Sanchez
Proposal For Purchase Of In-House Drone For Cal Poly’S Construction Management Department, Angel Sanchez
Construction Management
Over the years, the construction industry has been steadily seeing an influx of new technology and innovation that has potential to improve the industry in many ways. One form of technology that has been introduced into the construction industry is Unmanned Aerial Systems (UAS). UAS technology includes drones, photogrammetry capabilities, and the software that links field data to analytic tools. In the past decade, drones in construction have seen a considerable amount of growth and the uses for drones in construction, therefore new job opportunities in construction have been created that require knowledge of UAS technology. As the construction industry …
Building Our Future: Positive Steps Forward For Apprenticeship Education And Training In Ireland, Roisin Murphy Dr
Building Our Future: Positive Steps Forward For Apprenticeship Education And Training In Ireland, Roisin Murphy Dr
Level 3
The construction labour market has undergone a period of considerable turbulence resulting from economic cyclicality over the last decade. While some facets of the labour market have recovered in line with economic growth, there remain challenges in attracting new apprentices. The issue is particularly pronounced for certain “wet trades”; namely bricklaying, floor and wall tiling, painting and decorating and plastering.
A mixed method research strategy was employed for the purpose of determining labour market trends for these trades, comprising of employer and apprentice surveys in addition to semi-structured interviews. Findings from the research uncover not only a shift …
The Professional Constructor, Full Issue, Volume 46, Number 01
The Professional Constructor, Full Issue, Volume 46, Number 01
The Professional Constructor
No abstract provided.
A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr.
A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr.
Doctoral
A review of the literature published surrounding new digital design and construction technologies and associated processes described within the Architecture, Engineering, and Construction (AEC) community as Building Information Modelling (BIM) or Virtual Design and Construction (VDC) reveals a gap in the theoretical understanding of the impact these technologies are having on professionals who work in this industry. The central aim of this research is to discover if there has been a shift in social dynamics as a result of the adoption of BIM in the workplace and, if there has been, to discuss the meaning of this for the industry …
How New, Innovative Technology Can Be Implemented To Combat The Construction Industry Labor Shortage, Noah David Jackson
How New, Innovative Technology Can Be Implemented To Combat The Construction Industry Labor Shortage, Noah David Jackson
The Professional Constructor
This essay addresses the construction industry’s need to compensate for the current and projected labor shortage through innovative technologies. In the first portion of this essay, three technologies that are most feasible for implementation – the Internet of Things (IoT), Drones, and Prefabrication – are detailed. The challenges faced are then discussed before the second major portion in which steps for implementation are outlined. These steps include forming partnerships, learning the process, communicating, training, implementing, and adapting and improving. The essay concludes with a discussion of how the AGC organization, and members within, can aid the industry in meeting this …
The Adaptative Construction Industry, Rhett Cox
The Adaptative Construction Industry, Rhett Cox
The Professional Constructor
The construction industry is an industry that always unites to find ways to solve problems. It is very complex and requires considerable organization, hard work, specific skills, and a whole lot of determination. In this paper, I will discuss three ways that the industry is making strides to make construction better and more efficient: (a) increased use of modular construction and prefabrication, (b) use of drones, and (c) Building Information Modeling (BIM) use. With the construction process becoming more and more complex, improving efficiency and safety has gained more attraction, especially when coping with fundamental issues such as labor shortage, …
How New, Innovative Technology And Project Execution Tools And Techniques Can Be Used To Improve The Construction Process (Including Safety And Efficiency), James L. Craig
The Professional Constructor
Humanity has often sought to utilize tools and technology to make working faster, more efficient, more comfortable, and more accurate. While humans may have started with stone tools, we have since developed complex and sophisticated mechanical and digital technologies. The construction industry has been utilizing construction technology and equipment for these same reasons for generations. While other industries have embraced the use of smart, autonomous technology and robotics, the construction industry has steadily fallen behind in this effort. In this paper, I will discuss current work using these tools and possible applications for future development.